Three Dimensional Mapping Work Decomposition Model for Complex Product Development Project
Dai Yulei1,2;Li Nan1;Yang Li3
1.Nanjing University of Aeronautics and Astronautics,Nanjing,210016
2.Beijing Institute of Nearspace Vehicle's Systems Engineering,Beijing,100076
3.Nanjing University of Traditional Chinese Medicine,Nanjing,210029
Dai Yulei1,2;Li Nan1;Yang Li3. Three Dimensional Mapping Work Decomposition Model for Complex Product Development Project[J]. China Mechanical Engineering, 2013, 24(19): 2629-2634.
[1]Mansuy J. Work Breakdown Structure.. A Simple Tool for Complex Jobs[J]. Cost Engineering, 1991, 3(12) :15-18.
[2]Rad P F. Advocating a Deliverable-oriented Work Breakdown Structure[J]. Cost Engineering, 1999,41 (12) :35-39.
[3]Grove C, Hallowell W,Smith C A. Parallel WBS for International Projects [J]. PM Network, 1999 ( 3 ) 37-42.
[4]Haugan Gregory T. Effective Work Breakdown Structures[ M]. New York: Management Concepts Inc. , 2002.
[5]Indelicato Greg. Work Structures for Projects, Pro- grams and Enterprises [J]. Project Management Journal, 2009,40(1):136.
[6]皮亚风[1].航天型号研制工作分解结构(WBS)编制研究[J].华北航天工业学院学报,2006,16(3):1-3.
[7]金鑫[1].航天型号项目工作结构分解模型及应用方法研究[J].航天工业管理,2007(12):33-36.
[8]何恒[1],邓家袄[1].支持复杂产品研发的WBS[J].航空制造技术,2009(12):74-78.
[9]何苗[1],杨海成[1,2],敬石开[1].基于产品分解结构的复杂产品工作分解技术研究[J].中国机械工程,2011,22(16):1960-1964.
[10]美国项目管理协会.项目管理知识体系指南[M].4版.王勇,张斌,译.北京:电子工业出版社,2009.
[11]美国项目管理协会.工作分解结构实施标准[M].强茂山,陈平,译.2版.北京:电子工业出版社,2008.
[12]李福昌.运载火箭工程[M].北京:中国宇航出版社,2002-10..
[13]国防科学技术工业委员会.QJ3121-2000航天产品项目工作分解结构[S].北京:中国航天标准化研究所,2000.
[14]戚安邦.项目管理学[M].北京:科学出版社,2007. 5
[15]国防科学技术工业委员会.QJ3133-2001航天产品项目阶段划分和策划[S].北京:中国航天标准化研究所,2001.
[16]吴宗宁[1],王松江[1].工程项目管理中工作分解结构一责任一资源模型的研究[J].项目管理技术,2008(6):68-71.