[1]Wei Z, Tan J R, Feng Y X. Study on the BOM Transform Technology and Application in Injection Molding Machine[C]//Proceedings of the 2nd IEEE/ASME International Conference. New York : ASME, 2006 : 1-5.
[2]Olsen K A,Setre P,Thorstenson A. A Procedure-oriented Generic Bill of Materials[J]. Computer and Industrial Engineering, 1997,32 (1): 29-45.
[3]Wongvasu N,Pittner S,Kamarthi S V. Tire Rrep Resentation for Expressing the Compatibility Between Items in a Logical Bill of Material Structure [C]// Proceedings of SPIE 2001. Berlin: SPIE, 2001 :84-90.
[4]Du J,Jiao Y Y,Jiao J X. Integrated BOM and Routing Generator for Variety Synchronization in Assembly- to- Order Production[J]. Journal of Manufacturing Technology Management, 2005, 2 (16):233-243.
[5]邓琳[1],昝昕武[1],刘伟[2],黄茂林[1].基于单层BOM的产品BOM管理方法[J].重庆大学学报:自然科学版,2002,25(6):5-7.
[6]于晓[1],仲梁维[1],付良健[1],方毅钦[1].基于产品的BOM自动生成方法[J].精密制造与自动化,2006(3):55-57.
[7]郑巍[1],曹晶[1],马海晶[1].BOM表构造方法研究[J].中山大学学报论丛,2006,26(1):147-152.
[8]李爱平[1],冯锋[1],徐立云[1].一种产品BOM展开及生成改进循环算法的实现[J].机电一体化,2007,13(5):30-34.
[9]Geneste L,Ruet M. Fuzzy Case based on Configuration[C]//Proceedings of ECAI 2002 Configuration Workshop. Bordeaux: ECAI, 2002: 71-76.
[10]朱斌[1],王展[1],杨海成[1].基于顾客不确定需求的产品配置方法[J].航空制造技术,2008(5):73-75.
|