[1]李洲洋,田锡天,贾晓亮,等.基于SEBOM的飞机制造过程管理体系研究[J].西北工业大学学报,2008,26(6):771-776.
Li Zhouyang,Tian Xitian,Jia Xiaoliang,et al. Single Enterprise BOM-based Process Management System for Aircraft Manufacturing[J]. Journal of Northwestern Polytechnical University,2008,26(6):771-776.
[2]卢鹄,于勇,杨五兵,等.飞机单一产品数据源集成模型研究[J].航空学报,2010,31(4):836-841.
Lu Hu,Yu Yong,Yang Wubing,et al. Research on Integration Model of Single Source Aircraft Product Data[J]. ACTA Aeronautica Et Astronautica Sinica,2010,31(4):836-841.
[3]赵岩,莫蓉,常智勇,等. 扩展型制造物料清单视图构建及其演绎机制[J]. 中国机械工程,2007,18(19):2334-2339.
Zhao Yan,Mo Rong,Chang Zhiyong,et al. Constitution of an Extended MBOM View and Its Deduction Mechanism[J]. China Mechanical Engineering,2007,18(19):2334-2339.
[4]吕盛坪,乔立红,刘威.制造过程数据形式化语义建模[J].机械工程学报,2012,48(10):184-191.
Lü Shengping,Qiao Lihong,Liu Wei.Formalized and Semantic Modeling of Manufacturing Process Data[J].Journal of Mechanical Engineering,2012,48(10):184-191.
[5]Caramia M,Guerriero F.A Note on the Modeling of Project Networks with Time Constraints[J].European Journal of Operational Research,2011,211(3):666-670.
[6]李若刚,王国祥,李跃,等.关于网络计划模型中的时间不确定性的讨论[J]. 系统工程与电子技术,1997,40(8):40-45.
Li Ruogang,Wang Guoxiang,Li Yue,et al. Study on Uncertainty of Activity Duration of PERT[J]. System Engineering and Electronic Technology,1997,40(8): 40-45.
[7]徐瑞,徐晓飞,崔平远.基于时间约束网络的动态规划调度算法[J]. 计算机集成制造系统-CIMS,2004,10(2):188-194.
Xu Rui,Xu Xiaofei,Cui Pingyuan. Dynamic Planning and Scheduling Algorithm Based on Temporal Constraint Network[J]. Computer Integrated Manufacturing Systems,2004,10(2):188-194.
[8]Zwick U. All Pairs Shortest Paths in Weighted Directed Graphs-exact and Almost Exact Algorithms[C]// Proceedings of the 39th IEEE Annual Symposium on Foundations of Computer Science.Los Alamitos, CA: 1998:310-319.