[1]上官春霞[1],周泓[1],师瑞峰[2],吴旸[1].作业车间排序重调度问题及其改进修复约束满足算法[J].计算机集成制造系统,2008,14(9):1742-1751.
[2]杨宏安[1],孙树栋[1],司书宾[1],梁辰[2].基于动态一致性增强技术的Job Shop调度算法研究[J].西北工业大学学报,2007,25(4):523-527.
[3]郭冬芬[1],李铁克[1].基于约束满足的车间调度算法综述[J].计算机集成制造系统,2007,13(1):117-125.
[4]陈恩红,薛瀚宏.基于约束满足的Job—Shop调度问题求解方法研究[J].软件学报,1998,9(12):946-948.
[5]段透明,陈进.基于约束分析的Job Shop调度算法的综述[J].重庆大学学报:自然科学版,1998,21(1):133-138.
[6]Smith S F,Peng Si Ow,Jean-Yves Porvin.OPIS:an Opportunistic Factory Scheduling System. Proceedings of the3rd International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems . 1990
[7]Sadeh N,Fox M S.Variable and Value Ordering Heuristics for the Job Shop Scheduling Constraint Satisfaction Problem. Artificial Intelligence . 1996
[8]Barták R,Skalicky T.A Local Approach to Auto-mated Correction of Violated Precedence and Re-source Constraints in Manually Altered Schedules. Proceedins of MISTA2009:Fourth Multidis-ciplinary International Scheduling Conference:The-ory and Applications . 2009
[9]Barták R.Constraint Satisfaction Techniques in Planning and Scheduling:An Introduction. Archives of Control Sciences . 2008
[10]Dechter R,,Meiri I.Experimental Evaluation of Preprocessing Techniques in Constraint Satisfac-tion Problems. Proceedings of the Eleventh International Joint Conference on Artificial Intelli-gence . 1989
[11]M Fox.Constraint-directed search: A case study of job shop scheduling. . 1983
[12]Fox MS,Smith SF.ISIS: a knowledge-based system for factory scheduling. Expert Systems . 1984
[13]Peng S O,Morton T E.The single machine early/tardy problem. Management Science . 1989
[14]SADEH N,SYCARA K,XIONG Y.Backtracking tech-niques for the Job Shop scheduling constraint satisfactionproblem. Artificial Intelligence . 1995