China Mechanical Engineering ›› 2014, Vol. 25 ›› Issue (23): 3244-3254.
Previous Articles Next Articles
Peng Jiangang;Liu Mingzhou;Zhang Mingxin;Zhang Xi
Online:
2014-12-10
Published:
2014-12-12
Supported by:
彭建刚;刘明周;张铭鑫;张玺
基金资助:
CLC Number:
Peng Jiangang, Liu Mingzhou, Zhang Mingxin, Zhang Xi. Review on Scheduling Algorithms for MOFJSP[J]. China Mechanical Engineering, 2014, 25(23): 3244-3254.
彭建刚, 刘明周, 张铭鑫, 张玺. 多目标柔性作业车间调度算法研究综述[J]. 中国机械工程, 2014, 25(23): 3244-3254.
[1]Conway R N, Maxwel W L, Miller L W. Theory of Scheduling[M].New York:Dover Publications INC,2003. [2]Jain A S, Meeran S. Deterministic Job-shop Scheduling: Past, Present and Future[J].European Journal of Operational Research, 1999,113 (2):390-434. [3]Blazewicz J,Finke G,Haopt G.New Trends in Machine Scheduling[J].European Journal of Operational Research, 1988,37:303-317. [4]Andries P E.计算智能导论[M].2版.北京:清华大学出版社,2010. [5]公茂果,焦李成,杨咚咚,等.进化多目标优化算法研究[J].软件学报,2009,20(2):271-289. Gong Maoguo,Jiao Licheng,Yang Dongdong,et al. Research on Evolutionary Multi-objective Optimization Algorithms[J].Journal of Software,2009,20(2):271-289. [6]Abdullah K,David W C,Alice E S.Multi-objective Optimization Using Genetic Algorithms: a Tutorial[J]. Reliability Engineering and System Safety,2006,91: 992-1007. [7]Liu A J,Yang Y,Liang X D, et al. Fuzzy and Dynamic Flexible Job-shop Scheduling with Multi-object and Multi-constraints[C]//Proceedings of the 2010 International Conference on Mechanical,Industrial,and Manufacturing Technologies(MIMT 2010). Sanya,China:331-336. [8]Xiong J,Xing L N,Chen Y W. Robust Scheduling for Multi-objective Flexible Job-shop Problems with Random Machine Breakdowns[J]. International Journal of Production Economics, 2012,141(1):112-126. [9]Xing L N, Chen Y W, Yang K W. Multi-objective Flexible Job Shop Schedule: Design and Evaluation by Simulation Modeling[J]. Applied Soft Computing,2009,9(1):362-376. [10]Montazeri M, Wassehove L N. Analysis of Scheduling Rules of an FMS[J]. Int. J. Prod. Res.,1990,28(4):785-802. [11]Zhou Defan,Jiang Jingang, Luo Chunling, et al. Multi-objective Flexible Job-shop Scheduling Method Study Based on the Integration Algorithm of GA-BP[J]. International Journal of Digital Content Technology and Its Applications, 2013,7(2):109-116. [12]Holland J H.Adaptation in Natural and Artificial Systems[M]. Cambridge:MIT Press,1992. [13]Wu Xiuli,Li Shujian. Mass Variety and Small Batch Scheduling in the Flexible Job Shop[J]. Proceedings of the 2009 2nd International Conference on Biomedical Engineering and Informatics,2009,1/4:2207-2213. [14]吴秀丽,孙树栋,余建军,等.多目标柔性作业车间调度优化研究[J].计算机集成制造系统,2006,12(5):731-736. Wu Xiuli,Sun Shudong,Yu Jianjun, et al.Research on Multi-objective Optimization for Flexible Job Shop Scheduling[J].Computer Integrated Manufacturing Systems, 2006,12(5):731-736. [15]陈华平,谷峰,卢冰原,等.自适应多目标遗传算法在柔性工作车间调度中的应用[J].系统仿真学报,2006,18(8):2271-2288. Chen Huaping,Gu Feng,Lu Bingyuan, et al.Aplication of Self-adaptive Multi-objective Genetic Algorithm in Flexible Job Shop Scheduling[J].Journal of System Simulation,2006,18(8): 2271-2288. [16]刘爱军,杨育,邢青松,等.柔性作业车间多目标动态调度[J].计算机集成制造系统,2011,17(12):2629-2637. Liu Aijun,Yang Yu,Xing Qingsong,et al. Dynamic Scheduling on Multi-objective Flexible Job Shop[J].Computer Integrated Manufacturing Systems, 2011,17(12):2629-2637. [17]Li J Q,Pan Q K,Xie S X. A Hybrid Variable Neighborhood Search Algorithm for Solving Multi-objective Flexible Job Shop Problems[J].Computer Science and Information Systems, 2010,7(4): 907-930. [18]Zhang Guohui,Gao Liang,Shi Yang. A Novel Variable Neighborhood Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problems[J].Materials and Product Technologies: Advanced Materials Research,2010,118/120: 369-373. [19]Wang Xiaojuan,Li Wenfeng,Zhang Ying.An Improved Multi-objective Genetic Algorithm for Fuzzy Flexible Job-shop Scheduling Problem[J].International Journal of Computer Applications in Technology.2013,47(2/3):280-288. [20]刘爱军,杨育,程文明,等.复杂制造环境下的改进非支配排序遗传算法[J].计算机集成制造系统,2012,18(11):2446-2458. Liu Aijun,Yang Yu,Cheng Wenming,et al. Improved NSGA for Complex Manufacturing Environment[J].Computer Integrated Manufacturing Systems,2012,18(11):2446-2458. [21]张超勇,董星,王晓娟,等.基于改进非支配排序遗传算法的多目标柔性作业车间调度[J].机械工程学报,2010,46(11):156-164. Zhang Chaoyong,Dong Xing,Wang Xiaojuan,et al. Improved NSGA-Ⅱ for the Multi-objective Flexible Job-shop Scheduling Problem[J]. Journal of Mechanical Engineering, 2010,46(11):156-164. [22]Frutos M, Olivera A C, Tohme F. A Memetic Algorithm Based on a NSGAII Scheme for the Flexible Job-shop Scheduling Problem[J].Annals of Operations Research, 2010, 181(1): 745-765. [23]Zeng Qiang,Yang Yu,Cheng Bo, et al. Research on Multi-objective Optimization for Equal Batch Splitting FJSP under Parallel and Sequence Shift Mode[J].Journal of System Simulation,2012,24(5):1046-1052. [24]曾强,杨育,沈玲,等.基于准时交货的批量生产FJSP多目标优化[J].计算机集成制造系统,2011,17(8):1780-1789. Zeng Qiang,Yang Yu,Shen Ling, et al. Multi-objective Optimization for Batch Production FJSP Based on Just in Time Delivery[J]. Computer Integrated Manufacturing Systems, 2011,17(8):1780-1789. [25]曾强,杨育,王小磊,等.基于多规则设备分配及工序排序的FJSP多目标集成优化方法[J].计算机集成制造系统,2011, 17(5):980-989. Zeng Qiang,Yang Yu,Wang Xiaolei, et al.Integrated Multi-objective Optimization Method for FJSP Based on Multiple Rule Machine Assignment and Job Sequencing[J].Computer Integrated Manufacturing Systems, 2011,17(5):980-989. [26]曾强,杨育,王小磊,等.并行机作业车间等量分批多目标优化调度[J].计算机集成制造系统,2011,17(4):816-825. Zeng Qiang,Yang Yu,Wang Xiaolei, et al. Multi-objective Optimization Method for Equal Lot Scheduling Problem of Job Shop with Parallel Machines[J].Computer Integrated Manufacturing Systems,2011,17(4):816-825. [27]Lung R I,Chira C,Dumitrescu D.An Agent-based Collaborative Evolutionary Model for Multimodal Optimization[C]//Proceedings of the 2008 GECCO Conference Companion on Genetic and Evolutionary Computation.Atlanta, 2008: 1969-1976. [28]刘爱军,杨育,邢青松,等.多目标模糊柔性车间调度中的多种群遗传算法[J].计算机集成制造系统,2011,17(9):1954-1961. Liu Aijun,Yang Yu,Xing Qingsong, et al. Multi-population Genetic Algorithm in Multi-objective Fuzzy and Flexible Job Shop Scheduling[J]. Computer Integrated Manufacturing Systems,2011,17(9):1954-1961. [29]薛锋,王慈光,牟峰.基于信息熵和混沌理论的遗传-蚁群协同优化算法[J].控制与决策, 2011,26(1):44-48. Xue Feng,Wang Ciguang,Mu Feng. Genetic and Ant Colony Collaborative Optimization Algorithm Based on Information Entropy and Chaos Theory[J].Control and Decision,2011, 26(1):44-48. [30]张敬敏,张有华,李霞.多目标柔性作业车间调度问题的混合差分算法[J].计算机工程与应用,2011,47(20):245-248. Zhang Jingmin,Zhang Youhua,Li Xia. Hybrid Differential Evolution Algorithm for Solving Multi-objective Flexible Job-shop Scheduling Problem[J].Computer Engineering and Applications,2011,47(20):245-248. [31]Grobler J, Engelbrecht A,Kok S, et al. Metaheuristics for the Multi-objective FJSP with Sequence-dependent Set-up Times, Auxiliary Resources and Machine Down Time[J].Annals of Operations Research,2010,180(1):165-196. [32]白俊杰,龚毅光,王宁生,等.多目标柔性作业车间分批优化调度[J]. 计算机集成制造系统, 2010,16(2):396-403. Bai Junjie,Gong Yiguang,Wang Ningsheng, et al. Multi-objective Flexible Job Shop Scheduling with Lot-splitting[J]. Computer Integrated Manufacturing Systems, 2010, 16(2): 396-403. [33]Ghasem M,Mehdi M. A Pareto Approach to Multi-objective Flexible Job-shop Scheduling Problem Using Particle Swarm Optimization and Local Search[J].Int. J. Production Economics, 2011,129:14-22. [34]Liu Hongbo,Abraham A, Wang Zuwen.A Multi-swarm approach to Multi-objective Flexible Job-shop Scheduling Problems[J]. Fundamenta Informaticae, 2009,95(4): 465-489. [35]Mostaghim S,Teich J. Strategies for Finding Good Local Guides in Multi-objective Particle Swarm Optimization[C]//Proceedings of the 2003 IEEE Swarm Intelligence Symposium (SIS 03). Indianapolis,2003:26-33. [36]Tripathi P K,Bandyopadhyay S,Pal Sankar K. Multi-objective Particle Swarm Optimization with Time Variant Inertia and Acceleration Coefficients[J]. Information Sciences,2007,177(22):5033-5049. [37]Xia Weijun, Wu Zhiming.An Effective Hybrid Optimization Approach for Multi-objective Flexible Job-shop Scheduling Problems[J]. Computers & Industrial Engineering, 2005,48: 409-425. [38]Shao Xinyu,Liu Weiqi,Liu Qiong, et al.Hybrid Discrete Particle Swarm Optimization for Multi-objective Flexible Job-shop Scheduling Problem[J].International Journal of Advanced Manufacturing Technology,2013,67( 9/12):2885-2901. [39]张静,王万良,徐新黎,等.混合粒子群算法求解多目标柔性作业车间调度问题[J].控制理论与应用,2012,29(6):715-722. Zhang Jing,Wang Wanliang,Xu Xinli,et al. Hybrid Particle-swarm Optimization for Multi-objective Flexible Job-shop Scheduling Problem[J]. Control Theory & Applications, 2012, 29(6):715-722. [40]Xing Lining, Chen Yingwu, Yang Kewei.Double Layer Aco Algorithm for the Multi-objective FJSSP[J]. New Generation Computing, 2008,26:313-327. [41]Luo Delin,Chen Haiping,Wu Shunxiang, et al. Hybrid Ant Colony Multi-objective Optimization for Flexible Job Shop Scheduling Problems[J]. Journal of Internet Technology,2010, 11(3):361-369. [42]Li Li,Wang Keqi.Multi-objective Flexible Job Shop Schedule Based on Improved Ant Colony Algorithm[C]//ICIA: 2009 International Conference on Information and Automation.Zhuhai, 2009:1158-1162. [43]Zhang Weicun,Zheng Pi’e,Wu Xiaodan. Ant Colony and Particle Swarm Optimization Algorithm-based Solution to Multi-objective Flexible Job-shop Scheduling Problems[J]. Journal of Computer Applications,2007,27(4):936-941. [44]施进发,焦合军,陈涛.交货期惩罚下柔性车间调度多目标Pareto优化研究[J].机械工程学报,2012,48(12):184-192. Shi Jinfa,Jiao Hejun,Chen Tao.Multi-objective Pareto Optimization on Flexible Job-shop Scheduling Problem about Due Punishment[J]. Journal of Mechanical Engineering, 2012, 48(12):184-192. [45]Liouane N,Saad I,Borne P. Ant System and Fuzzy Controller for Multi-objective Optimization of the Flexible Job Shop Scheduling Problems[J].Studies in Informatics and Control, 2007,16(2):217-226. [46]Li Junqing,Pan Quanke,Xie Shengxian.An Effective Shuffled Frog-leaping Algorithm for Multi-objective Flexible Job Shop Scheduling Problems[J].Applied Mathematics and Computation,2012,218(18): 9353-9371. [47]Li Junqing,Pan Quanke.Chemical-reaction Optimization for Flexible Job-shop Scheduling Problems with Maintenance Activity[J]. Applied Soft Computing,2012,12:2896-2912. [48]Li Junqing,Pan Quanke.Chemical-reaction Optimization for Solving Fuzzy Job-shop Scheduling Problem with Flexible Maintenance Activities[J].Int. J. Production Economics, 2013,145:4-17. [49]Lu Hong.Stretching Technique-based Clonal Selection Algorithm for Flexible Job-shop Scheduling[C]//Proceedings of the 2009 International Conference on Computational Intelligence and Natural Computing.Wuhan,2009:111-114. [50]Wang Xiaojuan,Gao Liang,Zhang Chaoyong, et al.A Multi-objective Genetic Algorithm Based on Immune and Entropy Principle for Flexible Job-shop Scheduling Problem[J]. International Journal of Advanced Manufacturing Technology, 2010, 51(5/8): 757-767. [51]Zhang Jingmin,Zhang Youhua,Qin Peng.Immune Clonal Differential Evolution Algorithm for Multi-objective Flexible Job-shop Scheduling Problem[C]//Proceedings of the 2010 International Conference on Artificial Intelligence and Education (ICAIE 2010). Hangzhou, 2010:73-77. [52]赵韩,高先圣,姜康,等.基于免疫遗传算法的多目标柔性作业车间调度研究[J].系统仿真学报,2008, 20(22):6163-6168. Zhao Han,Gao Xiansheng,Jiang Kang,et al.Study of Multi-objective Flexible Job Shop Scheduling Based on Immune Genetic Algorithm[J]. Journal of System Simulation,2008, 20(22):6163-6168. [53]余建军,孙树栋,郝京辉.免疫算法求解多目标柔性作业车间调度研究[J].计算机集成制造系统,2006,12(10):1643-1650. Yu Jianjun,Sun Shudong,Hao Jinghui.Multi-objective Flexible Job-shop Scheduling Based on Immune Algorithm[J]. Computer Integrated Manufacturing Systems, 2006,12(10): 1643-1650. [54]Zadeh L A.Fuzzy Sets[J].Information and Control,1965, 8(3): 338-353. [55]Zhang Guohui,Shao Xinyu ,Li Peigen,et al. An Effective Hybrid Particle Swarm Optimization Algorithm for Multi-objective Flexible Job-shop Scheduling Problem[J].Computers & Industrial Engineering,2009,56:1309-1318. [56]Low C,Yip Y,Wu T H.Modelling and Heuristics of FMS Scheduling with Multiple Objectives[J].Computers & Operations Research,2006,33(3):674-694. [57]Li Junqing,Pan Quanke,Xie Shengxian,et al.A Hybrid Pareto-based Tabu Search for Multi-objective Flexible Job Shop Scheduling Problem with E/T Penalty[J].Advences in Swarm Intelligence, Proceedings:Lecture Notes in Computer Science, 2010,6145:620-627. [58]李俊青,潘全科,王玉亭.多目标柔性车间调度的Pareto混合禁忌搜索算法[J].计算机集成制造系统, 2010,16(7):1419-1426. Li Junqing,Pan Quanke,Wang Yuting. Hybrid Pareto-based Tabu Search Algorithm for Solving the Multi-objective Flexible Job Shop Scheduling Problem[J]. Computer Integrated Manufacturing Systems, 2010,16(7): 1419-1426. [59]Li Junqing,Pan Quanke,Liang YunChia.An Effective Hybrid Tabu Search Algorithm for Multi-objective Flexible Job-shop Scheduling Problems[J].Computers & Industrial Engineering, 2010, 59:647-662. [60]Gao K Z,Suganthan P N,Chua T J.Pareto-based Discrete Harmony Search Algorithm for Flexible Job Shop Scheduling[C]//2012 12th International Conference on Intelligence Systems Design and Applications(ISDA).Kochi,2012: 953-956. [61]Kirkpatrick S C,Gelatt C D Jr,Vecchi M P.Optimization by Simulated Annealing[J].Science,1983,220(4598):671-680. [62]Liu H B,Abraham A,Choi O,et al. Variable Neighborhood Particle Swarm Optimization for Multi-objective Flexible Jobshop Scheduling Problems[J]. Lect. Notes Comput. Sci., 2006,4247:197-204. [63]Ho N B,Tay J C.Solving Multiple-objective Flexible Job Shop Problems By Evolution and Local Search[J].IEEE Transations on Systems Man and Cybernetics Part C-Applications and Reviews,2008,38(5): 674-685. [64]Penev K, Littlefair G. Free Search-a Comparative Analysis[J]. Information Sciences,2005,172(1/2):173-193. |
[1] |
LUO Ji-Sai, XU De-Ge, SHI Mei-Li.
Gearbox Fault Diagnosis with Rotating Speed Fluctuation Based on SVD and Chirplet Path Pursuit Algorithm
[J]. J4, 201016, 21(16): 1947-1951.
|
[2] |
LI Yan-Yuan, WANG Xiao-Beng, SHU Li-Jun.
An Algorithm of Solving Highlight Line Based on Arc-length Parameters
[J]. J4, 201016, 21(16): 1981-1985.
|
[3] | WEI Shupeng, TANG Hongtao, LI Xixing, YANG Guanyu, ZHANG Jian. Dual-resource Constrained Flexible Machining Workshop Inverse Scheduling Problem [J]. China Mechanical Engineering, 2024, 35(03): 457-471. |
[4] | LIANG Yongbin, FU Guang, LIN Zhigui, HE Zhicheng, ZHANG Jialuo, CHEN Tao. Design of Lane Keeping Assist Systems Based on Improved Preview Control Model [J]. China Mechanical Engineering, 2024, 35(03): 548-558. |
[5] | SUN Yongguo, JIN Xin, XUE Dong, SHAN Jianping, SHI Xiaochun. Optimal Design of Slip Oil Pump Impeller Structures Based on NSGA-Ⅱ [J]. China Mechanical Engineering, 2024, 35(03): 559-569. |
[6] | WANG Hong, WU Lihui, CHEN Da, ZHANG Jie. Scheduling in SAT in Multi-operation Mode Based on Artificial Hummingbird Algorithm with Twin Population [J]. China Mechanical Engineering, 2024, 35(02): 260-267,279. |
[7] | CHEN Zhuofan, ZHOU Kun, QIN Feifei, WANG Binrui. Inverse Kinematics Solution of Robots Based on IQPSO Algorithm [J]. China Mechanical Engineering, 2024, 35(02): 293-304. |
[8] | SUN Yuxiang, CHEN Li, LONG Bo, WANG Yanping, LIU Shihua, JIA Kun. Intelligent Layout for Pipeline Supports of Nuclear Power Plant under Complex Load [J]. China Mechanical Engineering, 2024, 35(02): 317-323,336. |
[9] | CHEN Junxiang, KONG Xiangdong, XU Kelong, AI Chao, . Comprehensive Performance Optimization of High Pressure Threaded Plug-in Relief Valves [J]. China Mechanical Engineering, 2023, 34(24): 2909-2919,2926. |
[10] | CHEN Jian, XU Chang, XU Tingliang, . Centrifugal Pump Fault Diagnosis Methods Based on Dislocation Superposition Methods and Improved Probabilistic Neural Networks [J]. China Mechanical Engineering, 2023, 34(23): 2854-2861. |
[11] | WEI Guangyan, YE Chunming. Research on Distributed and Multi-flexible Assembly Job-shop Scheduling Problems [J]. China Mechanical Engineering, 2023, 34(20): 2442-2455. |
[12] | LI Guangbao, GAO Dong, LU Yong, PING Hao, ZHOU Yuanyuan. Adaptive Kalman Filtering and PSO-GA-BP Algorithm for Robot Error Compensation [J]. China Mechanical Engineering, 2023, 34(20): 2456-2465. |
[13] | XUE Kai, GUO Runlan, HUANG Huiyang, HUANG Hua. Structural Optimization Method of Additive Manufacturing Model Based on Point Cloud Data [J]. China Mechanical Engineering, 2023, 34(20): 2482-2488. |
[14] | XU Meijiao, XUE Shanliang, ZHANG Hui, ZHOU Guoqing, LU Honggen. Manufacturing Readiness Level Assessment Method of Complex Product Assembly Based on BP-AdaBoost Algorithm [J]. China Mechanical Engineering, 2023, 34(20): 2513-2519. |
[15] | PU Zhixin, GUO Jianwei, PAN Yuqi, BAI Yangxi. Performance Analysis and Optimization Design of 2PPaPaR Parallel Mechanism [J]. China Mechanical Engineering, 2023, 34(19): 2304-2312. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||