[1]Miltenburg G J,Wijngaard J.The U-line Balancing Problem[J].Management Science,1994,40(10):1378-1388.
[2]Sparling D,Miltenburg J.The Mixed-model U-line Balancing Problem[J].International Journal of Production Research,1998,36(2):485-501.
[3]Scholl A,Klein R.ULINO: Optimally Balancing Ushaped JIT Assembly Lines[J].International Journal of Production Research,1999,37(4):721-736.
[4]Kim Y K,Kim S J,Kim J Y.Balancing and Sequencing Mixed-model U-lines with a Co-evolutionary Algorithm[J].Production Planning and Control,2000,11(8):754-764.
[5]Miltenburg J.Balancing and Scheduling Mixed-model U-shaped Production Lines[J].International Journal of Flexible Manufacturing Systems,2002,14(2):119-151.
[6]Urban T L,Chiang W C.An Optimal Piecewise-linear Program for the U-line Balancing Problem with Stochastic Task Times[J].European Journal of Operational Research,2006,168(3):771-782.
[7]Kara Y,Paksoy T,Chang C T.Binary Fuzzy Goal Programming Approach to Single Model Straight and U-shaped Assembly Line Balancing[J].European Journal of Operational Research,2009,195(2):335-347.
[8]Reakook H,Hiroshi K.A Multi-decision Genetic Approach for Workload Balancing of Mixed-model U-shaped Assembly Line Systems[J].International Journal of Production Research,2009,47(14):3797-3822.
[9]Balakrishnan J,Cheng C H,Ho K C,et al.The Application of Single-pass Heuristics for U-lines[J].Journal of Manufacturing Systems,2009,28(1):28-40.
[10]Rabbani M,Kazemi S M,Manavizadeh N.Mixed Model U-line Balancing Type-1 Problem:a New Approach[J].Journal of Manufacturing Systems,2012,31(2):131-138.
[11]Manavizadeh N,Hosseini N S,Rabbani M,et al.A Simulated Annealing Algorithm for a Mixed Model Assembly U-line Balancing Type-I Problem Considering Human Efficiency and Just-in-time Approach[J].Computers & Industrial Engineering,2013,64(2):669-685.
[12]Atiya A Z,Lee L,Ke X.Prediction and Analysis Impact of Operational Design of a Manual Assembly System with Walking Workers on Performance[J].International Journal of Computer Integrated Manufacturing,2013,26(6):540-560.
[13]Kim H,Park J H,Lee D,et al.Establishing the Methodologies for Human Evacuation Simulation in Marine Accidents[J].Computers & Industrial Engineering,2004,46(4):725-740.
[14]Juran D C,Schruben L W.Using Worker Personality and Demographic Information to Improve System Performance Prediction[J].Journal of Operations Management,2004,22(4):355-367.
[15]Lee D,Park J H,Kim H.A Study on Experiment of Human Behavior for Evacuation Simulation[J].Ocean Engineering,2004,31(8/9):931-941.
[16]Ryu T,Choi H S,Choi H W,et al.A Comparison of Gait Characteristics between Korean and Western People for Establishing Korean Gait Reference Data[J].International Journal of Industrial Ergonomics,2006,36(12):1023-1030.
[17]宋华明,韩玉启.基于遗传算法的U型生产线平衡[J].系统工程学报,2002,17(5):424-429.
Song Huaming, Han Yuqi.Genetic Algorithms-based U-shaped Assembly Line Balancing[J].Journal of System Engineering,2002,17(5):424-429. |