[1]陈国权.企业实施敏捷制造的过程框架[J].清华大学学报:哲学社会科学版,1999(2):58-61.
[2]吴秀丽[1],李苏剑[1],杜彦华[1].柔性作业车间多品种小批量调度算法研究[J].中国机械工程,2010(4):424-429.
[3]Sugimura N,Tanimizu Y,Iwamura K. A Study on Real-time Scheduling for Holonic Manufacturing System [J]. Journal of Manufacturing Systems, 2004,33(5) :467-475.
[4]Li Z,Ierapetritou M. Process Scheduling under Un- certainty: Review and Challenges[J]. Computers and Chemical Engineering, 2008,32 (4/5) : 715-727.
[5]Leon V J, wu S D, Storer R H. Robustness Meas- ures and Robust Scheduling for Job- shop [J]. IEEE Transactions, 1994, 26(5): 32-43.
[6]张沙清[1],陈新度[1],陈庆新[1],陈新[1].基于改进多目标微粒群算法的模具多项目反应调度[J].中国机械工程,2011,22(10):1173-1179.
[7]Abumaizar R J, Svestka J A. Rescheduling Job Shops under Random Disruptions[J]. International Journal of Produetion Researeh, 1997,35 (7) : 2065- 2082.
[8]Wu S D,Storer R H,Chang P C. One-machine Re-scheduling Heuristics with Efficiency and Stability as Criteria [J]. Computers and Operations Re- search, 1993,20(1) .. 1-14.
[9]李莉[1],乔非[1],吴启迪[1].半导体制造重调度研究[J].中国机械工程,2006,17(6):612-616.
[10]Parviz F, Fariborz J, Jamal A. Flexible Job Shop Scheduling with Overlapping in Operations [J] Applied Mathematical Modeling, 2009, 33 ( 7 ) : 3076-3087.
[11]Sabuneuoglu I,Karabuk S. Rescheduling Frequency in an FMS with Uncertain Processing Times and Unreliable Machines[J]. Journal of Manufacturing Systems, 1999,18 (4) :268-283.
[12]李铁克[1,2],肖拥军[1,3],王柏琳[1,2].基于局部性修复的HFS机器故障重调度[J].管理工程学报,2010(3):45-49.
[13]任海英[1],邹艳蕊[1].基于多Agent的柔性作业车间预先/重调度系统[J].武汉理工大学学报:信息与管理工程版,2012,34(1):69-73.
[14]Wh H H,Li R K. A New Rescheduling Method for Computer Based Scheduling Systems[J]. Interna- tional Journal of Production Research, 1995, 33 (8) :2097-2110.
[15]Leon V J,Wu S D,Storer R H. Games Theoretic Control Approach for Job Shops in the Presence of Disruptions[J]. International Journal of Produc- tion Researeh, 1994,32(6) : 1451-1476.
[16]Abumaizar R J, Svestka J A. Rescheduling Job Shops under Disruptions[J]. International Journal of Production Research, 1997,35 (7) : 2065-2082. |