[1] |
WEI Shupeng, TANG Hongtao, LI Xixing, YANG Guanyu, ZHANG Jian.
Dual-resource Constrained Flexible Machining Workshop Inverse Scheduling Problem
[J]. China Mechanical Engineering, 2024, 35(03): 457-471.
|
[2] |
WEI Guangyan, YE Chunming.
Research on Distributed and Multi-flexible Assembly Job-shop Scheduling Problems
[J]. China Mechanical Engineering, 2023, 34(20): 2442-2455.
|
[3] |
MA Yupu, WEI Tao, WANG Li, ZHAO Junyi, ZHANG Xinlei, CHEN Ni, LI Liang, HE Ning.
Design and Laser Etching of Embedded Microchannels on AlN Substrate
[J]. China Mechanical Engineering, 2023, 34(20): 2496-2503.
|
[4] |
ZHENG Zhilong, ZHAO Yugang, LIU Qian, WANG Ke, ZHOU Haian, SONG Zhuang, DAI Di, ZHANG Xiajunyu.
Experimental Study on Water Jet Guided Laser Processing of CFRPs
[J]. China Mechanical Engineering, 2023, 34(03): 344-351.
|
[5] |
ZHANG Hongliang, XU Gongjie, BAO Qiang, PAN Ruilin.
Distributed Flexible Job Shop Green Scheduling with Transportation Time
[J]. China Mechanical Engineering, 2022, 33(21): 2554-2563,2645.
|
[6] |
SUN Aihong, SONG Yuchuan, YANG Yunfan, LEI Qi.
Dual Resource-constrained Flexible Job Shop Scheduling Algorithm Considering Machining Quality of Key Jobs
[J]. China Mechanical Engineering, 2022, 33(21): 2590-2600.
|
[7] |
WANG Qiulian, DUAN Xinghao.
Scheduling of Flexible Job Shop Based on High-dimension and Multi-objective Migrating Bird Optimization Algorithm
[J]. China Mechanical Engineering, 2022, 33(21): 2601-2612.
|
[8] |
WANG Jianxin, WU Yaowen, ZHANG Guangyi, CHAO Yang, ZHANG Wenwu, .
Experimental Research of CFRP Cutting by Using Water Jet Guided Laser Processing#br#
[J]. China Mechanical Engineering, 2021, 32(13): 1608-1616.
|
[9] |
LI Xixing, YANG Daoming, LI Xin, WU Rui, .
Flexible Job Shop AGV Fusion Scheduling Method Based on HGWOA
[J]. China Mechanical Engineering, 2021, 32(08): 938-950,986.
|
[10] |
GENG Kaifeng1,2;YE Chunming1;WU Shaoxing2;LIU Li2.
Multi-objective Green Re-entrant Hybrid Flow Shop Scheduling under Time-of-use Electricity Tariffs
[J]. China Mechanical Engineering, 2020, 31(12): 1469-1480.
|
[11] |
LIU Caijie;XU Zhitao;ZHANG Qin;ZHANG Libo;YAO Kun.
Green Scheduling of Flexible Job Shops Based on NSGA-Ⅱ under TOU Power Price
[J]. China Mechanical Engineering, 2020, 31(05): 576-585.
|
[12] |
YANG Dongjing, LEI Deming.
A Novel Shuffled Frog-leaping Algorithm for FJSP withTotal Energy Consumption Constraints
[J]. China Mechanical Engineering, 2018, 29(22): 2682-2689.
|
[13] |
LI Jing, ZHAO Yanhui, YU Huadong, DU Feng, WAN Yanling.
Fabrication and Properties of Superhydrophobic Surface on Aluminum Alloys Substrates by Brush Plating and Laser Processing Technology
[J]. China Mechanical Engineering, 2017, 28(01): 82-87,92.
|
[14] |
Xu Benzhu, Ji Jing, Fei Xiaolu.
Problems and Solutions of Flexible Job-shop Scheduling with Operation Lot-splitting
[J]. China Mechanical Engineering, 2016, 27(23): 3221-3229.
|
[15] |
Zhu Chuanjun, Qiu Wen, Zhu Mengzhou, Chen Guang, Zhang Chaoyong.
Multiobjective Flexible Job Shops Robust Scheduling Problem under Stochastic Processing Times
[J]. China Mechanical Engineering, 2016, 27(12): 1667-1672,1678.
|