China Mechanical Engineering ›› 2011, Vol. 22 ›› Issue (8): 1001-1007.
Online:
2011-04-25
Published:
2011-05-04
Supported by:
基金资助:
CLC Number:
GAO Liang, LI Xin-Yu.
高亮, 李新宇.
[1]田颖[1,2],江平宇[1,2],周光辉[1,2],赵刚[1,2].基于遗传算法的工艺规划与调度集成方法[J].西安交通大学学报,2006,40(9):1041-1044. [2]张志英,唐承统,张建民,王新永,孙连胜.遗传算法在柔性CAPP与生产调度集成中的应用[J].计算机集成制造系统,2002,8(8):621-624. [3]杨洪柏,彭召旺.面向非线性工艺计划的动态多任务调度[J].上海交通大学学报,2000,34(3):400-403. [4]吴德中,严隽琪.CAPP与PPC的并行分布式集成研究[J].上海交通大学学报,1996,30(12):1-6. [5]Sanjay Kumar Shukla,M. K. Tiwari,Young Jun Son.Bidding-based multi-agent system for integrated process planning and scheduling: a data-mining and hybrid tabu-SA algorithm-oriented approach[J]. The International Journal of Advanced Manufacturing Technology . 2008 (1-2) [6]W. J. Zhang,S. Q. Xie.Agent technology for collaborative process planning: a review[J]. The International Journal of Advanced Manufacturing Technology . 2007 (3-4) [7]Manish Kumar,Sunil Rajotia.Integration of process planning and scheduling in a job shop environment[J]. The International Journal of Advanced Manufacturing Technology . 2006 (1-2) [8]Wei Tan,Behrokh Khoshnevis.A linearized polynomial mixed integer programming model for the integration of process planning and scheduling[J]. Journal of Intelligent Manufacturing . 2004 (5) [9]Lihui Wang,Weiming Shen.DPP: An agent-based approach for distributed process planning[J]. Journal of Intelligent Manufacturing . 2003 (5) [10]H. Lee,S.-S. Kim.Integration of Process Planning and Scheduling Using Simulation Based Genetic Algorithms[J]. International Journal of Advanced Manufacturing Technology . 2001 (8) [11]George Chryssolouris,Velusamy Subramaniam.Dynamic scheduling of manufacturing job shops using genetic algorithms[J]. Journal of Intelligent Manufacturing . 2001 (3) [12]Wei Tan,Behrokh Khoshnevis.Integration of process planning and scheduling— a review[J]. Journal of Intelligent Manufacturing . 2000 (1) [13]Alexander Weintraub,Denis Cormier,Thom Hodgson,Russell King,James WIlson,Andrew Zozom.Scheduling with alternatives: a link between process planning and scheduling[J]. IIE Transactions . 1999 (11) [14]C. Saygin,S. E. Kilic.Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems[J]. International Journal of Advanced Manufacturing Technology . 1999 (4) [15]Moreno M D R,Oddi A,Borrajo D,et al.IPSS:aHybrid Approachto Planning and Scheduling Inte-gration. IEEE Transactions on Knowledge andData Engineering . 2006 [16]Bang C W.Hybrid Integration Approach for ProcessPlanning and Shop Floor Scheduling in Agile Manu-facturing. . 2002 [17]Usher J M,Fernandes K J.Dynamic Process Plan-ning-the Static Phase. Journal of Materials Pro-cessing Technology . 1996 [18]Chryssolouris G,Chan S,Cobb W.Decision Makingon the Factory Floor:an Integrated Approach toProcess Planning and Scheduling. Robotics&Computer-integrated Manufacturing . 1984 [19]Khoshnevis B,Chen Q M.Integration of ProcessPlanning and Scheduling Function. IIE Inte-grated Systems Conference&Society for Integrat-ed Manufacturing Conference Proceedings . 1989 [20]Wang Z B,Chen Y L,Wang N S.Research on Dy-namic Process Planning System Considering Deci-sion about Machines. Proceeding of the 5thWorld Congress on Intelligent Control and Auto-mation . 2004 [21]Zhang Y,Saravanan A,Fuh J.Integration ofProcess Planning and Scheduling by Exploring theFlexibility of Process Planning. InternationalJournal of Production Research . 2003 [22]Li W D,Mc Mahon C.A Si mulated Annealing-based Opti mization Approach for IntegratedProcess Planning and Scheduling. InternationalJournal of Computer Integrated Manufacturing . 2007 [23]Nof S Y,Grant F H.Adaptive Predictive Schedu-ling Reviewand a General Framework. Produc-tion Plan&Control . 1991 [24]Donovan O R,Uzsoy R.Predictable Scheduling of aSingle Machine with Breakdowns and Sensitive.1006.Jobs. International Journal of Production Re-search . 1999 [25]NORHASHIMAH MORAD,AMS ZALZALA.Genetic algorithms in integrated process planning and scheduling[J]. Journal of Intelligent Manufacturing . 1999 (2) [26]Gareth J. Palmer.A simulated annealing approach to integrated production scheduling[J]. Journal of Intelligent Manufacturing . 1996 (3) [27]P. Prabhu,H. P. Wang.Algorithms for computer-aided generative process planning[J]. The International Journal of Advanced Manufacturing Technology . 1991 (1) [28]Moon I,Lee S,Bae H.Genetic Algorithms for JobShop Scheduling Problems with Alternative Rout-ings. International Journal of Production Re-search . 2008 [29]Wong T,Leung C,Mak K,et al.Dynamic Shop-floor Scheduling in Multi-agent ManufacturingSystem. Expert Systems With Applications . 2006 [30]Sormaz D N,Arumugam J,Rajaraman S.Integra-tive Process Plan Model and Representationfor In-telligent Distributed Manufacturing Planning. International Journal of Production Research . 2004 [31]Chen YJ.AnIntegrated Process Planning and Pro-duction Scheduling Framework for Mass Customi-zation. . 2003 [32]Mishra N,Choudhary A K,Ti wari M K.Modelingthe Planning and Scheduling Across the Outsourc-ing Supply Chain:a Chaos-based Fast Tabu-SAApproach. International Journal of ProductionResearch . 2008 [33]Gindy N N,Saad S M,Yue Y.Manufacturing responsiveness through integrated process planning and scheduling. International Journal of Production Research . 1999 [34]Yeo Keun Kim,Kitae Park,Jesuk Ko.A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research . 2003 [35]Suresh V,Chandhuri D.Dynamic scheduling: a survey of research. International Journal of Production Economics . 1993 [36]Kis Tamas.Job-shop scheduling with processing alternatives. European Journal of Operational Research . 2003 [37]Kuhnle H,Braun H J,Buhring J.Integration of CAPP and PPC Interfusion Manufacturing Management. Integrated Manufacturing Systems . 1994 [38]An Integrated Approach to Process Planning and Shcteduling,G.Chr yssolouris,S. . 1985 [39]Beckendorff U,Kreutzfeldt J,Ullmann W.Reactive Workshop Scheduling based on Alternative Routings. Proceedings of a Conference on Factory Automation and Information Management . 1991 [40]DavudMattox.IPPM—APrototypetoIntegrateProcessPlanningandJobShopSchedulingFunctions. AnnalsoftheCIRP . 1993 [41]Wang L H,Shen W M.Process Planning and Scheduling for Distributed Manufacturing. . 2007 [42]Jackson J R.Simulation research on job shop production. Naval Research Logistics Quarterly . 1957 [43]Ramash R.Dynamic Job Shop Scheduling-A Review of Simulation Research. OMEGA International Journal of Manage Science . 1990 [44]SZELDE E K,ROGER M.Knowledge-based reactive scheduling. Production Plan & Control . 1994 [45]MOON C,SEO Y.Evolutionary algorithm for advanced process planning and scheduling in a multi-plant. Computers and Industrial Engineering . 2005 [46]F.T.S., Chan,SH Chung,PLY Chan.An adaptive genetic algorithm with dominated genes for distributed scheduling problems. Expert Systems With Applications . 2005 [47]Shao X Y,Li X Y,Gao L,Zhang C Y.Integration of Process Planning and Scheduling-A Modified Genetic Algorithm-based Approach. Computers and Operations Research . 2009 [48]F. T. S.,Chan, J.,Zhang, LIP.Modelling of integrated, distributed and cooperative process planning system using an Agent-based approach. Proceedings of the Institution of Mechanical Engineers (IMECHE) Part B: Journal of Engineering Manufacture . 2001 [49]YW Guo,WD Li,AR Mileham,GW Owen.Applications of particle swarm optimisation in integrated process planning and scheduling. Robot Comput-Integr Manuf . 2009 [50]R.Kumar,,M.Tiwari,,R.Shankar."Scheduling of flexible manufacturing systems:an ant colony optimization approach,". Proceedings of the Institution of Mechanical Engineers,Part B:Journal of Engineering Manufacture . 2003 |
[1] |
CAO Jun, YIN Chao, LIU Fei, LI Jin-Cai, YIN Qing.
Research and Application on Dynamic Statistical Process Control of Key Process in Multi-varieties and Small-batch Machining Workshop
[J]. China Mechanical Engineering, 2011, 22(23): 2822-2827.
|
[2] |
JING Yi-1, WANG,XU 1, LI Wen-Chuan-2.
Task Allocation Optimization for Supplier Involvement in Cooperative Product Development
[J]. China Mechanical Engineering, 2011, 22(21): 2566-2571.
|
[3] |
GAO Zhan-De, TANG Cheng-Tong, GU Mei-Hui.
Integrated Framework for Tube Digital Manufacturing
[J]. China Mechanical Engineering, 2011, 22(18): 2191-2194.
|
[4] |
WANG Yi-1, 2, WANG Zong-Zhong-2, CHEN Qiang-Xin-2, MAO Ning-2.
Study on Service Scheduling in Mould Manufacturing Grid Based on Genetic Algorithm
[J]. China Mechanical Engineering, 2011, 22(11): 1307-1311,1317.
|
[5] |
ZHANG Sha-Qing, CHEN Xin-Du, CHEN Qiang-Xin, CHEN Xin.
Reactive Scheduling for Multiple Mould and Die Projects Based on Improved Multi-objective Particle Swarm Optimization
[J]. China Mechanical Engineering, 2011, 22(10): 1173-1179.
|
[6] |
DAI Da-Meng.
Factory Planning and Workshop Layout Based on Interactive Virtual Environment
[J]. China Mechanical Engineering, 2011, 22(10): 1180-1184.
|
[7] |
WANG Lei, TANG Dui-Bing, YUAN Wei-Dong.
Research on Pheromone-based Coordination Mechanism and Task Allocation
[J]. China Mechanical Engineering, 2011, 22(3): 310-313,359.
|
[8] |
CHENG Fang-Qi, XIE Fei-Fan.
Optimization Construction of Collaborative Manufacturing Chain Based on Distance Model of Manufacturing Task Parameters
[J]. China Mechanical Engineering, 2011, 22(2): 184-189.
|
[9] |
LI Su-Ke, LIU Cheng-Jiang, YU Dao-Yuan, ZHANG San-Jiang, SHI De-Song, HE Shi-Lin.
Order Allocation and Sequencing Research on Complete Vehicle Mixed-model Assembly
Line
[J]. China Mechanical Engineering, 2010, 21(20): 2459-2462.
|
[10] |
ZHANG Wei, BO Xiao-Hong, TIAN Jing-Gong, CHU Yong, ZHANG Yong.
Manufacture Task Allocation Service Based on Grey Theory
[J]. China Mechanical Engineering, 2010, 21(14): 1694-1697,1703.
|
[11] |
WANG Yun, TAN Jian-Rong, FENG Yi-Xiong, LI Zhong-Kai.
Multi-objective Flexible Job-shop Scheduling Based on Strength Pareto Evolutionary Algorithm
[J]. China Mechanical Engineering, 2010, 21(10): 1167-1172.
|
[12] |
YAN Ping, WANG Dong-Jiang, CHEN Guo-Rong, LIU Fei, DIAO Jing.
A Production Schedule Obtaining Method Based on Information Spreading Relationship Network in Manufacturing Process
[J]. China Mechanical Engineering, 2010, 21(9): 1046-1052.
|
[13] |
HUI Zi-Hui, SHAN Run-Hua.
Research on Multi-Contradictions Problem Solving in Product Design
[J]. China Mechanical Engineering, 2010, 21(03): 263-267.
|
[14] |
HUANG Ban, GAO Cheng-Hui, CHEN Liang.
Multi-objective Optimization for Partner Selection in a Virtual Enterprise under Fuzzy Environment
[J]. J4, 2009, 20(23): 2865-2870.
|
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||