[1]蓝伯雄,陈晖娜.一个集成化企业生产计划模型[J].系统工程理论与实践,2001,21(9):33-41.
[2]Rom W O,Tukel O I, Muscatello J R. MRP in a Job Shop Environment Using a Resource Constrained Project Scheduling Model[J]. OMEGA -- Interna- tional Journal of Management Science, 2002,30(4): 275-286.
[3]徐晓芳,张伟,叶春明.APS剖析[J].计算机辅助设计与制造,2002(4):13-14.
[4]Marriott P, Kleinschmidt R, Glatzer V, et al. Ad- vanced Production Planning as the Core Element of a Supply Chain[J]. Metallurgical Plant and Technol- ogy International, 2002,25 ( 1 ) : 78-80.
[5]陆杉[1].浅析APS在供应链中的应用[J].中国管理信息化,2008(20):76-79.
[6]Kolisch R. Integrated Assembly and Fabrication for Make-- to-- order Production[J]. International Jour- nal of Production Economics,2000,68(3):287-306.
[7]Moon C, Kim J S, Gen M. Advanced Planning and Scheduling Based on Precedence and Resource Con- straints for E-- plant Chains[J]. International Journal of Production Research,2004,42(15):2941-2955.
[8]程文明[1],齐二石[1].制造业供应链外包下的高级计划与排程[J].组合机床与自动化加工技术,2005(5):90-92.
[9]Gordon V, Proth J M, Chu C B. A Survey of the State--of-- the-- art of Common Due Date Assign ment and Scheduling Research[J]. European Journal of Operational Research, 2002,139 (1) : 1-25.
[10]Singh A. A Hybrid Permutation--coded Evolution- ary Algorithm for the Early/tardy Scheduling Problem[J]. Asia--Pacific Journal of Operational Research, 2010,27 (6) : 713-725.
[11]Toksari M D, GOner E. Parallel Machine Schedu- ling Problem to Minimize the Earliness/Tardiness Costs with Learning Effect and Deteriorating Jobs [J]. Journal of Intelligent Manufacturing, 2010,21 (6) :845-851.
[12]李俊芳[1],李铁克[1],王伟玲[1].约束满足混合算法求解提前/拖期Job Shop调度问题[J].计算机工程与应用,2010,46(16):12-15.
[13]Lee Y H,Jeong C S, Moon C. Advanced Planning and Scheduling with Outsourcing in Manufacturing Supply Chain[J]. Computers and Industrial Engi- neering, 2002,43 (1/2) :351-374. |