[1]Garey M R,Johnson D S,Sethi R. The Complexity of Flowshop and Jobshop Scheduling[J].Mathematics of Operations Research, 1976,1(2):117-129.
[2]Haldun A, Mark A L, Kenneth M, et al. Executing Production Schedules in the Face of Uncertainties: a Review and Some Future Directions[J].European Journal of Operational Research, 2005,161: 86-110.
[3]胡咏梅,贾磊,李歧强.一种基于动态粗集的工件滚动调度识别方法[J].机械工程学报,2005,41(3):67-71.
Hu Yongmei,Jia Lei, Li Qiqiang. Recognition Method of Job Rolling Scheduling Based on Dynamic Rough Sets[J].Chinese Journal of Mechanical Engineering, 2005,41(3):67-71.
[4]方剑,席裕庚.基于遗传算法的滚动调度策略[J].控制理论与应用,1997, 14(4):589-594.
Fang Jian,Xi Yugeng.The Genetic Algorithms-based Rolling Horizon Scheduling Strategy[J].Control Theory & Applications, 1997, 14(4): 589-594.
[5]金锋,吴澄.大规模生产调度问题的研究现状与展望[J].计算机集成制造系统,2006,12(2):161-168.
Jin Feng,Wu Cheng. Research Status and Prospects for Massive Production Scheduling[J].Computer Integrated Manufacturing Systems,2006,12(2):161-168.
[6]刘琳,谷寒雨,席裕庚.工件到达时间未知的动态车间滚动重调度[J].机械工程学报,2008,44(5):68-75.
Liu Lin,Gu Hanyu, Xi Yugeng.Rescheduling Algorithm Based on Rolling Horizon Decomposition for a Dynamic Job Shop with Uncertain Arriving Time[J].Chinese Journal of Mechanical Engineering,2008,44(5):68-75.
[7]孙志峻,朱剑英,潘全科,等.基于遗传算法的多资源作业车间智能动态优化调度[J].机械工程学报,2002,38(4): 120-125.
Sun Zhijun,Zhu Jianying,Pan Quanke,et al.Genetic Algorithm Based Approach to the Intelligent Optimum Scheduling of Multi-resources in the Dynamic Environment[J].Chinese Journal of Mechanical Engineering, 2002,38(4): 120-125.
[8]于晓义,孙树栋,王彦革.面向随机加工时间的车间作业调度[J].中国机械工程,2008,19(19):2319-2324.
Yu Xiaoyi,Sun Shudong,Wang Yange.Research on Stochastic Processing Time Oriented Job-shop Scheduling[J].China Mechanical Engineering, 2008,19(19):2319-2324.
[9]徐震浩,顾幸生.不确定条件下的中间存储时间有限的Flow Shop提前/拖期调度问题[J].控制理论与应用,2006,23(3): 480-486.
Xu Zhenhao,Gu Xingsheng.Earliness and Tardiness Flow Shop Scheduling Problems under Uncertainty with Finite Intermediate Storage[J].Control Theory & Applications, 2006,23(3): 480-486.
[10]徐震浩,顾幸生.不确定条件下的Flow Shop问题的免疫调度算法[J].系统工程学报,2005,20(4):374-380.
Xu Zhenhao,Gu Xingsheng. Immune Scheduling Algorithm for Flow Shop Problems under Uncertainty[J].Journal of Systems Engineering, 2005,20(4):374-380.
[11]王清印.灰色数学基础[M].武汉:华中理工大学出版社,1996.
[12]Guilherme E V, Jeffrey W H, Edward L. Rescheduling Manufacturing Systems: a Framework of Strategies, Policies and Methods[J].Journal of Scheduling,2003,6(1):39-62.
[13]Andra′s P, Botond K, La′szlo′ M. Stability-oriented Evaluation of Rescheduling Strategies, by Using Simulation[J]. Computers in Industry, 2007,58: 630-643.
[14]Guilherme E V,Jeffrey W.Herrmann, Edward L. Predicting the Performance of Rescheduling Strategies for Parallel Machine Systems[J].Journal of Manufacturing Systems,2000,19(4):256-266.
[15]Deb K,Pratap A,Agarwal S,et al. A Fast and Elitist Multi-objective Genetic Algorithms: NSGA-Ⅱ[J].IEEE Transactions on Evolutionary Computation.2002,6(2):182-197.
[16]刘敏,曾文华,赵建峰.一种快速的双目标非支配排序算法[J].模式识别与人工智能,2011,24(4):538-547.
Liu Min, Zeng Wenhua, Zhao Jianfeng.A Fast Bi-objective Non-dominated Sorting Algorithm[J].Pattern Recognition and Artificial Intelligence, 2011, 24(4):538-547.
[17]郑金华.多目标进化算法及其应用[M].北京:科学出版社,2007.
[18]郑金华,李珂,李密青,等.一种基于Hypervolume指标的自适应邻域多目标进化算法[J].计算机研究与发展,2012,49(2): 312-326.
Zheng Jinhua,Li Ke,Li Miqing,et al.Adaptive Neighbor Multi-objective Evolutionary Algorithm Based on Hypervolume Indicator[J]. Journal of Computer Research and Development, 2012,49(2): 312-326.
[19]朱传军,张超勇,管在林,等.一种求解Job-shop调度问题的遗传局部搜索算法[J].中国机械工程,2008,19(14):1707-1711.
Zhu Chuanjun,Zhang Chaoyong,Guan Zailin,et al. A Genetic Local Search Algorithm for Solving Job-shop Scheduling Problems[J].China Mechanical Engineering,2008,19(14):1707 -1711. |