[1]Lauff V, Werner F. Scheduling with Common Due Date,Earliness and Tardiness Penalties for Multimachine Problems: A Survey[J]. Mathematical and Computer Modelling, 2004,40(5/6) : 637-655.
[2]Sen T,Sulek J M,Dileepan P. Static Scheduling Re search to Minimize Weighted and Unweighted Tar diness: A State- of- the- art Survey[J]. Int. J. Production Economics,2003,83(1) : 1-12.
[3]Essafi I, Mati Y, Stephane D P. A Genetic Local Search Algorithm for Minimizing Total Weighted Tardiness in the Job-shop Scheduling Problem [J]. Computers & Operations Research, 2008, 35 (8): 2599-2616.
[4]Thiagarajan S, Rajendran C. Scheduling in Dynamic Assembly Job-shops to Minimize the Sum of Weighted Earliness, Weighted Tardiness and Weighted Flowtime of Jobs[J]. Computers & Industrial Engineering, 2005,49 (4): 463-503.
[5]姚伟力,杨德礼.Job—shop提前/拖期调度问题的研究[J].控制与决策,2000,15(3):322-324.
[6]Sadeh N. Micro-boss : A Micro- opportunistic Factory Scheduler [J]. Expert Systems with Applications,1993,6(3) :377-392.
[7]刘兴初,赵千川.用GA算法解不同交货期窗口下的E/T调度问题[J].清华大学学报:自然科学版,2000,40(7):59-62.
[8]黄德才[1],朱艺华[2],王万良[1].带公共交货期窗口的提前/拖期非等同多机调度问题[J].系统工程理论与实践,2001,21(4):64-69.
[9]王凌.车间调度及其遗传算法[M],2003.
[10]张超勇[1],饶运清[1],刘向军[1],李培根[1].基于POX交叉的遗传算法求解Job—Shop调度问题[J].中国机械工程,2004,15(23):2149-2153.
[11]Baker K R. Introduction to Sequencing and Scheduling[M]. New York : Wisely, 1974.
[12]Beck J C,Refalo P. A Hybrid Approach to Scheduling with Earliness and Tardiness Costs[J]. Annals of Operations Research,2003,118(1/4) :49-71.
[13]Taillard E. Benchmarks for Basic Scheduling Problems[J]. European Journal of Operational Research, 1993,64(2):278-285. |