[1]Lee K J,Lee J K,Choi S Y.A Spatial Scheduling System and Its Application to Shipbuilding:DAS-CURVE[J].Expert Systems with Applications,1996,10(3):311-324.
[2]Lee J K,Lee K J,Park H K,et al.Developing Scheduling Systems for Daewoo Shipbuilding: DAS Project[J].European Journal of Operational Research,1997,97(2):380-395.
[3]马少辉,王景秋,陆春霞,等.动态空间调度的混合遗传算法[J].运筹与管理,2013,22(2):99-104.
Ma Shaohui,Wang Jingqiu,Lu Chunxia.et al.A Dynamic Spatial Scheduling Approach Based on Hybrid Genetic Algorithm[J]. Operations Research and Management Science,2013,22(2):99-104.
[4]Koh S,Eom C,Jang J,et al.An Improved Spatial Scheduling Algorithm for Block Assembly Shop in Shipbuilding Company[C]//The 3rd International Conference on Innovative Computing Information and Control.Dalian:IEEE, 2008:253-256.
[5]Li Bo,Zhao Zhiyan,Li Gang.A Dynamic Scheduling Method for Spatial Layout Planning[C]//Proceedings of the 4th International Conference on Machine Learning and Cybernetics.Guangzhou:IEEE,2005:18-21.
[6]Li Lin,Jiang Zhibin.Self-adaptive Dynamic Scheduling of Virtual Production Systems[J].International Journal of Production Research,2007,45(9):1937-1951.
[7]张志英,徐晨,毛祖杰,等.基于规则的船舶分段动态空间调度方法[J].上海交通大学学报,2010,44(8):1019-1025.
Zhang Zhiying,Xu Cheng,Mao Zhujie,et al.Rule Based Dynamic Spatial Scheduling for Hull Block Construction[J]. Journal of Shanghai Jiaotong University,2010,44(8):1019-1025.
[8]赵明华,蒋祖华.针对异常的船舶曲面分段作业计划自动调整算法[J].上海交通大学学报, 2010, 44(3):428-432.
Zhao Minghua,Jiang Zhuhua.Algorithm of Automatic Adjustment in Curved Blocks Building Schedule Subject to Exceptions[J]. Journal of Shanghai Jiaotong University,2010,44(3):428-432.
[9]朱琳,何其昌,范秀敏.多品种混合装配车间配料区物料摆放布局优化[J].中国机械工程,2012, 23(22):2708-2713.
Zhu Lin,He Qichang,Fan Xiumin.Optimization of Warehouse Items Layout In a Mixed Assembly Workshop[J].China Mechanical Engineering,2012,23(22):2708-2713.
[10]刘建峰,秦士元,应长春.船舶分段制造日程计划的模拟与优化[J].中国造船,2000, 41(4):13-21.
Liu Jianfeng,Qin Shiyuan,Ying Changchun.Block Construction Scheduling Simulating and Optimizing[J]. Ship Building of China,2000,41(4):13-21.
[11]王岳,姚伟,蒋志勇.基于虚拟仿真的船舶平面分段生产计划调整技术研究[J].中国造船,2012,53(3):192-198.
Wang Yue,Yao Wei,Jiang Zhiyong.Simulation-Based Research on Adjustment Technology of Production Plan on Plane Assembly Lines with Blocked Jobs[J].Ship Building of China,2012,53(3):192-198.
[12]Cha J H,Roh M.Combined Discrete Event and Discrete Time Simulation Framework and Its Application to the Block Erection Process in Shipbuilding[J].Advances in Engineering Software,2010,41:656-665.
[13]张光发,刘玉君,纪卓尚.船舶分段建造计划仿真与优化[J].计算机集成制造系统, 2011,17(12):2643-2651.
Zhang Guangfa,Liu Yujun,Ji Zhuoshang.Simulation and Optimization of Ship Block-Building Planning[J].Computer Integrated Manufacturing Systems,2011,17(12):2643-2651.
[14]Liu Z,Huat D C K,Wee K H.Scheduling Dynamic Block Assembly in Shipbuilding through Hybrid Simulation and Spatial Optimization[J]. International Journal of Production Research, 2012,50(20):5986-6004.
[15]Liu Z,Chua D K,Wee K H.A Simulation Model for Spatial Scheduling Dynamic Block Assembly in Shipbuilding[J]. Journal of Engineering, Project and Production Management,2011,1(1):3-12. |