Wang Xianhong, Shi Guoquan. Applications of a New Logic Intelligent Inference Method in Scheduling Optimization of Mixed Production Lines[J]. China Mechanical Engineering, 2015, 26(10): 1320-1323.
[1]车阿大,鹏宇,杨乃定.复杂无等待自动化制造系统的调度算法研究[J].计算机集成制造系统,2007,13(8):1616-1623.
[2]Levner E, Kats V, Levit V E. An Improved Algorithm for Cyclic Scheduling in a Robotic Cell[J]. European Journal of Operational Research, 1997,97 (3) :500-508.
[3]Che Ada, Chu Chengbin, Chu Feng. Multicyclic Hoist Scheduling with Constant Processing Times[J]. IEEE Transactions on Robotics and Automation, 2002,18 (1) : 69-80.
[4]Liu J Y,Jiang Y. An Efficient Optimal Solution to the Two-hoist No-wait Cyclic Scheduling Problem [J]. Operations Research, 2005, 53(2) :313-327.
[5]Leung J M Y,Levner E. An Efficient Algorithm for Multi-hoist Cyclic Scheduling with Fixed Processing Times[J]. Operations Research Letters, 2006, 34 (4) :465-472.
[6]Che Ada, Chu Chengbin. Multi-degree Cyclic Scheduling of Two Robots in a No-wait Flowshop[J]. IEEE Transactions on Automation Science and Engineering, 2005,2(9) : 173-183.
[7]赵振宏,肖田元.机器人制造单元的建模与任务调度策略[J].计算机集成制造系统,2001,7(4):7-11.
[8]吕文彦,党延忠.基于B-T规则与遗传算法的可重入生产系统调度[J].系统仿真学报,2005,17(4):993-996.