[1]田颖[1,2],江平宇[1,2],周光辉[1,2],赵刚[1,2].基于遗传算法的工艺规划与调度集成方法[J].西安交通大学学报,2006,40(9):1041-1044.
[2]张志英,唐承统,张建民,王新永,孙连胜.遗传算法在柔性CAPP与生产调度集成中的应用[J].计算机集成制造系统,2002,8(8):621-624.
[3]杨洪柏,彭召旺.面向非线性工艺计划的动态多任务调度[J].上海交通大学学报,2000,34(3):400-403.
[4]吴德中,严隽琪.CAPP与PPC的并行分布式集成研究[J].上海交通大学学报,1996,30(12):1-6.
[5]Sanjay Kumar Shukla,M. K. Tiwari,Young Jun Son.Bidding-based multi-agent system for integrated process planning and scheduling: a data-mining and hybrid tabu-SA algorithm-oriented approach[J]. The International Journal of Advanced Manufacturing Technology . 2008 (1-2)
[6]W. J. Zhang,S. Q. Xie.Agent technology for collaborative process planning: a review[J]. The International Journal of Advanced Manufacturing Technology . 2007 (3-4)
[7]Manish Kumar,Sunil Rajotia.Integration of process planning and scheduling in a job shop environment[J]. The International Journal of Advanced Manufacturing Technology . 2006 (1-2)
[8]Wei Tan,Behrokh Khoshnevis.A linearized polynomial mixed integer programming model for the integration of process planning and scheduling[J]. Journal of Intelligent Manufacturing . 2004 (5)
[9]Lihui Wang,Weiming Shen.DPP: An agent-based approach for distributed process planning[J]. Journal of Intelligent Manufacturing . 2003 (5)
[10]H. Lee,S.-S. Kim.Integration of Process Planning and Scheduling Using Simulation Based Genetic Algorithms[J]. International Journal of Advanced Manufacturing Technology . 2001 (8)
[11]George Chryssolouris,Velusamy Subramaniam.Dynamic scheduling of manufacturing job shops using genetic algorithms[J]. Journal of Intelligent Manufacturing . 2001 (3)
[12]Wei Tan,Behrokh Khoshnevis.Integration of process planning and scheduling— a review[J]. Journal of Intelligent Manufacturing . 2000 (1)
[13]Alexander Weintraub,Denis Cormier,Thom Hodgson,Russell King,James WIlson,Andrew Zozom.Scheduling with alternatives: a link between process planning and scheduling[J]. IIE Transactions . 1999 (11)
[14]C. Saygin,S. E. Kilic.Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems[J]. International Journal of Advanced Manufacturing Technology . 1999 (4)
[15]Moreno M D R,Oddi A,Borrajo D,et al.IPSS:aHybrid Approachto Planning and Scheduling Inte-gration. IEEE Transactions on Knowledge andData Engineering . 2006
[16]Bang C W.Hybrid Integration Approach for ProcessPlanning and Shop Floor Scheduling in Agile Manu-facturing. . 2002
[17]Usher J M,Fernandes K J.Dynamic Process Plan-ning-the Static Phase. Journal of Materials Pro-cessing Technology . 1996
[18]Chryssolouris G,Chan S,Cobb W.Decision Makingon the Factory Floor:an Integrated Approach toProcess Planning and Scheduling. Robotics&Computer-integrated Manufacturing . 1984
[19]Khoshnevis B,Chen Q M.Integration of ProcessPlanning and Scheduling Function. IIE Inte-grated Systems Conference&Society for Integrat-ed Manufacturing Conference Proceedings . 1989
[20]Wang Z B,Chen Y L,Wang N S.Research on Dy-namic Process Planning System Considering Deci-sion about Machines. Proceeding of the 5thWorld Congress on Intelligent Control and Auto-mation . 2004
[21]Zhang Y,Saravanan A,Fuh J.Integration ofProcess Planning and Scheduling by Exploring theFlexibility of Process Planning. InternationalJournal of Production Research . 2003
[22]Li W D,Mc Mahon C.A Si mulated Annealing-based Opti mization Approach for IntegratedProcess Planning and Scheduling. InternationalJournal of Computer Integrated Manufacturing . 2007
[23]Nof S Y,Grant F H.Adaptive Predictive Schedu-ling Reviewand a General Framework. Produc-tion Plan&Control . 1991
[24]Donovan O R,Uzsoy R.Predictable Scheduling of aSingle Machine with Breakdowns and Sensitive.1006.Jobs. International Journal of Production Re-search . 1999
[25]NORHASHIMAH MORAD,AMS ZALZALA.Genetic algorithms in integrated process planning and scheduling[J]. Journal of Intelligent Manufacturing . 1999 (2)
[26]Gareth J. Palmer.A simulated annealing approach to integrated production scheduling[J]. Journal of Intelligent Manufacturing . 1996 (3)
[27]P. Prabhu,H. P. Wang.Algorithms for computer-aided generative process planning[J]. The International Journal of Advanced Manufacturing Technology . 1991 (1)
[28]Moon I,Lee S,Bae H.Genetic Algorithms for JobShop Scheduling Problems with Alternative Rout-ings. International Journal of Production Re-search . 2008
[29]Wong T,Leung C,Mak K,et al.Dynamic Shop-floor Scheduling in Multi-agent ManufacturingSystem. Expert Systems With Applications . 2006
[30]Sormaz D N,Arumugam J,Rajaraman S.Integra-tive Process Plan Model and Representationfor In-telligent Distributed Manufacturing Planning. International Journal of Production Research . 2004
[31]Chen YJ.AnIntegrated Process Planning and Pro-duction Scheduling Framework for Mass Customi-zation. . 2003
[32]Mishra N,Choudhary A K,Ti wari M K.Modelingthe Planning and Scheduling Across the Outsourc-ing Supply Chain:a Chaos-based Fast Tabu-SAApproach. International Journal of ProductionResearch . 2008
[33]Gindy N N,Saad S M,Yue Y.Manufacturing responsiveness through integrated process planning and scheduling. International Journal of Production Research . 1999
[34]Yeo Keun Kim,Kitae Park,Jesuk Ko.A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research . 2003
[35]Suresh V,Chandhuri D.Dynamic scheduling: a survey of research. International Journal of Production Economics . 1993
[36]Kis Tamas.Job-shop scheduling with processing alternatives. European Journal of Operational Research . 2003
[37]Kuhnle H,Braun H J,Buhring J.Integration of CAPP and PPC Interfusion Manufacturing Management. Integrated Manufacturing Systems . 1994
[38]An Integrated Approach to Process Planning and Shcteduling,G.Chr yssolouris,S. . 1985
[39]Beckendorff U,Kreutzfeldt J,Ullmann W.Reactive Workshop Scheduling based on Alternative Routings. Proceedings of a Conference on Factory Automation and Information Management . 1991
[40]DavudMattox.IPPM—APrototypetoIntegrateProcessPlanningandJobShopSchedulingFunctions. AnnalsoftheCIRP . 1993
[41]Wang L H,Shen W M.Process Planning and Scheduling for Distributed Manufacturing. . 2007
[42]Jackson J R.Simulation research on job shop production. Naval Research Logistics Quarterly . 1957
[43]Ramash R.Dynamic Job Shop Scheduling-A Review of Simulation Research. OMEGA International Journal of Manage Science . 1990
[44]SZELDE E K,ROGER M.Knowledge-based reactive scheduling. Production Plan & Control . 1994
[45]MOON C,SEO Y.Evolutionary algorithm for advanced process planning and scheduling in a multi-plant. Computers and Industrial Engineering . 2005
[46]F.T.S., Chan,SH Chung,PLY Chan.An adaptive genetic algorithm with dominated genes for distributed scheduling problems. Expert Systems With Applications . 2005
[47]Shao X Y,Li X Y,Gao L,Zhang C Y.Integration of Process Planning and Scheduling-A Modified Genetic Algorithm-based Approach. Computers and Operations Research . 2009
[48]F. T. S.,Chan, J.,Zhang, LIP.Modelling of integrated, distributed and cooperative process planning system using an Agent-based approach. Proceedings of the Institution of Mechanical Engineers (IMECHE) Part B: Journal of Engineering Manufacture . 2001
[49]YW Guo,WD Li,AR Mileham,GW Owen.Applications of particle swarm optimisation in integrated process planning and scheduling. Robot Comput-Integr Manuf . 2009
[50]R.Kumar,,M.Tiwari,,R.Shankar."Scheduling of flexible manufacturing systems:an ant colony optimization approach,". Proceedings of the Institution of Mechanical Engineers,Part B:Journal of Engineering Manufacture . 2003 |