Previous Articles Next Articles
LI Yingli;LI Xinyu;GAO Liang
Online:2020-12-10
															
							
																	Published:2020-12-18
															
						李颖俐;李新宇;高亮
基金资助:CLC Number:
LI Yingli;LI Xinyu;GAO Liang. Review on Hybrid Flow Shop Scheduling Problems[J]. China Mechanical Engineering, DOI: 10.3969/j.issn.1004-132X.2020.23.004.
李颖俐;李新宇;高亮. 混合流水车间调度问题研究综述[J]. 中国机械工程, DOI: 10.3969/j.issn.1004-132X.2020.23.004.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.cmemo.org.cn/EN/10.3969/j.issn.1004-132X.2020.23.004
|   [1]RIBAS I, LEISTEN R, FRAMIAN J M. Review and Classification of Hybrid Flow Shop Scheduling Problems from a Production System and a Solutions Procedure Perspective[J]. Computers & Operations Research, 2010, 37(8): 1439-1454. 
[2]RUIZ R, VZQUEZ-RODRGUEZ J A. The Hybrid Flow Shop Scheduling Problem[J]. European Journal of Operational Research, 2010, 205(1):1-18. 
[3]LEE T, LOONG Y. A Review of Scheduling Problem and Resolution Methods in Flexible Flow Shop[J]. International Journal of Industrial Engineering Computations, 2019, 10(1): 67-88. 
[4]GHASSEMI TARI F, REZAPOUR NIARI M. Multi-objective Sequence Dependent Setup Times Hybrid Flowshop Scheduling: a Literature Review[J]. International Journal of Research in Industrial Engineering, 2018, 7(3): 254-306. 
[5]XIE J, GAO L, PENG K, et al. Review on Flexible Job Shop Scheduling[J]. IET Collaborative Intelligent Manufacturing, 2019, 1(3): 67-77. 
[6]SAWIK T. Mixed Integer Programming for Scheduling Flexible Flow Lines with Limited Intermediate Buffers[J]. Mathematical and Computer Modelling, 2000, 31(13): 39-52. 
[7]TSENG C T, LIAO C J, LIAO T X. A Note on Two-stage Hybrid Flowshop Scheduling with Missing Operations[J]. Computers & Industrial Engineering, 2008, 54(3): 695-704. 
[8]GUIRCHOUN S, MARTINEAU P, BILLAUT J C. Total Completion Time Minimization in a Computer System with a Server and Two Parallel Processors[J]. Computers & Operations Research, 2005, 32(3): 599-611. 
[9]轩华,唐立新. 带多处理器任务的动态混合流水车间调度问题[J]. 计算机集成制造系统, 2007, 13(11): 2254-2260. 
XUAN Hua, TANG Lixin. Dynamic Hybrid Flowshop Scheduling Problem with Multiprocessor Tasks[J]. Computer Integrated Manufacturing Systems, 2007, 13(11): 2254-2260. 
[10]HE L, SUN S, LUO R. A Hybrid Two-stage Flowshop Scheduling Problem[J]. Asia-Pacific Journal of Operational Research, 2007, 24(1): 45-56. 
[11]GOLNESHINI F P, FAZLOLLAHTABAR H. Meta-heuristic Algorithms for a Clustering-based Fuzzy Bi-criteria Hybrid Flow Shop Scheduling Problem[J]. Soft Computing, 2019, 23(22): 12103-12122. 
[12]LIU J. Single-job Lot Streaming in m-1 Two-stage Hybrid Flowshops[J]. European Journal of Operational Research, 2008, 187(3):1171-1183. 
[13]LEI D, WANG T. Solving Distributed Two-stage Hybrid Flowshop Scheduling Using a Shuffled Frog-leaping Algorithm with Memeplex Grouping[J]. Engineering Optimization, 2020, 52(9): 1461-1474. 
[14]PENG K K, PAN Q K, GAO L, et al. An Improved Artificial Bee Colony Algorithm for Real-world Hybrid Flowshop Rescheduling in Steelmaking-refining-continuous Casting Process[J]. Computers & Industrial Engineering, 2018, 122: 235-250. 
[15]NADERI B, GOHARI S, YAZDANI M. Hybrid Flexible Flowshop Problems: Models and Solution Methods[J]. Applied Mathematical Modelling, 2014, 38(24): 5767-5780. 
[16]PAN Q K, WANG L, LI J Q, et al. A Novel Discrete Artificial Bee Colony Algorithm for the Hybrid Flowshop Scheduling Problem with Makespan Minimisation[J]. Omega, 2014, 45:42-56. 
[17]PAN Q K, RUIZ R, ALFARO-FERNNDEZ P. Iterated Search Methods for Earliness and Tardiness Minimization in Hybrid Flowshops with Due Windows[J]. Computers & Operations Research, 2017, 80: 50-60. 
[18]CHO H M, BAE S J, KIM J, et al. Bi-objective Scheduling for Reentrant Hybrid Flow Shop Using Pareto Genetic Algorithm[J]. Computers & Industrial Engineering, 2011, 61(3): 529-541. 
[19]CARPOV S, CARLIER J, NACE D, et al. Two-stage Hybrid Flow Shop with Precedence Constraints and Parallel Machines at Second Stage[J]. Computers & Operations Research, 2012, 39(3): 736-745. 
[20]PAN Q K, GAO L, WANG L, et al. Effective Heuristics and Metaheuristics to Minimize Total Flowtime for the Distributed Permutation Flowshop Problem[J]. Expert Systems with Applications, 2019, 124(6): 309-324. 
[21]PAN Q K, DONG Y. An Improved Migrating Birds Optimisation for a Hybrid Flowshop Scheduling with Total Flowtime Minimisation[J]. Information Sciences, 2014, 277: 643-655. 
[22]LUO H, FANG J, HUANG G Q. Real-time Scheduling for Hybrid Flowshop in Ubiquitous Manufacturing Environment[J]. Computers & Industrial Engineering, 2015, 84(6): 12-23. 
[23]MENG L, ZHANG C, SHAO X, et al. Mathematical Modelling and Optimisation of Energy-conscious Hybrid Flow Shop Scheduling Problem with Unrelated Parallel Machines[J]. International Journal of Production Research, 2019, 57(4): 1119-1145. 
[24]LEE G C, KIM Y D. A Branch-and-bound Algorithm for a Two-stage Hybrid Flowshop Scheduling Problem Minimizing Total Tardiness[J]. International Journal of Production Research, 2004, 42(22): 4731-4743. 
[25]MOURSLI O, POCHET Y. A Branch-and-bound Algorithm for the Hybrid Flowshop[J]. International Journal of Production Economics, 2000, 64(1/3): 113-125. 
[26]SAWIK T, SCHALLER A, TIRPAK T M. Scheduling of Printed Wiring Board Assembly in Surface Mount Technology Lines[J]. Journal of Electronics Manufacturing, 2002, 11(1): 1-17. 
[27]SAWIK T. An Exact Approach for Batch Scheduling in Flexible Flow Lines with Limited Intermediate Buffers[J]. Mathematical and Computer Modelling, 2002, 36(4/5): 461-471. 
[28]LIU Z, YAN J, CHENG Q, et al. The Mixed Production Mode Considering Continuous and Intermittent Processing for an Energy-efficient Hybrid Flow Shop Scheduling[J]. Journal of Cleaner Production, 2019, 246: 1-17. 
[29]SAWIK T. Integer Programming Approach to Production Scheduling for Make-to-order Manufacturing[J]. Mathematical and Computer Modelling, 2005, 41(1): 99-118. 
[30]SAWIK T. Hierarchical Approach to Production Scheduling in Make-to-order Assembly[J]. International Journal of Production Research, 2006, 44(4): 801-830. 
[31]孟磊磊,张超勇,任彩乐,等. 求解带有阻塞限制的 HFSP的MILP模型与改进回溯搜索算法[J]. 中国机械工程,2018,29(22): 2647-2658. 
MENG Leilei, ZHANG Chaoyong, REN Caile, et al. MILP Model and an Improved Backtracking Search Algorithm for the HFSP with Blocking Restriction[J]. China Mechanical Engineering, 2018, 29(22): 2647-2658. 
[32]MENG L L, ZHANG C Y, SHAO X Y, et al. More MILP Models for Hybrid Flow Shop Scheduling Problem and Iits Extended Problems[J]. International Journal of Production Research, 2019, 58(13):3905-3930. 
[33]任彩乐,杨旭东,张超勇,等. 面向节能的混合流水车间调度问题建模与优化[J]. 计算机集成制造系统,2019, 25(8): 1965-1980. 
REN Caile, YANG Xudong, ZHANG Chaoyong, et al. Modeling and Optimization of Energy-saving Hybrid Flow Shop Scheduling Problem[J]. Computer Integrated Manufacturing Systems, 2019, 25(8):1965-1980. 
[34]HIDRI L, ELKOSANTINI S, MABKHOT M M. Exact and Heuristic Procedures for the Two-center Hybrid Flow Shop Scheduling Problem with Transportation Times[J]. IEEE Access, 2018, 6: 21788-21801. 
[35]SOEWANDI H, ELMAGHRABY S E. Sequencing on Two-stage Hybrid Flowshops with Uniform Machines to Minimize Makespan[J]. IIE Transactions, 2003, 35(5): 467-477. 
[36]KYPARISIS G J, KOULAMAS C. A Note on Makespan Minimization in Two-stage Flexible Flow Shops with Uniform Machines[J]. European Journal of Operational Research, 2006, 175(2): 1321-1327. 
[37]THORNTON H W, HUNSUCKER J L. A New Heuristic for Minimal Makespan in Flow Shops with Multiple Processors and No Intermediate Storage[J]. European Journal of Operational Research, 2004, 152(1): 96-114. 
[38]BOTTA-GENOULAZ V. Hybrid Flow Shop Scheduling with Precedence Constraints and Time Lags to Minimize Maximum Lateness[J]. International Journal of Production Economics, 2000, 64(1/3): 101-111. 
[39]DIOS M, FERNANDEZ-VIAGAS V, FRAMINAN J M. Efficient Heuristics for the Hybrid Flow Shop Scheduling Problem with Missing Operations[J]. Computers & Industrial Engineering, 2018, 115: 88-99. 
[40]PATERNINA-ARBOLEDA C D, MONTOYA-TORRES J R, ACERO-DOMINGUEZ M J, et al. Scheduling Jobs on a K-stage Flexible Flow-shop[J]. Annals of Operations Research, 2008, 164(1): 29-40. 
[41]LEI Chuanjin, ZHAO Ning, YE Song, et al. Memetic Algorithm for Solving Flexible Flow-shop Scheduling Problems with Dynamic Transport Waiting Times[J]. Computers & Industrial Engineering, 2019, 139: 105984. 
[42]KYPARISIS G J, KOULAMAS C. Flexible Flow Shop Scheduling with Uniform Parallel Machines[J]. European Journal of Operational Research, 2006, 168(3): 985-997. 
[43]QIN Ming, WANG Runsen, SHI Zhongshun, et al. A Genetic Programming-based Scheduling Approach for Hybrid Flow Shop with a Batch Processor and Waiting Time Constraint[J]. IEEE Transactions on Automation Science and Engineering, 2019: 10.1109/TASE.2019.2947398. 
[44]WANG Shijin, WU Rouchen, CHU Feng, et al. Variable Neighborhood Search-based Methods for Integrated Hybrid Flow Shop Scheduling with Distribution[J]. Soft Computing, 2020, 24: 8917-8936. 
[45]SCHULZ S, NEUFELD J S, BUSCHER U. A Multi-objective Iterated Local Search Algorithm for Comprehensive Energy-aware Hybrid Flow Shop Scheduling[J]. Journal of Cleaner Production, 2019, 224: 421-434. 
[46]ZTOP H, TASGETIREN M F, ELIIYI D T, et al. Metaheuristic Algorithms for the Hybrid Flowshop Scheduling Problem[J]. Computers & Operations Research, 2019, 111: 177-196. 
[47]TIAN Huixin, LI Kun, LIU Wei. A Pareto-based Adaptive Variable Neighborhood Search for Biobjective Hybrid Flow Shop Scheduling Problem with Sequence-dependent Setup Time[J]. Mathematical Problems in Engineering, 2016, 2016: 1257060. 
[48]ZOHALI H, NADERI B, MOHAMMADI M, et al. Reformulation, Linearization, and a Hybrid Iterated Local Search Algorithm for Economic Lot-sizing and Sequencing in Hybrid Flow Shop Problems[J]. Computers & Operations Research, 2019, 104: 127-138. 
[49]YING K C, LIN S W. Minimizing Makespan for the Distributed Hybrid Flowshop Scheduling Problem with Multiprocessor Tasks[J]. Expert Systems with Applications, 2018, 92: 132-141. 
[50]蔡劲草, 雷德明. 考虑准备时间的分布式两阶段混合流水车间调度[J]. 计算机集成制造系统, 2020(8): 2170-2179. 
CAI Jincao, LEI Deming. Two-stage Distributed Hybrid Flowshop Scheduling Problem with Sequence-dependent Setup Times[J]. Computer Integrated Manufacturing Systems, 2020(8): 2170-2179. 
[51]SHAO Weishi, SHAO Zhongshi, PI Dechang. Modeling and Multi-neighborhood Iterated Greedy Algorithm for Distributed Hybrid Flow Shop Scheduling Problem[J]. Knowledge-based Systems, 2020, 194: 105527. 
[52]YU C, SEMERARO Q, MATTA A. A Genetic Algorithm for the Hybrid Flow Shop Scheduling with Unrelated Machines and Machine Eligibility[J]. Computers & Operations Research, 2018, 100: 211-229. 
[53]GHALEB M A, ALHARKAN I M. Particle Swarm Optimization Algorithms for Two-stage Hybrid Flowshop Scheduling Problem with No-wait[J]. Universal Journal of Electrical and Electronic Engineering, 2019, 6(2): 46-60. 
[54]LIU S, PEI J, CHENG H, et al. Two-stage Hybrid Flow Shop Scheduling on Parallel Batching Machines Considering a Job-dependent Deteriorating Effect and Non-identical Job Sizes[J]. Applied Soft Computing, 2019, 84:105701. 
[55]JIN Z, OHNO K, ITO T, et al. Scheduling Hybrid Flowshops in Printed Circuit Board Assembly Lines[J]. Production and Operations Management, 2002, 11(2): 216-230. 
[56]JIN Z, YANG Z, ITO T. Metaheuristic Algorithms for the Multistage Hybrid Flowshop Scheduling Problem[J]. International Journal of Production Economics, 2006, 100(2): 322-334. 
[57]ZHOU B H, HU L M, ZHONG Z Y. A Hybrid Differential Evolution Algorithm with Estimation of Distribution Algorithm for Reentrant Hybrid Flow Shop Scheduling Problem[J]. Neural Computing and Applications, 2018, 30(1): 193-209. 
[58]CHAMNANLOR C, SETHANAN K, GEN M, et al. Embedding Ant System in Genetic Algorithm for Re-entrant Hybrid Flow Shop Scheduling Problems with Time Window Constraints[J]. Journal of Intelligent Manufacturing, 2017, 28(8): 1915-1931. 
[59]MARICHELVAM M, GEETHA M, TOSUN . An Improved Particle Swarm Optimization Algorithm to Solve Hybrid Flowshop Scheduling Problems with the Effect of Human Factors: a Case Study[J]. Computers & Operations Research, 2020, 114:104812. 
[60]PARGAR F, ZANDIEH M, KAUPPILA O, et al. The Effect of Worker Learning on Scheduling Jobs in a Hybrid Flow Shop: a Bi-objective Approach[J]. Journal of Systems Science and Systems Engineering, 2018, 27(3): 265-291. 
[61]MOUSAVI S, MAHDAVI I, REZAEIAN J, et al. An Efficient Bi-objective Algorithm to Solve Re-entrant Hybrid Flow Shop Scheduling with Learning Effect and Setup Times[J]. Operational Research, 2018, 18(1):123-158. 
[62]FU Yaping, ZHOU Mengchu, GUO Xiwang, et al. Scheduling Dual-objective Stochastic Hybrid Flow Shop with Deteriorating Jobs via Bi-population Evolutionary Algorithm[J]. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2019: 10.1109/TSMC.2019.2907575. 
[63]SHAHVARI O, LOGENDRAN R. A Comparison of Two Stage-based Hybrid Algorithms for a Batch Scheduling Problem in Hybrid Flow Shop with Learning Effect[J]. International Journal of Production Economics, 2018, 195: 227-248. 
[64]KHARE A, AGRAWAL S. Scheduling Hybrid Flowshop with Sequence-dependent Setup Times and Due Windows to Minimize Total Weighted Earliness and Tardiness[J]. Computers & Industrial Engineering, 2019, 135: 780-792. 
[65]LI Z, ZHONG R Y, BARENJI A V, et al. Bi-objective Hybrid Flow Shop Scheduling with Common Due Date[J]. Operational Research, 2019: 10.1007/s12351-019-00470-8. 
[66]ENGIN O, ENGIN B. Hybrid Flow Shop with Multiprocessor Task Scheduling Based on Earliness and Tardiness Penalties[J]. Journal of Enterprise Information Management, 2018, 31(6): 925-936. 
[67]ZHANG X Y, CHEN L. A Re-entrant Hybrid Flow Shop Scheduling Problem with Machine Eligibility Constraints[J]. International Journal of Production Research, 2018, 56(16): 5293-5305. 
[68]WU X, LI J, SUN L. Hybrid Flow Shop Scheduling Problem in Ubiquitous Manufacturing Environment[J]. IET Collaborative Intelligent Manufacturing, 2019, 1(2): 56-66. 
[69]WANG S, WANG X, CHU F, et al. An Energy-efficient Two-stage Hybrid Flow Shop Scheduling Problem in a Glass Production[J]. International Journal of Production Research, 2020, 58(8): 2283-2314. 
[70]DAI M, TANG D, GIRET A, et al. Energy-efficient Scheduling for a Flexible Flow Shop Using an Improved Genetic-simulated Annealing Algo-rithm[J]. Robotics and Computer-Integrated Manufacturing, 2013, 29(5): 418-429. 
[71]GONG G L, CHIONG R, DENG Q W, et al. Energy-efficient Flexible Flow Shop Scheduling with Worker Flexibility[J]. Expert Systems with Applications, 2020, 141: 10.1016/j.eswa.2019.112902. 
[72]LUO H, DU B, HUANG G Q, et al. Hybrid Flow Shop Scheduling Considering Machine Electricity Consumption Cost[J]. International Journal of Production Economics, 2013, 146(2): 423-439. 
[73]ZHOU R, LEI D, ZHOU X. Multi-objective Energy-efficient Interval Scheduling in Hybrid Flow Shop Using Imperialist Competitive Algorithm[J]. IEEE Access, 2019, 7: 85029-85041. 
[74]LI J Q, SANG H Y, HAN Y Y, et al. Efficient Multi-objective Optimization Algorithm for Hybrid Flow Shop Scheduling Problems with Setup Energy Consumptions[J]. Journal of Cleaner Production, 2018, 181(20): 584-598. 
[75]CHEN T L, CHENG C Y, CHOU Y H. Multi-objective Genetic Algorithm for Energy-efficient Hybrid Flow Shop Scheduling with Lot Streaming[J]. Annals of Operations Research, 2020, 290: 813-836. 
[76]ZHANG B, PAN Q K, GAO L, et al. A Multiobjective Evolutionary Algorithm Based on Decomposition for Hybrid Flowshop Green Scheduling Problem[J]. Computers & Industrial Engineering, 2019, 136: 325-344. 
[77]ZHANG B, PAN Q K, GAO L, et al. A Three-stage Multiobjective Approach Based on Decomposition for an Energy-efficient Hybrid Flow Shop Scheduling Problem[J]. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2019, 99:1-16. 
[78]LI M, LEI D, CAI J. Two-level Imperialist Competitive Algorithm for Energy-efficient Hybrid Flow Shop Scheduling Problem with Relative Importance of Objectives[J]. Swarm and Evolutionary Computation, 2019, 49: 34-43. 
[79]GENG Kaifeng, YE Chunming, CAO Lei, et al. Multi-objective Reentrant Hybrid Flowshop Scheduling with Machines Turning on and off Control Strategy Using Improved Multi-verse Optimizer Algorithm[J]. Mathematical Problems in Engineering, 2019, 2019: 2573873. 
[80]ZHOU B, LIU W. Energy-efficient Multi-objective Scheduling Algorithm for Hybrid Flow Shop with Fuzzy Processing Time[J]. Proceedings of the Institution of Mechanical Engineers, Part I: Journal of Systems and Control Engineering, 2019, 233(10): 1282-1297. 
[81]LU C, GAO L, PAN Q, et al. A Multi-objective Cellular Grey Wolf Optimizer for Hybrid Flowshop Scheduling Problem Considering Noise Pollution[J]. Applied Soft Computing, 2019, 75: 728-749. 
[82]JIANG S L, ZHANG L. Energy-oriented Scheduling for Hybrid Flow Shop with Limited Buffers through Efficient Multi-objective Optimization[J]. IEEE Access, 2019, 7: 34477-34487. 
[83]ZHANG B, PAN Q K, GAO L, et al. A Multi-objective Migrating Birds Optimization Algorithm for the Hybrid Flowshop Rescheduling Problem[J]. Soft Computing, 2019, 23(17): 8101-8129. 
[84]BABAYAN A, HE D. Solving the N-job 3-stage Flexible Flowshop Scheduling Problem Using an Agent-based Approach[J]. International Journal of Production Research, 2004, 42(4): 777-799. 
[85]GMEZ-GASQUET P, ANDRS C, LARIO F C. An Agent-based Genetic Algorithm for Hybrid Flowshops with Sequence Dependent Setup Times to Minimise Makespan[J]. Expert Systems with Applications, 2012, 39(9): 8095-8107. 
[86]王芊博, 张文新, 王柏琳. 基于 Agent 的混合流水车间动态调度系统研究[J]. 计算机应用, 2017, 37(10): 2991-2998. 
WANG Qianbo, ZHANG Wenxin, WANG Bailin. An Agent-based System for Dynamic Hybrid Flowshop Scheduling[J]. Journal of Computer Applications, 2017, 37(10): 2991-2998. 
[87]HAN W, GUO F, SU X. A Reinforcement Learning Method for a Hybrid Flow-shop Scheduling Problem[J]. Algorithms, 2019, 12(11): 10.3390/a12110222. 
[88]FONSECA-REYNA Y C, MARTNEZ-JIMNEZ Y, CABRERA A V, et al. Optimization of Heavily Constrined Hybrid-flexible Flowshop Problems Using a Multi-agent Reinforcement Learning Approach[J]. Investigación Operacional, 2019, 40(1): 100-111. 
[89]AZADEH A, GOODARZI A H, KOLAEE M H, et al. An Efficient Simulation-neural Network-genetic Algorithm for Flexible Flow Shops with Sequence-dependent Setup Times, Job Deterioration and Learning Effects[J]. Neural Computing & Applications, 2019, 31(9): 5327-5341. 
[90]FERNANDEZ-VIAGAS V, FRAMINAN J M. Design of a Testbed for Hybrid Flow Shop Scheduling with Identical Machines[J]. Computers & Industrial Engineering, 2020, 141: 106288. 
[91]CARLIER J, NERON E. An Exact Method for Solving the Multi-processor Flow-shop[J]. Rairo-Recherche Operationnelle-Operations Research, 2000, 34(1): 1-25. 
[92]LIAO C J, TJANDRADJAJA E, CHUNG T P. An Approach Using Particle Swarm Optimization and Bottleneck Heuristic to Solve Hybrid Flow Shop Scheduling Problem[J]. Applied Soft Computing, 2012, 12(6): 1755-1764. 
[93]ZHANG W, YIN C, LIU J, et al. Multi-job Lot Streaming to Minimize the Mean Completion Time in m-1 Hybrid Flowshops[J]. International Journal of Production Economics, 2005, 96(2): 189-200. 
[94]宋代立, 张洁. 蚁群算法求解混合流水车间分批调度问题[J]. 计算机集成制造系统, 2013, 19(7): 1640-1647. 
SONG Daili, ZHANG Jie. Ant Colony Algorithm for Hybrid Flowshop Scheduling Problem with Lot Streaming[J]. Computer Integrated Manufacturing Systems, 2013, 19(7): 1640-1647. 
[95]ZHANG B, PAN Q K, GAO L, et al. An Effective Modified Migrating Birds Optimization for Hybrid Flowshop Scheduling Problem with Lot Streaming[J]. Applied Soft Computing, 2017, 52:14-27. 
[96]LI J Q, TAO X R, JIA B X, et al. Efficient Multi-objective Algorithm for the Lot-streaming Hybrid Flowshop with Variable Sub-lots[J]. Swarm and Evolutionary Computation, 2020, 52: 100600. 
[97]NEJATI M, MAHDAVI I, HASSANZADEH R, et al. Multi-job Lot Streaming to Minimize the Weighted Completion Time in a Hybrid Flow Shop Scheduling Problem with Work Shift Constraint[J]. The International Journal of Advanced Manufacturing Technology, 2014, 70(1/4): 501-514. 
[98]NADERI B, YAZDANI M. A Model and Imperialist Competitive Algorithm for Hybrid Flow Shops with Sublots and Setup Times[J]. Journal of Manufacturing Systems, 2014, 33(4): 647-653. 
[99]DEFERSHA F M, CHEN M. Mathematical Model and Parallel Genetic Algorithm for Hybrid Flexible Flowshop Lot Streaming Problem[J]. The International Journal of Advanced Manufacturing Technology, 2012, 62(1/4): 249-265. 
[100]WANG L, SHEN W. Process Planning and Scheduling for Distributed Manufacturing[M]. New York: Springer-Verlag,  2007. 
[101]王凌, 邓瑾, 王圣尧. 分布式车间调度优化算法研究综述[J]. 控制与决策, 2016, 31(1):1-11. 
WANG Ling, DENG Jin, WANG Shengyao. A Review of Distributed Shop Scheduling Problem and Resolution Methods[J]. Control and Decision, 2016, 31(1):1-11. 
[102]NADERI B, RUIZ R. The Distributed Permutation Flowshop Scheduling Problem[J]. Computers & Operations Research, 2010, 37(4): 754-768. 
[103]LEI D M, WANG T. Solving Distributed Two-stage Hybrid Flowshop Scheduling Using a Shuffled Frog-leaping Algorithm with Memeplex Grouping[J]. Engineering Optimization, 2020, 52(9): 1461-1474. 
[104]HAO J H, LI J Q, DU Y, et al. Solving Distributed Hybrid Flowshop Scheduling Problems by a Hybrid Brain Storm Optimization Algorithm[J]. IEEE Access, 2019, 99: 10.1109/ACCESS.2019.2917273. 
[105]WANG J J, WANG L. An Iterated Greedy Algorithm for Distributed Hybrid Flowshop Scheduling Problem with Total Tardiness Minimization[C]//2019 IEEE 15th International Conference on Automation Science and Engineering. Vancouver, 2019: 350-355. 
[106]ZHENG J, WANG L, WANG J J. A Cooperative Coevolution Algorithm for Multi-objective Fuzzy Distributed Hybrid Flow Shop[J]. Knowledge-based Systems, 2020,194: 105536. 
[107]LI Y L, LI X Y, GAO L, et al. A Discrete Artificial Bee Colony Algorithm for Distributed Hybrid Flowshop Scheduling Problem with Sequence-dependent Setup Times[J]. International Journal of Production Research, 2020, 10: 1-20. 
[108]LI Y, LI X, GAO L, et al. An Improved Artificial Bee Colony Algorithm for Distributed Heterogeneous Hybrid Flowshop Scheduling Problem with Sequence-dependent Setup Times[J]. Computers & Industrial Engineering, 2020, 147: 106638. 
[109]MIRABI M, GHOMI S F, JOLAI F. A Two-stage Hybrid Flowshop Scheduling Problem in Machine Breakdown Condition[J]. Journal of Intelligent Manufacturing, 2013, 24(1): 193-199. 
[110]PENG K, PAN Q K, GAO L, et al. An Improved Artificial Bee Colony Algorithm for Real-world Hybrid Flowshop Rescheduling in Steelmaking-refining-continuous Casting Process[J]. Computers & Industrial Engineering, 2018, 122: 235-250. 
[111]ZANDIEH M, GHOLAMI M. An Immune Algorithm for Scheduling a Hybrid Flow Shop with Sequence-dependent Setup Times and Machines with Random Breakdowns[J]. International Journal of Production Research, 2009, 47(24): 6999-7027. 
[112]TANG L, LIU W, LIU J. A Neural Network Model and Algorithm for the Hybrid Flow Shop Scheduling Problem in a Dynamic Environment[J]. Journal of Intelligent Manufacturing, 2005, 16(3): 361-370. 
[113]CHEN J, WANG M, KONG X T, et al. Manufacturing Synchronization in a Hybrid Flowshop with Dynamic Order Arrivals[J]. Journal of Intelligent Manufacturing, 2019, 30(7): 2659-2668. 
[114]RAHMANI D, RAMEZANIAN R. A Stable Reactive Approach in Dynamic Flexible Flow Shop Scheduling with Unexpected Disruptions: a Case Study[J]. Computers & Industrial Engineering, 2016, 98: 360-372. 
[115]LI J Q, PAN Q K, MAO K. A Hybrid Fruit Fly Optimization Algorithm for the Realistic Hybrid Flowshop Rescheduling Problem in Steelmaking Systems[J]. IEEE Transactions on Automation Science and Engineering, 2015, 13(2): 932-949. 
[116]TANG L, ZHAO Y, LIU J. An Improved Differential Evolution Algorithm for Practical Dynamic Scheduling in Steelmaking-continuous Casting Production[J]. IEEE Transactions on Evolutionary Computation, 2013, 18(2): 209-225. 
[117]TANG D, DAI M, SALIDO M A, et al. Energy-efficient Dynamic Scheduling for a Flexible Flow Shop Using an Improved Particle Swarm Optimization[J]. Computers in Industry, 2016, 81: 82-95. 
[118]LUO J, FUJIMURA S, EL BAZ D, et al. GPU Based Parallel Genetic Algorithm for Solving an Energy Efficient Dynamic Flexible Flow Shop Scheduling Problem[J]. Journal of Parallel and Distributed Computing, 2019, 133: 244-257. 
[119]MOU J, GAO L, GUO Q, et al. A Hybrid Heuristic Algorithm for Flowshop Inverse Scheduling Problem under a Dynamic Environment[J]. Cluster Computing, 2017, 20(1): 439-453. 
[120]LI J Q, PAN Q K, DUAN P Y. An Improved Artificial Bee Colony Algorithm for Solving Hybrid Flexible Flowshop with Dynamic Operation Skipping[J]. IEEE Transactions on Cybernetics, 2015, 46(6): 1311-1324. 
[121]QIN W, ZHANG J, SONG D. An Improved Ant Colony Algorithm for Dynamic Hybrid Flow Shop Scheduling with Uncertain Processing Time[J]. Journal of Intelligent Manufacturing, 2018, 29(4): 891-904. 
[122]PENG K, PAN Q K, GAO L, et al. A Multi-start Variable Neighbourhood Descent Algorithm for Hybrid Flowshop Rescheduling[J]. Swarm and Evolutionary Computation, 2019, 45: 92-112. 
[123]YIN X F, KHOO L P, CHEN C H. A Distributed Agent System for Port Planning and Scheduling[J]. Advanced Engineering Informatics, 2011, 25(3): 403-412. 
[124]HE J L, HUANG Y F, YAN W, et al. Integrated Internal Truck, Yard Crane and Quay Crane Scheduling in a Container Terminal Considering Energy Consumption[J]. Expert Systems with Applications, 2015, 42(5): 2464-2487. 
[125]陈宁, 梁承姬. 基于混合流水车间调度的自动化码头调度研究[J]. 工程研究——跨学科视野中的工程, 2018, 10(4): 373-380. 
CHEN Ning, LIANG Chengji. Research on Automatic Wharf Scheduling Based on Mixed Flow Shop Scheduling[J]. Engineering in the Interdisciplinary Field of Engineering Research, 2018, 10(4): 373-380. 
[126]万昕乐, 王恺, 陈丽君. 面向择期患者的多医院手术室联合排程研究[J]. 工业工程与管理, 2018, 23(1): 71-78. 
WAN Xinle, WANG Kai, CHEN Lijun. Multi-hospital Operating Room Combined Scheduling Study for Patients with Choice[J]. Industrial Engineering and Management, 2018, 23(1):71-78. 
[127]陈敏. 建筑废料现场分拣协调调度优化研究[J]. 运筹与管理, 2016, 25(3): 32-38. 
CHEN Min. Optimization of Construction Waste Site Sorting, Coordination and Scheduling[J]. Operations Research and Management Science, 2016, 25(3): 32-38. 
[128]ALLAHVERDI A. The Third Comprehensive Survey on Scheduling Problems with Setup Times/Costs[J]. European Journal of Operational Research, 2015, 246(2): 345-378. 
[129]FERNANDEZ-VIAGAS V, PEREZ-GONZALEZ P, FRAMINAN J M. Efficiency of the Solution Representations for the Hybrid Flow Shop Scheduling Problem with Makespan Objective[J]. Computers & Operations Research, 2019, 109: 77-88.  | 
									
| [1] | ZHENG Kun, LIAN Zhiwei, GU Xinyan, ZHU Changjian, XU Hui, FENG Xueqing. Hybrid Flow Shop Scheduling Problems with Unrelated Parallel Machine Solved by Improved Adaptive Genetic Algorithm(IAGA) with ITPX [J]. China Mechanical Engineering, 2023, 34(14): 1647-1658,1671. | 
| [2] | HE Junjie, ZHANG Jie, ZHANG Peng, WANG Junliang, ZHENG Peng, WANG Ming. Related Parallel Machine Online Scheduling Method Based on LSTM-PPO Reinforcement Learning [J]. China Mechanical Engineering, 2022, 33(03): 329-338. | 
| [3] | DU Lizhen1;WANG Zhen1;KE Shanfu1;XIONG Zixue1;LI Xinyu2. Fruit Fly Optimization Algorithm for Solving Hybrid Flow-shop Scheduling Problems [J]. China Mechanical Engineering, 2019, 30(12): 1480-1485. | 
| [4] | MENG Leilei1;ZHANG Chaoyong1;ZHAN Xinlong1;HONG Hui1;LUO Min2. Modeling of Energy-saving Unrelated Parallel Machine Scheduling Problems [J]. China Mechanical Engineering, 2018, 29(23): 2850-2858. | 
| [5] | Zhou Xin, Xu Yundou, Yao Jiantao, Zheng Kuijing, Zhao Yongsheng, . Elastodynamics Analysis of a 5-UPS/PRPU Redundantly Actuated Parallel Machine Tool [J]. China Mechanical Engineering, 2016, 27(09): 1137-1142,1149. | 
| [6] | Wang Xianhong, Shi Guoquan. Applications of a New Logic Intelligent Inference Method in Scheduling Optimization of Mixed Production Lines [J]. China Mechanical Engineering, 2015, 26(10): 1320-1323. | 
| [7] | Fang Xifeng, Zhang Sichong, Xu Qinhuan, Wang Tongyue, Liu Yuanwei, Chen Xiaogang. Structural Parameter Optimization of a Crossbar Parallel Machine Tool [J]. China Mechanical Engineering, 2015, 26(1): 37-43. | 
| [8] | Sun Chaoping, Yang Ping, Li Kai, . Multi-objective Genetic Algorithm for Parallel Machine Scheduling Problem with Outsourcing [J]. China Mechanical Engineering, 2014, 25(23): 3174-3179. | 
| [9] | Chen Xiaogang, Sun Yu, Wu Haibing, Liu Yuanwei. Distribution of Position and Orientation Errors for a 6-UPS Parallel Machine Tool [J]. China Mechanical Engineering, 2014, 25(2): 179-185. | 
| [10] | CHEN Xiao-Gang-1, 2, SUN Yu-1, LIU Yuan-Wei-2, TUN Hai-Bing-2. Position and Orientation Workspace Atlas of a 6-UPS Parallel Machine Tool [J]. China Mechanical Engineering, 2013, 24(10): 1331-1335,1339. | 
| [11] | JIANG Da-Kui, LI Bei. Multi-plant Supply Chain Scheduling with Parallel Machines Based on Taboo Search Algorithm [J]. China Mechanical Engineering, 2012, 23(6): 688-693. | 
| [12] | 
														MENG Xiang-Zhi, LI Shu-Jun. 
														
															 Design and Optimization of Balancing Mechanism for a Parallel Machine Tool 
														[J]. China Mechanical Engineering, 2010, 21(15): 1794-1797,1839.
													 | 
												
| [13] | Sun Wei;Li Chaofeng;Liu Jie;Wen Bangchun. Research and Implementation of Visual Design and Calculation System Based on Visual Basic(VB) [J]. J4, 2008, 19(19): 0-2272. | 
| [14] | He Xuehong;Zhang Min;Xie Liyang;Zuo Koucheng. Accuracy Analysis and Simulation of 3-TPT Parallel Machine Tool [J]. J4, 2008, 19(11): 0-1269. | 
| Viewed | ||||||
| 
										Full text | 
									
										 | 
								|||||
| 
										Abstract | 
									
										 | 
								|||||