[1]Pindo M L. Scheduling: Theory, Algorithms, and Systems[M]. 4ed.Berlin:Springer, 2012.
[2]Goren S, SabuncuoluI. Optimization of Schedule Robustness and Stability under Random Machine Breakdowns and Processing Time Variability[J]. IIE Transactions, 2009, 42(3):203-220.
[3]Lei D. IntervalJob Shop Scheduling Problems[J]. The International Journal of Advanced Manufacturing Technology, 2012, 60(1/4): 291-301.
[4]Daniels R L, Kouvelis P. Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-stage Production[J]. Institute for Operations Research and the Management Sciences, 1995,41(2):363-376.
[5]刘琳,古寒雨,席裕庚. 加工时间不确定的Just-in-time单机鲁棒调度[J]. 控制与决策,2007,22(10):1151-1156.
Liu Lin, Gu Hanyu, Xi Yugeng. Robust Scheduling in a Just-in-time Single Machine System with Processing Time Uncertainty[J]. Control and Decision, 2007,22(10):1151-1156.
[6]Xu X Q, Cui W T, Lin J, et al. Robust Makespan Minimization in Identical Parallel Machine Scheduling Problem with Interval Data[J]. International Journal of Production Research, 2013,51(12):1-17.
[7]Herrmann J W. A Genetic Algorithm for a Minimax Network Design Problem[J]. Technical Research Report, 1999, 99(12).
[8]Jensen M T. A New Look at Solving Minimax Problems with Coevolution[C]//MIC’2001-4th Metaheuristics International Conference. Porto, Portugal ,2001:103-107.
[9]郑泳凌,马龙华,钱积新. SGA(Simplex-Genetic Algorithm):一类求解Minimax问题的通用算法[J].系统工程理论与实践,2002,22(12):33-38.
Zheng Yongling, Ma Longhua, Qian Jixin. SGA(Simplex-Genetic Algorithm):a Universal Algorithm for Solving Minimax Problem[J]. Systems Engineering-theory & Practice, 2002, 22(12):33-38.
[10]Jensen M. Finding Worst-Case Flexible Schedules Using Coevolution[C]//GECCO 2001-In Genetic and Evolutionary Computation Conference. San Francisco,USA, 2001:1144-1151.
[11]同济大学数学系.高等数学(第六册)[M].北京:高等教育出版社,2007.
[12]王凌.车间调度及其遗传算法[M].北京:清华大学出版社,2003.
[13]张超勇,饶运清,刘向军,等. 基于POX交叉的遗传算法求解Job-Shop调度问题[J].中国机械工程,2004,15(23):2149-2153.
Zhang Chaoyong, RaoYunqing, Liu Xiangjun, et al. An Improved Genetic Algorithm for the Job Shop Scheduling Problem[J]. China Mechanical Engineering,2004,15(23):2149-2153.
|