[1]Goren S, Sabuncuoglu I. Robustness and StabilityMeasures for Scheduling: Single- machine Environment[J]. IIE Transactions, 2008, 40(1) :66-83.
[2]Aytug H, Lawley M, Mckay K, et al. Executing Production Schedules in the Face of Uncertainties: a Review and Some Future Directions[J]. European Journal of Operational Research, 2005, 161: 86- 110.
[3]Davenport A J, Beck J C. A Survey of Techniques for Scheduling with Uncertainty[EB/OL]. http:// eil. utoronto, ca/profiles/chris/chris, papers, html, 2000/2010-06-01.
[4]van de Vonder S, Demeulemeester E, Herroelen W. Proactive Heuristic Procedures for Robust Pro- jeet Seheduling:an Experimental Analysis[J]. Eu- ropean Journal of Operational Research, 2008, 189 (3) : 723-33.
[5]Bidot J, Vidal T, Laborie P, et al. A Theoretic and Practical Framework for Scheduling in a Stochastic Environment[J]. Journal of Scheduling, 2009, 10 (3) : 315-344.
[6]Leus R, Herroelen W. Scheduling for Stability in Single--machine Production Systems[J]. Journal of Scheduling, 2007, 10: 223-235.
[7]Sabuncuoglu I, Goren S. Hedging Production Schedules Against Uncertainty in Manufacturing Environment with a Review of Robustness and Sta- bility Research[J]. International Journal of Computer Integrated Manufacturing, 2009, 22(2):138- 157.
[8]Mehta S V, Uzsoy R. Predictable Scheduling of a Single Machine Subject to Breakdowns[J]. International Journal of Computer Integrated Manufacturing, 1999, 12(1):15-38.
[9]O'Donovan R, Uzsoy R, McKay K N. Predictable ScheduLing of a Single Machine with Breakdowns and Sensitive Jobs[J]. International Journal of Production Research, 1999, 37(18):4217-4233.
[10]Li Q, Wang B. A Stable Scheduling for Single Machine under Uncertainty[C]//Proceedings of the IEEE International Conference on Automation and Logistics. Shenyang, 2009 : 526-531.
[11]Leus R, Herroelen W. The Complexity of Ma- chine Scheduling for Stability with a Single Dis- rupted Job [J]. Operations Research Letters, 2005, 33:151-156.
[12]李英杰[1],陈庆新[1],陈新度[1],陈新[1].多属性的虚拟企业并行协商项目规划算法[J].机械工程学报,2005,41(2):215-222.
[13]李英杰[1],陈庆新[1],陈新度[1],陈新[1].多属性的虚拟企业串行协商项目规划[J].中国机械工程:598-603.
[14]Johnson S M. Optimal Two--and Three--stage Production Schedules with Set--up Times Includ- ed[J]. Naval Research Logistics Quarterly, 1954, 1:61-68.
[15]Pinedo M L. Scheduling Theory, Algorithms, and Systems[M]. London:Springer, 2008.
[16]Sabuncuoglu I, Bayiz M. Job Shop Scheduling with Beam Search[J]. European Journal of Opera- tional Research, 1999, 118:390-412.
[17]XErenay F S, Sabuncuoglu I, Toptal A. New Solu- tion Methods for Single Machine Bicriteria Scheduling Problem: Minimization of Average Flowtime and Number of Tardy Jobs[J]. European Journalof Operational Research, 2010, 201:89-98.
[18]Valente J M S, Alves R. Beam Search Algorithms for the Single Machine Total Weighted Tardiness Scheduling Problem with Sequence- dependent Setups[J]. Computers & Operations Research, 2008, 35:2388-2405. |