LU Su-Li, TANG Qiu-Hua, LI Meng. Cellular Automata Based Algorithm for Solving Assembly Line Balancing Problem of Type Ⅱ[J]. China Mechanical Engineering, 2013, 24(5): 654-658.
[1]Tang Qiuhua,Li Jie,Floudas C A,et al.Optimization Framework for Process Scheduling of Operation-dependent Automobile Assembly Lines[J].Optimization Letters,2011,6(4):797-824.
[2]Liu S B,Ng K M,Ong H L.Branch-and-bound Algorithms for Simple Assembly Line Balancing Problem[J].International Journal Advanced Manufacturing Technology,2008,36:169-177.
[3]Nearchou A C.Multi-objective Balancing of Assembly Lines by Population Heuristics[J].International Journal of Production Research,2007,46(8):2275-2297.
[4]Bautista J,Pereira J.Ant Algorithms for a Time and Space Constrained Assembly Line Balancing Problem[J].European Journal of Operational Research,2007,177:2016-2032.
[5]夏斌,高自友,李克平,等.基于元胞自动机的交通系统建模与模拟[M].北京:科学出版社,2007.
[6]Adamatzky A I.Computation of Shortest Path in Cellular Automata[J].Mathl. Comput. Modelling,1996,23(4):105-113.
[7]Andrés T.Topology Optimization Using a Hybrid Cellular Automaton Method with Local Control Rules[J].Journal of Mechanical Design November,2006,128:1205-1216.
[8]Uurda H F,Rachamadugu R,Papachritou C A.Designing Paced Assembly Lines with Fixed Number of Stations[J].European Journal of Operational Research,1997,102(3):488-501.
[9]Ozcan K.A Petri Net-based Heuristic for Simple Assembly Line Balancing Problem of Type-2[J].Int. J. Adv. Manul. Technol.,2010,46:329-338.