[1]Nabil M. Dependence of Lead Time on Batch Size Studied by a System Dynamics Model[J].International Journal of Production Research,2010,(18):5523-5532.
[2]郝刚[1],吴功宜[1].根据日产量动态调整批量和提前期的物料需求计划研究[J].计算机集成制造系统,2005,11(9):1267-1271.
[3]陈淮莉[1],张洁[1],马登哲[1].一种新型供应链物料需求计划模型[J].上海交通大学学报,2005,39(1):98-100.
[4]Zijm W H M,Buitenhek R. Capacity Planning and Lead Time Management[J].International Journal of Production Economics,1996,(01):165-179.
[5]Koo P H,Lee W S,Kim Y. Production Batch Sizing at Multi-product Bottleneck Machines[A].Troyes,France,2009.814-818.
[6]Matuszek J,Mleczko J. Production Control in Moving Bottlenecks in Conditions of Unit and Smallbatch Production[J].Bulletin of the Polish Academy of Sciences:Technical Sciences,2009,(03):229-239.
[7]Kooa P H,Bulfinb R,Koh S G. Determination of Batch Size at a Bottleneck Machine in Manufacturing Systems[J].International Journal of Production Research,2007,(05):1215-1231.
[8]Li Lin,Chang Qing,Ni Jun. Data Driven Bottleneck Detection of Manufacturing Systems[J].International Journal of Production Research,2009,(18):5019-5036.
[9]Li Lin,Chang Qing,Ni Jun. Bottleneck Detection of Manufacturing Systems Using Data Driven Method[A].Michigan,USA,2007.22-25.
[10]施文武[1],严洪森[1].知识化制造系统中生产瓶颈的分析方法[J].计算机集成制造系统,2006,12(2):271-279. 0
[11]Faget P,Eriksson U,Herrmana F. Appling Discrete Event Simulation and an Automated Bottleneck Analysis as an Aid to Detect Running Production Constraints[A].Orlando(USA),2005.1401-1407.
[12]Pegels C C,Watrous C. Application of the Theory of Const-raints to a Bottleneck Operation in a Manufacturing Plant[J].Journal of Manufacturing Technology Management,2005,(03):302-311.
[13]Acero-Dominquez M J,Paternina-arboleda C D. Scheduling Jobs on a K-stage Flexible Flow Shop Using a TOC-based (bottleneck) Procedure[A].Charlottesville,VA,Canada,2004.295-298.
[14]Moss H K,Yu W B. Toward the Estimation of Bottleneck Shiftiness in a Manufacturing Operation[J].Production and Inventory Management Journal,1999,(02):53-58.
[15]Liu Mingzhou,Tang Juan,Ge Maogen. Research on Method of Dynamic Prediction about Production Logistics Bottleneck Based on Bottleneck Index[J].Chinese Journal of Mechanical Engineering,2009,(05):710-716.
[16]程文鑫 [1],龚沈光 [1],秦东兴 [2].基于BP网络的正态分布设备事件抽样研究[J].舰船科学技术,2004,26(6):73-76.
[17]华兴.排队论与随机服务系统[M]上海:上海翻译出版公司,1987. |