CHEN Bing, LIU Kai, YANG Ting. Non-cooperative Game for Manufacturing Resources Configuration Driven by Job Load Competition[J]. China Mechanical Engineering, 2013, 24(02): 233-239.
[1]王炳刚[1],饶运清[1],邵新宇[1],徐迟[1].基于多目标遗传算法的混流加工/装配系统排序问题研究[J].中国机械工程,2009(12):1434-1438. 0
[2]郑永前[1],王阳[1].基于遗传算法的加工工艺决策与排序优化[J].中国机械工程,2012,23(1):59-65.
[3]MaG H,ZhangY F,NeeA YC. ASimulated Annealing-based Optimization Algorithm for Process Planning[J].International Journal of Production Research,2000,(02):2671-2687.
[4]潘全科 [1],朱剑英 [2].多工艺路线多资源多目标的作业调度优化[J].中国机械工程,2005,16(20):1821-1826. 4
[5]Wong T N,Leung C W,Mak K L. Dynamic Shop Floor Scheduling in Multi-agent Manufacturing Systems[J].Expert Systems with Applications,2006,(03):486-494.
[6]Li W D. A Simulated Annealing-based Optimization Approach for Integrated Process Planning and Scheduling[J].International Journal of Computer Integrated Manufacturing,2007,(01):80-95.doi:10.1080/09511920600667366.
[7]侯定丕.博弈论导论[M]合肥:中国科学技术大学出版社,2004.
[8]郑丞[1],金隼[1],来新民[1],李余兵[1].基于非合作博弈的公差分配优化[J].机械工程学报,2009,45(10):159-165. 5
[9]范周田.模糊矩阵理论与应用[M]北京:科学出版社,2006.
[10]张弢,纪德云.模糊聚类分析法[J].沈阳大学学报,2000,12(2):73-79. 1
[11]隗立涛[1],修乃华[1].基于启发搜索算法的纳什均衡计算[J].北京交通大学学报:自然科学版,2007,31(3):58-62.