[1]Manfred S, Hermann B. General Aspects of Config- uration Management (CM)[J]. International Jour- nal of Project Management, 1997,15 (5) : 331-332.
[2]Burgess T F,Byrne K,Kidd C. Making Project Sta- tus Visible in Complex Aerospace[J]. International Journal of Project Management, 2003,21(3) : 251- 259.
[3]British Standards Institution. ISO10007- 2003 Quality Management System-guidelines for Con- figuration Management[S]. London,2003.
[4]顾巧祥[1],纪杨建[1],祁国宁[1],苏少辉[1],鲁玉军[1].基于ECA规则和事物特性表的产品配置模型[J].浙江大学学报:工学版,2006,40(5):753-758.
[5]鲁玉军[1,2],纪杨建[1],祁国宁[1],唐任仲[1].基于延迟设计分离点的订单设计型产品配置设计[J].浙江大学学报:工学版,2009,43(12):2231-2236.
[6]裘乐淼[1],张树有[1],徐春伟[2],李中凯[1].递归化产品配置设计技术研究[J].计算机集成制造系统,2008,14(6):1049-1056.
[7]车君华[1],谭建荣[1],冯毅雄[1],邵雷[1].产品配置设计的多层次映射求解模型研究[J].中国机械工程,2006,17(8):849-853.
[8]Alexander F,Geehard F,Diet M J. Conceptual Mod- eling for Configuration of Mass- customizable Products[J]. Artificial Intelligence in Engineering, 2001,15 (2) :165-176.
[9]冯培恩,陈泳,张帅,潘双夏.基于产品基因的概念设计[J].机械工程学报,2002,38(10):1-6.
[10]纪杨建[1],祁国宁[1],顾巧祥[1].机械产品配置知识自适应方法研究[J].浙江大学学报:工学版,2006,40(4):560-566.
[11]王国胤.ROUGH集理论与知识获取[M],2001.
[12]张文修,仇国芳著.基于粗糙集的不确定决策[M],2005:275.
[13]蒋明哲.粗集多属性决策理论与方法[M].西安:西安交通大学出版社,2007.
[14]中华人民共和国铁道部.TB/T2235-2002铁路车辆滚动轴承技术条件[S].北京:中国铁道出版社,2002. |