[1]GUNGOR A, GUPTA S M. Disassembly Line in Product Recovery[J]. International Journal of Production Research,2002,40(11):2569-2589.
[2]GUPTA S M, MCGOVERN S M. Disassembly Sequencing Problem: a Case Study of a Cell Phone[C]// Proceedings of the 2004 SPIE International Conference on Environmentally Conscious Manufacturing. Bellingham, USA: SPIE,2004:43-52.
[3]MCGOVERN S M, GUPTA S M. 2-opt Heuristic for the Disassembly Line Balancing Problem[C]//Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III. Bellingham, USA: SPIE,2004:71-84.
[4]KOC A, SABUNCUOGLU I, EREL E. Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an AND/OR Graph[J]. IIE Transactions,2009,41(10):866-881.
[5]MCGOVERN S M, GUPTA S M. A Balancing Method and Genetic Algorithm for Disassembly Line Balancing[J]. European Journal of Operational Research,2007,179(3):692-708.
[6]ZHANG Z F, FENG Y X, TAN J R, et al. A Novel Approach for Parallel Disassembly Design Based on a Hybrid Fuzzy-time Model[J]. Journal of Zhejiang Universityence A,2015,16(9):724-736.
[7]MCGOVERN S M, GUPTA S M. Uninformed and Probabilistic Distributed Agent Combinatorial Searches for the Unary NP-complete Disassembly Line Balancing Problem[C]//Proceedings of SPIE-The International Society for Optical Engineering. Bellingham, USA: SPIE,2005:81-92.
[8]朱兴涛, 张则强, 朱勋梦, 等. 求解多目标拆卸线平衡问题的一种蚁群算法[J]. 中国机械工程,2014,25(8):1075-1079.
ZHU Xingtao, ZHANG Zeqiang, ZHU Xunmeng, et al. An Ant Colony Optimization Algorithm for Multi-objective Disassembly Line Balancing Problem[J]. China Mechanical Engineering,2014,25(8):1075-1079.
[9]KALAYCI C B, GUPTA S M. Artificial Bee Colony Algorithm for Solving Sequence-dependent Disassembly Line Balancing Problem[J]. Expert Systems with Applications,2013,40(18):7231-7241.
[10]KALAYCI C B, GUPTA S M. A Particle Swarm Optimization Algorithm with Neighborhood-based Mutation for Sequence-dependent Disassembly Line Balancing Problem[J]. Proceedings for the Northeast Region Decision Sciences Institute,2013,69(1/4):197-209.
[11]丁力平, 谭建荣, 冯毅雄, 等. 基于Pareto蚁群算法的拆卸线平衡多目标优化[J]. 计算机集成制造系统,2009,15(7):1406-1413.
DING Liping, TAN Jianrong, FENG Yixiong, et al. Multiobjective Optimization for Disassembly Line Balancing Based on Pareto Ant Colony Algorithm[J]. Computer Integrated Manufacturing Systems,2009,15(7):1406-1413.
[12]MCGOVERN S M, GUPTA S M. Ant Colony Optimization for Disassembly Sequencing with Multiple Objectives[J]. International Journal of Advanced Manufacturing Technology,2006,30(5/6):481-496.
[13]汤洪涛, 丁彬楚, 李修琳,等. 基于改进免疫遗传算法的混合车间调度研究[J]. 中国机械工程,2014,25(9):1189-1194.
TANG Hongtao, DING Binchu, LI Xiulin. Improved Immune Genetic Algorithm for Mixed-model Scheduling Problem[J]. China Mechanical Engineering,2014,25(9):1189-1194.
[14]PAN G, LI K, OUYANG A, et al. Hybrid Immune Algorithm Based on Greedy Algorithm and Delete-cross Operator for Solving TSP[J]. Soft Computing,2016,20(2):1-12.
[15]GHOSH T, DOLOI B, DAN P K. An Immune Genetic Algorithm for Inter-cell Layout Problem in Cellular Manufacturing System[J]. Production Engineering,2015,10(2):1-18. |