[1] |
WEI Shupeng, TANG Hongtao, LI Xixing, YANG Guanyu, ZHANG Jian.
Dual-resource Constrained Flexible Machining Workshop Inverse Scheduling Problem
[J]. China Mechanical Engineering, 2024, 35(03): 457-471.
|
[2] |
SUN Aihong, SONG Yuchuan, YANG Yunfan, LEI Qi.
Dual Resource-constrained Flexible Job Shop Scheduling Algorithm Considering Machining Quality of Key Jobs
[J]. China Mechanical Engineering, 2022, 33(21): 2590-2600.
|
[3] |
WU Xing, ZHAI Jingjing, LOU Peihuang, HU Ya, XIAO Haining.
Deadlock-free Task Scheduling with Task Traveling Time for a Multi-load AGV System
[J]. China Mechanical Engineering, 2021, 32(23): 2840-2849.
|
[4] |
YUAN Minghai, LI Yadong, PEI Fengque, ZHANG Lizhi, GU Wenbin.
Research on Intelligent Workshop Disturbance Processing Decision by Improved Case-based Reasoning
[J]. China Mechanical Engineering, 2021, 32(20): 2458-2467,2491.
|
[5] |
LIU Xuemei;LIU Tao;GUO Huan.
Optimization of Buffer Allocations in Hybrid Production Lines Based on Availability Evaluation
[J]. China Mechanical Engineering, 2020, 31(18): 2220-2230.
|
[6] |
LIU Caijie;XU Zhitao;ZHANG Qin;ZHANG Libo;YAO Kun.
Green Scheduling of Flexible Job Shops Based on NSGA-Ⅱ under TOU Power Price
[J]. China Mechanical Engineering, 2020, 31(05): 576-585.
|
[7] |
CHEN Gang1,2;CAO Sai2;WANG Yiqun1,2;ZHAO Tuanmin3.
Finite Frequency Domain Weighting Switching Control of an Electro-hydraulic Position Control System
[J]. China Mechanical Engineering, 2017, 28(17): 2056-2061.
|
[8] |
Zou Pan, Li Beizhi, Yang Jianguo, Shi Shuo, Steven Y. Liang, .
Hierarchical Ant-Genetic Algorithm-based Multi-objective Intelligent Approach for Flexible Job Shop Scheduling
[J]. China Mechanical Engineering, 2015, 26(21): 2873-2879,2884.
|
[9] |
Wang Xianhong, Shi Guoquan.
Construction of a Planning and Dispatching Model Based on Cellular Manufacturing and Time Task Bus
[J]. China Mechanical Engineering, 2015, 26(5): 637-640.
|
[10] |
Chen Jin, Deng Yufeng, Liu Qin, Cui Junhua.
Dynamic Integration Scheduling Methods of Ultra-thin Aluminum Foil Processing
[J]. China Mechanical Engineering, 2014, 25(19): 2647-2652.
|
[11] |
Zhao Yanwei, Zhang Liping, Zhang Jingling, Wang Wanliang, Wang Haiyan.
Modeling and Optimization of Process-assembly-type Flow-shop Scheduling Problem with Energy Saving
[J]. China Mechanical Engineering, 2014, 25(16): 2196-2203.
|
[12] |
Zhou Yulin, Zhang Zhiqiang, Hou Yulei, Wang Jianxin, Yu Baolin.
Evaluation Criterions for Movement Scheme of Large Robotic Automatic Press Lines
[J]. China Mechanical Engineering, 2014, 25(14): 1900-1904.
|
[13] |
Ling Haifeng, Wang Xishan.
A Two-stage Parameter Adaptive Ant Colony Algorithm for Flexible Job Shop Scheduling Problem
[J]. China Mechanical Engineering, 2013, 24(24): 3380-3385.
|
[14] |
Hou Yulei, Zhang Zhiqiang, Tan Houjin, Wang Jianxin, Yu Baolin, Zhou Yulin.
Motor Coordination and Motion Simulation of Robot and Press in a Press Line
[J]. China Mechanical Engineering, 2013, 24(23): 3186-3190.
|
[15] |
LIU Hong-Wei, LIU Zhi-Hui.
Scheduling of Flexible Job Systems on “Manpower-Multiple Single Machine” Based on Genetic Algorithm
[J]. China Mechanical Engineering, 2013, 24(16): 2189-2194.
|