[1]高亮,李新宇.工艺规划与车间调度集成研究现状及进展[J].中国机械工程,2011,22(8):1001-1007.
GAO Liang,LI Xinyu.Current Researches on Integrated Process Planning and Scheduling[J].China Mechanical Engineering,2011,22(8): 1001-1007.
[2]KUMAR M,RAJOTIA S.Integration of Scheduling with Computer Aided Process Planning[J].Journal of Materials Processing Technology,2003,138(1/3):297-300.
[3]文笑雨.多目标集成式工艺规划与车间调度问题的求解方法研究[D].武汉:华中科技大学,2014.
WEN Xiaoyu.Research on the Solution Methods for Multi-objective Integrated Process Planning and Scheduling[D].Wuhan: Huazhong University of Science and Technology,2014.
[4]CHRYSSOLOURIS G,CHAN S,COBB W.Decision Making on the Factory Floor: an Integrated Approach to Process Planning and Scheduling[J].Robotics & Computer-Integrated Manufacturing,1984,1 (3/4): 315-319.
[5]吕盛坪,乔立红.工艺规划与车间调度及两者集成的研究现状和发展趋势[J].计算机集成制造系统.2014,20(2):290-300.
LYU Shengping,QIAO Lihong.Current Status and Developing Trend of Process Planning and Job Shop Scheduling[J].Computer Integrated Manufacturing Systems,2014,20(2):290-300.
[6]吕盛坪,乔立红.工艺规划与车间调度复合式集成模型[J].计算机集成制造系统,2014,20(1):110-120.
LYU Shengping,QIAO Lihong.Hybrid Integration Model for Process Planning and Scheduling[J].Computer Integrated Manufacturing Systems,2014,20(1):110-120.
[7]QIAO Lihong,LYU Shengping.An Improved Genetic Algorithm for Integrated Process Planning and Scheduling[J].International Journal of Advanced Manufacturing Technology,2012,58(5/8):727-740.
[8]LI Xinyu,GAO Liang,SHAO Xinyu.An Active Learning Genetic Algorithm for Integrated Process Planning and Scheduling[J].Expert Systems with Applications,2012,39(8):6683-6691.
[9]LUO Guofu,WEN Xiaoyu,LI Hao,et al.An Effective Multi-objective Genetic Algorithm Based on Immune Principle and External Archive for Multi-objective Integrated Process Planning and Scheduling[J].International Journal of Advanced Manufacturing Technology,2017,91(9/12):3145-3158.
[10]WONG T N,ZHANG S C,WANG G,et al.Integrated Process Planning and Scheduling : Multi-agent System with Two-stage Ant Colony Optimisation Algorithm[J].International Journal of Production Research,2012,50(21):6188-6201.
[11]LIU Xiaojun,NI Zhonghua,QIU Xiaoli.Application of Ant Colony Optimization Algorithm in Integrated Process Planning and Scheduling[J].International Journal of Advanced Manufacturing Technology,2016,84(1/4):393-404.
[12]ZHANG S C,WONG T N.Studying the Impact of Sequence-dependent Set-up Times in Integrated Process Planning and Scheduling with E-ACO Heuristic[J].International Journal of Production Research,2016,54(16):1-24.
[13]王进峰,范孝良,宗鹏程,等.一种改进的蚁群算法在工艺规划与车间调度集成优化中的应用[J].图学学报,2014,35(3):396-401.
WANG Jinfeng,FAN Xiaoliang,ZONG Pengcheng,et al.Applications of an Improved Ant Colony Optimization ACO Algorithm in Integrated Process Planning and Scheduling[J].Journal of Graphics,2014,35(3):396-401.
[14]黄学文,张晓彤,艾亚晴.基于蚁群算法的多加工路线柔性车间调度问题[J].计算机集成制造系统,2018,24(3):558-569.
HUANG Xuewen,ZHANG Xiaotong,AI Yaqing.ACO Integrated Approach for Solving Flexible Job-shop Scheduling with Multiple Process Plans[J].Computer Integrated Manufacturing Systems,2018,24(3):558-569.
[15]LIAN Kunlei,ZHANG Chaoyong,GAO Liang,et al.Integrated Process Planning and Scheduling Using an Imperialist Competitive Algorithm[J].International Journal of Production Research,2012,50(15): 4326-4343.
[16]宋栓军,杨佩莉,石雯丽.基于人工蜂群算法的柔性工艺与车间调度集成优化[J].计算机应用研究,2017,37(2):523-529.
SONG Shuanjun,YANG Peili,SHI Wenli.Optimization of Integrated Flexible Process Planning and Job Shop Scheduling Based on Artificial Bee Colony[J].Journal of Computer Applications,2017,37(2):523-529.
[17]JIN Liangliang,ZHANG Chaoyong,SHAO Xinyu.An Effective Hybrid Honey Bee Mating Optimization Algorithm for Integrated Process Planning and Scheduling Problems[J].International Journal of Advanced Manufacturing Technology,2015,80(5/8):1253-1264.
[18]YU Mingrang,ZHANG Yingjie,CHEN Kun,et al.Integration of Process Planning and SchedulingUsing a Hybrid GA/PSO Algorithm[J].International Journal of Advanced Manufacturing Technology,2015,78(1/4):583-592.
[19]ZHANG Shuai,XU Yangbing,ZHANG Wenyu,et al.Combining Extended Imperialist Competitive Algorithm with a Genetic Algorithm to Solve the Distributed Integration of Process Planning and Scheduling Problem[J].Mathematical Problems in Engineering,2017(5):1-13.
[20]LI Xinyu,ZHANG Chaoyong,GAO Liang,et al.An Agent-based Approach for Integrated Process Planning and Scheduling[J].Expert Systems with Applications,2010,37(2):1256-1264.
[21]LI Xinyu,GAO Liang,SHAO Xinyu,et al.Mathematical Modeling and Evolutionary Algorithm-based Approach for Integrated Process Planning and Scheduling[J].Computers & Operations Research,2010,37(4):656-667.
[22]LI Xinyu,GAO Liang,LI Weidong.Application of Game Theory Based Hybrid Algorithm for Multi-objective Integrated Process Planning and Scheduling[J].Expert Systems with Applications,2012,39(1):288-297.
[23]李新宇.工艺规划与车间调度集成问题的求解方法研究[D].武汉:华中科技大学,2009.
LI Xinyu.Research on the Solution Methods of Integrated Process Planning and Scheduling[D].Wuhan: Huazhong University of Science and Technology,2009.
[24]LI Xinyu,SHAO Xinyu,GAO Liang,et al.An Effective Hybrid Algorithm for Integrated Process Planning and Scheduling[J].International Journal of Production Economics,2010,126(2):289-298.
[25]金亮亮,张超勇,邵新宇.基于文化基因算法的集成工艺规划与调度研究[J].华中科技大学学报(自然科学版),2017,45(3):1-7.
JIN Liangliang,ZHANG Chaoyong,SHAO Xinyu.Memetic Algorithm for Integrated Process Planning and Scheduling[J].Journal of Huazhong University of Science and Technology (Natural Science Edition),2017,45(3):1-7.
[26]金亮亮.基于网络图与工艺规划集成的车间调度建模与优化[D].武汉:华中科技大学,2016.
JIN Liangliang.Modeling and Optimization of Network Graph-based Integrated Process Planning and Scheduling Problems[D].Wuhan: Huazhong University of Science and Technology,2016.
[27]张超勇,饶运清,刘向军,等.基于POX交叉的遗传算法求解Job-Shop调度问题[J].中国机械工程,2004,15(23):2149-2153.
ZHANG Chaoyong,RAO Yunqing,LIU Xiangjun,et al.An Improved Genetic Algorithm for the Job Shop Scheduling Problem[J].China Mechanical Engineering,2004,15(23):2149-2153.
[28]GAO Liang,LI Xinyu,WEN Xiaoyu,et al.A Hybrid Algorithm Based on a New Neighborhood Structure Evaluation Method for Job Shop Scheduling Problem[J].Computers & Industrial Engineering,2015,88(C):417-429.
[29]KIM Y K,PARK K,KO J.A Symbiotic Evolutionary Algorithm for the Integration of Process Planning and Job Shop Scheduling.[J].Computers & Operations Research,2003,30(8):1151-1171. |