[1]Lin D P,Lee K M. A Review of the Research Meth-odology for the Re- entrant Scheduling Problem [J]. International Journal of Production Research, 2011,49(8) :2221-2242.
[2]Govind N,Roeder T,Schruben L W. A Simulation-- based Closed Queuing Network Approximation of Semiconductor Automated Material Handling Sys- tems [J]. IEEE Transactions on Semiconductor Manufacturing, 2011,24 (1) :5-13.
[3]Agrawal G K, Heragu S S. A Survey of Automated Material Handling Systems in 300mm Semiconduc- tor Fabs[J]. IEEE Transactions on Semiconductor Manufacturing, 2006, 19 ( 1 ) : 112-120.
[4]Lin J T,Wang F K, Yen P Y. Simulation Analysis of Dispatching Rules for An Automated Interbay Ma- terial Handling System in Wafer Fab[J]. Interna- tional Journal of Production Research, 2001,39 ( 6 ) : 1221-1238.
[5]Hasenbein J ,Sigireddy S,Wright R. Taking a Queue from Simulation: The Many Rules of Scheduling Semiconductor Material Handling[J]. IEEE Trans- actions, 2004,36 (8) : 39-43.
[6]Liu C Y, Liao D Y. An Optimal OHT Dispatching System for 300mm Semiconductor Manufacturing [C]//IEEE International Conference on Systems, Man and Cybernetics. Piscataway: IEEE Press, 2004: 1631-1636.
[7]Liao D Y,Jeng M D,Zhou M C. Application of Petri Nets and Lagrangian Relaxation to Scheduling Au- tomatic Material- handling Vehicles in 300mm Semiconductor Manufacturing [J]. IEEE Transac- tions on Systems, Man and Cybernetics- Part C: Applications and Reviews, 2007,37 (4) : 504-516.
[8]Liao D Y, Wang C N. Differentiated Pre-- emptive Dispatching for Automatic Materials Handling Serv- ices in 300mm Semiconductor Foundry[J]. Interna- tional Journal of Advanced Manufacturing Technol- ogy,2006,29(9/10) :890-896.
[9]Wang C N. The Heuristic Dispatching Method of Automatic Material Handling System in 300mm Semiconductor Fabrication[J]. International Journal of Innovative Computer Information and Control, 2009,5 (7) : 1927-1935.
[10]Lin J T,Wang F K,Chang Y M. A Hybrid Push/ Pull Dispatching Rule for a Photo- bay in a 300mm Wafer Fab[J]. Robotics and Computer In- tegrated Manufacturing, 2006,2 (1) : 47-55.
[11]Le-- anh T, De-- Koster M. On-- line Dispatching Rules for Vehicle--based Internal Transport Sys- tems[J]. International Journal of Production Re- search, 2005,43(8) :1711-1728.
[12]Myers R H, Montgomery D C. Response Surface Methodology:Process and Production Optimization Using Designed Experiments (Wiley Series in Probability and Statistics) [M]. New York: Wiley Inter-- Science Publications, 2009.
[13]Vinodh S,Balaji S R. Fuzzy Logic Based Leanness Assessment and Its Decision Support System[J]. International Journal of Production Research, 2011,49(13) :4027-4041.
[14]Goldberger J,Tassa T. A Hierarchical Clustering Algorithm Based on the Hungarian Method[J]. Pattern Recognition Letters, 2008, 29 ( 11 ) : 1632 - 1638.
[15]Azadegan A,Ghazinoory S,Samouei P. Fuzzy Logic in Manufacturing: A Review of Literature and a Specialized Application[J]. International Journal of Production Economics,2011,132(2) :258-270.
[16]李士勇.模糊控制[M].哈尔滨:哈尔滨工业大学出版社,2011.
[17]Mok P Y,Kwong C K,Wong W K. Optimization of Fault--tolerant Fabric- cutting Schedules Using Genetic Algorithms and Fuzzy Set Theory[J]. Eu- ropean Journal of Operational Research, 2007,177 (26) : 1876-1893.
[18]Wu L H,Mok P Y, Zhang J. An Adaptive Multi-- parameter Based Dispatching Strategy for Single-- loop Interbay Material Handling Systems[J]. Com- puters in Industry, 2011,62 : 175-186.
[19]Li B,Yang C J. Production Logistics System Based on a Hybrid Push/Pull Control Strategy in Make-- to--order Environments[J]. International Journal of Innovative Computing Information and Control, 2009,5 (5): 1343-1350.
[20]Kuo C H,Wang C H,Huang K W. Behavior Mod- eling and Control of 300mm Fab Intrabays Using Distributed Agent Oriented Petri Net[J]. IEEE Transactions on Systems, Man and Cybernetics-- Part A: Systems and Humans, 2003,33 (5) :641- 648.
[21]Wang C N,Liao D Y. Expeditious Hot Lots Han- dling in 300mm Semiconductor Foundry[C]// IEEE International Conference on Systems, Man and Cybernetics. Piscataway: IEEE Press, 2006: 4677-4681. |