[1]FANG K, UHAN N, ZHAO F, et al.A New Approach to Scheduling in Manufacturing for Power Consumption and Carbon Footprint Reduction[J].Journal of Manufacturing Systems, 2011, 30(4): 234-240.
[2]SUN Z, LI L.Opportunity Estimation for Real-time Energy Control of Sustainable Manufacturing Systems[J].IEEE Transactions on Automation Science & Engineering, 2013, 10(1):38-44.
[3]ALBADI M H, EL-SAADANY E F.A Summary of Demand Response in Electricity Markets[J].Electric Power Systems Research, 2008, 78(11):1989-1996.
[4]FANG K, UHAN N A, ZHAO F, et al.Scheduling on a Single Machine under Time-of-use Electricity Tariffs[J].Annals of Operations Research, 2016, 238(1):199-227.
[5]CHE A, ZENG Y, KE L.An Efficient Greedy Insertion Heuristic for Energy-conscious Single Machine Scheduling Problem under Time-of-use Electricity Tariffs[J].Journal of Cleaner Production, 2016, 129: 565-577.
[6]WANG S, LIU M, CHU F, et al.Bi-objective Optimization of a Single Machine Batch Scheduling Problem with Energy Cost Consideration[J].Journal of Cleaner Production, 2016, 137:1205-1215.
[7]DING J Y, SONG S, ZHANG R, et al.Parallel Machine Scheduling under Time-of-use Electricity Prices: New Models and Optimization Approaches[J].IEEE Transactions on Automation Science & Engineering, 2016, 13(2):1138-1154.
[8]UBEDA S, ARCELUS F J, FAULIN J.Green Logistics at Eroski: a Case Study[J].International Journal of Production Economics, 2011, 131(1):44-51.
[9]SUZUKI Y.A New Truck-routing Approach for Reducing Fuel Consumption and Pollutants Emission[J].Transportation Research Part D Transport & Environment, 2011, 16(1):73-77.
[10]ZHANG R, CHIONG R, MICHALEWICZ Z, et al.Sustainable Scheduling of Manufacturing and Transportation Systems[J].European Journal of Operational Research, 2016, 248(3): 741-743.
[11]CHEN Z L.Integrated Production and Outbound Distribution Scheduling: Review and Extensions[J].Operations Research, 2010, 58(1):130-148.
[12]蒋大奎, 李波.基于禁忌搜索的平行机多工厂供应链调度[J].中国机械工程, 2012, 23(6):688-693.
JIANG Dakui, LI Bo.Multi-plant Supply Chain Scheduling with Parallel Machines Based on Taboo Search Algorithm[J].China Mechanical Engineering, 2012, 23(6):688-693.
[13]LI K, ZHOU C, LEUNG Y T, et al.Integrated Production and Delivery with Single Machine and Multiple Vehicles[J].Expert Systems with Applications, 2016, 57(C):12-20.
[14]ICHOUA S, GENDREAU M, POTVIN J Y.Vehicle Dispatching with Time-dependent Travel Times[J].European Journal of Operational Research, 2003, 144(2): 379-396.
[15]刘乐.单机最大延迟重调度的和声变邻域搜索算法[J].计算机集成制造系统, 2016, 22(8):1977-1991.
LIU Le.Harmony Variable Neighborhood Search Algorithm for Single-machine Maximum Lateness Rescheduling[J].Computer Integrated Manufacturing Systems, 2016, 22(8):1977-1991.
[16]SHAHVARI O, LOGENDRAN R.An Enhanced Tabu Search Algorithm to Minimize a Bi-criteria Objective in Batching and Scheduling Problems on Unrelated-parallel Machines with Desired Lower Bounds on Batch Sizes[J].Computers & Operations Research, 2017, 77:154-176.
[17]MENNDEZ B, PARDO E G, ALONSO-AYUSO A, et al.Variable Neighborhood Search Strategies for the Order Batching Problem[J].Computers & Operations Research, 2017, 78: 500-512.
[18]李坤, 徐铮, 田慧欣.基于自适应变邻域搜索算法的一类混合流水车间调度问题[J].系统工程, 2015(11): 121-129.
LI Kun, XU Zheng, TIAN Huixin.An Adaptive Variable Neighborhood Search Algorithm for the Hybrid Flowshop Scheduling Problem[J].Systems Engineering, 2015(11):121-129. |