Wang Xianhong, Shi Guoquan. Construction of a Planning and Dispatching Model Based on Cellular Manufacturing and Time Task Bus[J]. China Mechanical Engineering, 2015, 26(5): 637-640.
[1]Rondeau P J,Litteral L A.Evolution of Manufacturing Planning and Control Systems:From Recorder Point to Enterprise Resource Planning[J]. Production and Inventory Management Journal,2001,42(2):1-7
[2]彭运芳.多品种混流制造车间运作控制方法研究与应用[D].武汉:华中科技大学,2009.
[3]尚文利,范玉顺.成批生产计划调度的集成建模与优化[J].计算机集成制造系统,2005,11(12):1663-1667.
Shang Wenli, Fan Yushun. Integrated Optimization Modeling of Production Planning & Scheduling for Batch Production[J]. Computer Integrated Manufacturing Systems, 2005,11(12):1663-1667.
[4]陈荣秋,马士华. 生产与运作管理[M]. 北京: 高等教育出版社,1996.
[5]严洪森,夏琦峰,朱闵如,等.汽车装配车间生产计划与调度的同时优化方法[J].自动化学报,2002,28(6):911-919.
Yan Hongsen, Xia Qifeng, Zhu Minru,et al. Approaches to Simultaneous Production Planning and Scheduling in Automobile Assembly Workshops[J]. Acta Automatica Sinica, 2002,28(6):911-919.
[6]王军强,孙树栋,王东成,等. 基于约束理论的制造单元管理与控制研究[J]. 计算机集成制造系统,2006,12(7):1108-1116.
Wang Junqiang, Sun Shudong, Wang Dongcheng, et al. Management & Control of Manufacturing Cells Based on Theory of Constrains[J]. Computer Integrated Manufacturing Systems,2006, 12(7) :1108-1116.
[7]熊红云,何钺.面向柔性生产线的分批与调度集成模型及遗传算法[J].长沙铁道学院学报,2001,19(1):51-55.
Xiong Hongyun, He Yue.An Integration Model Jointing Lot-Sizing and Scheduling for Flexible Flow-line and Its Genetic Heurstic Algorithm[J]. Journal of Changsha Railway University, 2001,19(1):51-55.
[8]林慧萍,范玉顺,吴澄.基于分层调度模型的生产计划和调度集成研究[J].计算机集成制造系统,2002,8(8):602-606.
Lin Huiping, Fan Yushun, Wu Cheng. Research of Integrated Planning and Scheduling Based on Hierarchy Scheduling Model[J]. Computer Integrated Manufacturing Systems,2002,8(8):602-606.