[1] |
LI Yi, TANG Qian, LIULianchao, PENG Xiaogang, YAN Xianhong.
An Improved ACO Algorithm for Automobile Mixed-flow Assembly Scheduling Problems#br#
[J]. China Mechanical Engineering, 2021, 32(09): 1126-1133.
|
[2] |
GENG Kaifeng1,2;YE Chunming1;WU Shaoxing2;LIU Li2.
Multi-objective Green Re-entrant Hybrid Flow Shop Scheduling under Time-of-use Electricity Tariffs
[J]. China Mechanical Engineering, 2020, 31(12): 1469-1480.
|
[3] |
YAO Yuanyuan;YE Chunming.
IMSSA for TFT-LCD Panel Array Process Scheduling Problem Considering Energy Saving
[J]. China Mechanical Engineering, 2019, 30(24): 2994-3003.
|
[4] |
MENG Leilei, ZHANG Chaoyong, REN Caile, LI Zhenguo, REN Yaping.
MILP Models and an Improved BSA for Hybrid Flow Shop Scheduling Problems with Blocking
[J]. China Mechanical Engineering, 2018, 29(22): 2647-2658.
|
[5] |
ZHONG Lingchong, QIAN Bin, HU Rong, WANG Ling.
HCS Algorithm for Multi-objective Flow Shop Scheduling Problems with Energy Consumption
[J]. China Mechanical Engineering, 2018, 29(22): 2674-2681.
|
[6] |
PEI Xiaobing;ZHAO Heng.
Permutation Flow Shop Scheduling Problem Based on Hybrid Binary Distribution Estimation Algorithm
[J]. China Mechanical Engineering, 2017, 28(22): 2752-2759.
|
[7] |
LU Jiansha, HU Qinghui, DONG Qiaoying, TANG Hongtao.
Cloud Manufacturing-oriented Mixed-model Hybrid Shop-Scheduling Problem
[J]. China Mechanical Engineering, 2017, 28(02): 191-198,205.
|
[8] |
Chen Kejia, Zhou Xiaomin.
Improved Food Chain Algorithm for Multi-objective Permutation Flow Shop Scheduling
[J]. China Mechanical Engineering, 2015, 26(3): 348-353,360.
|
[9] |
Wang Xianhong, Shi Guoquan.
Applications of a New Logic Intelligent Inference Method in Scheduling Optimization of Mixed Production Lines
[J]. China Mechanical Engineering, 2015, 26(10): 1320-1323.
|
[10] |
Tang Hongtao, Ding Binchu, Li Xiulin, Lu Jiansha.
Improved Immune Genetic Algorithm for Mixed-model Scheduling Problem
[J]. China Mechanical Engineering, 2014, 25(9): 1189-1194,1201.
|
[11] |
Zhao Yanwei, Zhang Liping, Zhang Jingling, Wang Wanliang, Wang Haiyan.
Modeling and Optimization of Process-assembly-type Flow-shop Scheduling Problem with Energy Saving
[J]. China Mechanical Engineering, 2014, 25(16): 2196-2203.
|
[12] |
Chen Yong, Wu Yunxiang, Wang Yaliang, Lu Jiansha.
Multi-assembly Line Robust Scheduling of Double Resource Constrains under Uncertain Orders
[J]. China Mechanical Engineering, 2014, 25(12): 1567-1573.
|
[13] |
ZHANG Ji-Liang-1, 2, CHEN Yong-Sheng-1.
Train Scheduling Problem Model and Its Solution Based on Hybrid Particle Swarm Optimization Algorithm
[J]. China Mechanical Engineering, 2013, 24(14): 1916-1922.
|
[14] |
LI Xiu-Lin, LU Jian-Sha, CHAI Guo-Zhong, SHANG Hong-Chao, JIANG Ling-Ling.
#br#
Hybrid Genetic Algorithm for Mixed-model Hybrid-shop Scheduling Problem
[J]. China Mechanical Engineering, 2012, 23(8): 935-940.
|
[15] |
HE Xiao-Hui, YAN Ping, LIU Fei, HU Shao-Hua, CHEN Guo-Rong.
Workpiece Online Identification Method Based on SVM and Power Information
[J]. China Mechanical Engineering, 2011, 22(7): 818-824.
|