Previous Articles Next Articles
ZHANG Zeqiang;CAI Ning;ZENG Yanqing;LI Liuke;ZOU Binseng
Online:
2018-11-07
Published:
2018-11-07
张则强;蔡宁;曾艳清;李六柯;邹宾森
基金资助:
CLC Number:
ZHANG Zeqiang, CAI Ning, ZENG Yanqing, LI Liuke, ZOU Binseng. Review of Modeling Theory and Solution Method for Disassembly Line Balancing Problems for Remanufacturing[J]. China Mechanical Engineering.
张则强, 蔡宁, 曾艳清, 李六柯, 邹宾森. [退役产品拆卸和回收利用]面向再制造的拆卸线平衡问题建模理论及求解方法综述[J]. 中国机械工程.
[1]刘飞, 李聪波, 曹华军, 等. 基于产品生命周期主线的绿色制造技术内涵及技术体系框架[J]. 机械工程学报, 2009, 45(12): 115-120. LIU Fei, LI Congbo, CAO Huajun, et al. Green Manufacturing Technology Connotation and System Framework Based on Product Life Cycle[J]. Journal of Mechanical Engineering, 2009, 45(12): 115-120. [2]HEZRE S, KARA Y. A Network-based Shortest Route Model for Parallel Disassembly Line Balancing Problem[J]. International Journal of Production Research, 2015, 53(6): 1849-1865. [3]KOC A, SABUNCUOGLU I, EREL E. Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an AND/OR Graph[J]. IIE Transactions, 2009, 41(10): 866-881. [4]GUPTA S M, GUNGOR A. The Disassembly Line: Balancing and Modeling[M]. New York: McGraw-Hill, 2011: 33-348. [5]DING L P, FENG Y X, TAN J R, et al. A New Multi-objective Ant Colony Algorithm for Solving the Disassembly Line Balancing Problem[J]. International Journal of Advanced Manufacturing Technology, 2010, 48(5/8): 761-771. [6]汪开普, 张则强, 朱立夏, 等. 多目标拆卸线平衡问题的Pareto遗传模拟退火算法[J]. 计算机集成制造系统, 2017, 23(6): 1277-1285. WANG Kaipu, ZHANG Zeqiang , ZHU Lixia. Pareto Genetic Simulated Annealing Algorithm for Multi-objective Disassembly Line Balancing Problem[J]. Computer Integrated Manufacturing Systems, 2017, 23(6): 1277-1285. [7]GUNGOR A, GUPTA S M. Disassembly Line in Product Recovery[J]. International Journal of Production Research, 2002, 40(11): 2569-2589. [8]KIZILKAYA E A, GUPTA S M. Dynamic Kanban System for Disassembly Line Applied to an Industrial Voice Recognition Client Unit[C]//Proceedings of SPIE: the International Society for Optical Engineering. Bellingham: SPIE, 2006:22-29. [9]GUPTA S M, MCGOVERN S M. Disassembly Sequencing Problem: a Case Study of a Cell Phone[C]//Proceedings of the 2004 SPIE International Conference on Environmentally. Bellingham: SPIE, 2004: 43-52. [10]SEIDI M, SAGHARI S. The Balancing of Disassembly Line of Automobile Engine Using Genetic Algorithm(GA) in Fuzzy Environment[J]. Industrial Engineering and Management Systems, 2016, 15(4): 364-373. [11]KALAYCI C B, HANCILAR A, GUNGOR A, et al. Multi-objective Fuzzy Disassembly Line Balancing Using a Hybrid Discrete Artificial Bee Colony Algorithm[J]. Journal of Manufacturing Systems, 2014, 37: 672-682. [12]丁力平, 谭建荣, 冯毅雄, 等. 基于Pareto蚁群算法的拆卸线平衡多目标优化[J]. 计算机集成制造系统, 2009, 15(7): 1406-1413. DING Liping, TAN Jianrong, FENG Yixiong, et al. Multi-objective Optimization for Disassembly Line Balancing Based on Pareto Ant Colony Algorithm[J]. Computer Integrated Manufacturing Systems, 2009, 15(7): 1406-1413. [13]张则强, 汪开普, 朱立夏, 等. 多目标U形拆卸线平衡问题的 Pareto蚁群遗传算法[J]. 西南交通大学学报, 2018, 53(3):628-637. ZHANG Zeqiang, WANG Kaipu, ZHU Lixia, et al. Pareto Hybrid Ant Colony and Genetic Algorithm for Multi-objective U-shaped Disassembly Line Balancing Problem[J]. Journal of Southwest Jiaotong University, 2018, 53(3): 628-637. [14]PISTOLESI F, LAZZERINI B, MURA M D, et al. EMOGA: a Hybrid Genetic Algorithm with Extremal Optimization Core for Multi-objective Disassembly Line Balancing[J]. IEEE Transactions on Industrial Informatics. 2018, 14(3): 1089-1098. [15]GAO Y, WANG Q, FENG Y, et al. An Energy-saving Optimization Method of Dynamic Scheduling for Disassembly Line[J]. Energies, 2018, 11(5): 1261. [16]MCGOVERN S M, GUPTA S M. Ant Colony Optimization for Disassembly Sequencing with Multiple Objectives[J]. International Journal of Advanced Manufacturing Technology, 2006, 30(5/6): 481-496. [17]TANG Y, ZHOU M C, ZUSSMAN E, et al. Disassembly Modeling, Planning, and Application[J]. Journal of Manufacturing Systems, 2002, 21(3): 200-217. [18]ALTEKIN F T, AKKAN C. Task-failure-driven Rebalancing of Disassembly Lines[J]. International Journal of Production Research, 2012, 50(18): 4955-4976. [19]BENTAHA M L, BATTAIA O, DOLGUI A. A Stochastic Formulation of the Disassembly Line Balancing Problem[C]//Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services. Berlin, German: Springer, 2013: 397-404. [20]METE S, IL Z A, ZCEYLAN E, et al. An Optimisation Support for the Design of Hybrid Production Lines Including Assembly and Disassembly Tasks[J]. International Journal of Production Research, 2018(3): 1-15. [21]AVIKAL S, JAIN R, MISHRA P K. A Kano Model, AHP and M-TOPSIS Method-based Technique for Disassembly Line Balancing under Fuzzy Environment[J]. Applied Soft Computing Journal, 2014, 25(5): 519-529. [22]BENTAHA M L, BATTAIA O, DOLGUI A. A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty[J]. Computers & Operations Research, 2014, 51(3): 111-122. [23]ALTEKIN F T, KANDILLER L, OZDEMIREL N E. Profit-oriented Disassembly-line Balancing[J]. International Journal of Production Research, 2008, 46(10): 2675-2693. [24]OZCEYLAN E, PAKSOY T. Reverse Supply Chain Optimisation with Disassembly Line Balancing[J]. International Journal of Production Research, 2013, 51(20): 5985-6001. [25]OZCEYLAN E, PAKSOY T, BEKTAS T. Modeling and Optimizing the Integrated Problem of Closed-loop Supply Chain Network Design and Disassembly Line Balancing[J]. Transportation Research Part E: Logistics and Transportation Review, 2014, 61: 142-164. [26]RIGGS R J, BATTAIA O, HU S J. Disassembly Line Balancing under High Variety of End of Life States Using a Joint Precedence Graph Approach[J]. Journal of Manufacturing Systems, 2015, 37: 638-648. [27]KALAYCILAR E G, AZIZOGLU M, YERALAN S. A Disassembly Line Balancing Problem with Fixed Number of Workstations[J]. European Journal of Operational Research, 2016, 249(2): 592-604. [28]ALTEKIN F T. A Piecewise Linear Model for Stochastic Disassembly Line Balancing[J]. IFAC Papers Online, 2016, 49(12): 932-937. [29]ALTEKIN F T. A Comparison of Piecewise Linear Programming Formulations for Stochastic Disassembly Line Balancing[J]. International Journal of Production Research, 2017(1): 1-23. [30]AYDEMIR-KARADAG A, TURKBEY O. Multi-objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling[J]. Computers & Industrial Engineering, 2013, 65(3): 413-425. [31]MCGOVERN S M, GUPTA S M. Greedy Algorithm for Disassembly Line Scheduling[C]//IEEE International Conference on Systems, Man and Cybernetics. Piscataway: IEEE, 2003: 1737-1744. [32]REN Y, ZHANG C, ZHAO F, et al. Disassembly Line Balancing Problem Using Interdependent Weights-based Multi-criteria Decision Making and 2-optimal Algorithm[J]. Journal of Cleaner Production, 2017,174: 1475-1486. [33]夏绪辉, 周萌, 王蕾, 等. 再制造拆卸服务生产线及其平衡优化方法[J/OL].(2017-09-24)/[2017-12-27]. http://kns.cnki.net/kcms/detail/11.5946.TP.20170924.1531.032.html. XIA Xuhui, ZHOU Meng, WANG Lei, et al. Remanufacturing Disassembly Service Line and The Balancing Optimization Method [J/OL]. (2017-09-24)/[2017-12-27]. http://kns.cnki.net/kcms/detail/11.5946.TP.20170924.1531.032.html. [34]KALAYCI C B, POLAT O, GUPTA S M. A Hybrid Genetic Algorithm for Sequence-dependent Disassembly Line Balancing Problem[J]. Annals of Operations Research, 2016, 242(2): 321-354. [35]李六柯, 张则强, 胡扬, 等. 基于多目标算法与动态仿真的带调整时间的拆卸线平衡优化方法[J]. 中国机械工程, 2017, 28(17): 2115-2124. LI Liuke, ZHANG Zeqiang, HU Yang, et al. Optimization of Disassembly Line Balancing Problems with Setup Times Based on Multi-objective Algorithm and Dynamic Simulation[J]. China Mechanical Engineering, 2017, 28(17): 2115-2124. [36]张则强, 胡扬, 陈冲. 求解拆卸线平衡问题的改进人工蜂群算法[J]. 西南交通大学学报, 2016, 51(5): 910-917. ZHANG Zeqiang, HU Yang, CHEN Chong. Research on U-shaped Disassembly Line Balancing Problem and Solving Algorithm[J]. Journal of Southwest Jiaotong University, 2016, 51(5): 910-917. [37]刘佳,王书伟. 一种混合人工蜂群算法求解顺序相依拆卸线平衡问题[J].控制与决策, 2018, 33(4): 698-704. LIU Jia, WANG Shuwei. A Hybrid Artificial Bee Colony Algorithm for Solving Sequence-dependent Disassembly Line Balancing Problem [J]. Control and Decision , 2018, 33(4): 698-704. [38]KALAYCI C B, POLAT O, GUPTA S M. A Variable Neighbourhood Search Algorithm for Disassembly Lines[J]. Journal of Manufacturing Technology Management, 2015, 26(2): 182-194. [39]汪开普, 张则强, 毛丽丽, 等. 多目标拆卸线平衡问题的Pareto人工鱼群算法[J]. 中国机械工程, 2017, 28(2): 183-190. WANG Kaipu, ZHANG Zeqiang, MAO Lili, et al. Pareto Artificial Fish Swarm Algorithm for Multi-objective Disassembly Line Balance Problems [J]. China Mechanical Engineering, 2017, 28 (2): 183-190. [40]邹宾森, 张则强, 李六柯, 等. 基于Pareto改进猫群优化算法的多目标拆卸线平衡问题[J]. 信息与控制, 2017, 46(4): 503-512. ZOU Binsen, ZHANG Zeqiang, LI Liuke, et al. Multi-objective Disassembly Line Balancing Problem Based on Pareto Improved Cat Swarm Optimization Algorithm [J]. Information and Control, 2017, 46(4): 503-512. [41]ZHU L, ZHANG Z, WANG Y. A Pareto Firefly Algorithm for Multi-objective Disassembly Line Balancing Problems with Hazard Evaluation[J]. International Journal of Production Research. DOI: 10. 1080/00207543. 2018. 1471238. [42]OZCEYLAN E, KALAYCI C B, GUNGOR A, et al. Disassembly Line Balancing Problem: a Review of the State of the Art and Future Directions[J]. International Journal of Production Research, 2018(1): 1-23. [43]邹宾森, 张则强, 李六柯, 等. 双边拆卸线平衡问题建模与优化[J]. 中国机械工程, 2018, 29(9): 1090-1097. ZOU Binsen, ZHANG Zeqiang, LI Liuke, et al. Modeling and Optimization for Two-sided Disassembly Line Balancing Problems [J]. China Mechanical Engineering, 2018, 29(9): 1090-1097. [44]AGRAWAL S, TIWARI M K. A Collaborative Ant Colony Algorithm to Stochastic Mixed-model U-shaped Disassembly Line Balancing and Sequencing Problem[J]. International Journal of Production Research, 2008, 46(6): 1405-1429. [45]BENTAHA M L, BATTAIA O, DOLGUI A. An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing Times[J]. International Journal of Production Research, 2015, 53(6): 1807-1818. [46]BENTAHA M L, BATTAIA O, DOLGUI A, et al. Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints[J]. European Journal of Operational Research, 2015, 247(3): 957-967. [47]ZHANG Z, WANG K, ZHU L, et al. A Pareto Improved Artificial Fish Swarm Algorithm for Solving a Multi-objective Fuzzy Disassembly Line Balancing Problem[J]. Expert Systems with Applications, 2017, 86: 165-176. [48]AVIKAL S, MISHRA P. A New U-shaped Heuristic for Disassembly Line Balancing Problems[J]. Internaional Journal of Science, 2012,1(1): 2277-7261. [49]谷新军, 郭秀萍. 随机混流U形拆卸线平衡排序问题多目标进化算法优化[J]. 运筹与管理, 2017, 26(9): 52-61. GU Xinjun, GUO Xiuping. Multi-objective Evolutionary Algorithm Optimization of Stochastic Mixed-model U-shaped Disassembly Line Balancing and Sequencing Problem [J]. Operations Research and Management Science, 2017, 26(9): 52-61. [50]ALTEKIN F T, KANDILLER L, OZDEMIREL N E. Disassembly Line Balancing with Limited Supply and Subassembly Availability[J]. Proceedings of SPIE: the International Society for Optical Engineering. Bellingham: SPIE, 2004: 59-70. [51]李六柯, 张则强, 朱立夏, 等. 多目标不完全拆卸线平衡问题的建模与优化[J]. 机械工程学报, 2018, 54(3): 125-136. LI Liuke, ZHANG, Zeqiang, ZHU Lixia, et al. Modeling and Optimizing for Multi-objective Partial Disassembly Line Balancing Problem [J]. Journal of Mechanical Engineering, 2018, 54(3): 125-136. [52]OZCEYLAN E, PAKSOY T. Fuzzy Mathematical Programming Approaches for Reverse Supply Chain Optimization with Disassembly Line Balancing Problem[J]. Journal of Intelligent & Fuzzy Systems, 2014, 26(4): 1969-1985. [53]KANNAN D, GARG K, JHA P C, et al. Integrating Disassembly Line Balancing in the Planning of a Reverse Logistics Network from the Perspective of a Third Party Provider[J]. Annals of Operations Research, 2017, 253(1):353-376. |
[1] | LIANG Yongbin, FU Guang, LIN Zhigui, HE Zhicheng, ZHANG Jialuo, CHEN Tao. Design of Lane Keeping Assist Systems Based on Improved Preview Control Model [J]. China Mechanical Engineering, 2024, 35(03): 548-558. |
[2] | JIAO Feng, LI Chenglong, NIU Ying, MA Xiaosan. Review and Prospect of Grinding Wheel Dressing Technique [J]. China Mechanical Engineering, 2021, 32(20): 2435-2448. |
[3] | QIU Shaolin;QIAN Lijun;LU Jianhui. Lane-change Control for Intelligent Vehicles Based on Optimal Preview [J]. China Mechanical Engineering, 2019, 30(23): 2778-2783. |
[4] | ZOU Binsen;ZHANG Zeqiang;LI Like;CAI Ning. Modeling and Optimization for Two-sided Disassembly Line Balancing Problems [J]. China Mechanical Engineering, 2018, 29(09): 1090-1097,1107. |
[5] | LI Liuke;ZHANG Zeqiang;HU Yang;ZOU Binsen. Optimization of Disassembly Line Balancing Problems with Setup Times Based on Multi-objective Algorithm and Dynamic Simulation [J]. China Mechanical Engineering, 2017, 28(17): 2115-2124. |
[6] | WANG Kaipu, ZHANG Zeqiang, MAO Lili, LI Liuke. Pareto Artificial Fish Swarm Algorithm for Multi-objective Disassembly Line Balancing Problems [J]. China Mechanical Engineering, 2017, 28(02): 183-190. |
[7] | Wang Guobiao, Song Jianli, . Review and Analysis of State Key Laboratory Evaluation in Mechanical Engineering [J]. China Mechanical Engineering, 2016, 27(24): 3338-3345. |
[8] | Zhu Xingtao, Zhang Zeqiang, Zhu Xunmeng, Hu Junyi. An Ant Colony Optimization Algorithm for Multi-objective Disassembly Line Balancing Problem [J]. China Mechanical Engineering, 2014, 25(8): 1075-1079. |
[9] | Peng Jiangang, Liu Mingzhou, Zhang Mingxin, Zhang Xi. Review on Scheduling Algorithms for MOFJSP [J]. China Mechanical Engineering, 2014, 25(23): 3244-3254. |
[10] | Huang Xichang, Zong Zhijian. Intelligent Steering Control Strategy of EV Based on Improved Preview Following Algorithm [J]. China Mechanical Engineering, 2014, 25(14): 1984-1987. |
[11] | WANG Hui, LI Xiao-Long, WANG Gang, XIANG Dong, RONG Yi-Ming. Research on Failure of Wind Turbine Gearbox and Recent Development of Its Design and Manufacturing Technologies [J]. China Mechanical Engineering, 2013, 24(11): 1542-1549. |
[12] | CENG Yi-Hui-1, 2, ZHOU Yo-Cai-2, LIU Dao-Cai-1, ZUO Jing-Song-3. Study on Complex Control Strategy for Semi-active Suspension of Tracked Vehicles [J]. China Mechanical Engineering, 2013, 24(08): 1090-1096. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||