[1]刘飞,李聪波,曹华军,等. 基于产品生命周期主线的绿色制造技术内涵及技术体系框[J]. 机械工程学报, 2009, 45(12):115-120.
LIU Fei, LI Congbo, CAO Huajun, et al. Green Manufacturing Technology Connotation and System Framework Based on Product Life Cycle[J]. Journal of Mechanical Engineering, 2009, 45(12):115-120.
[2]MCGOVERN S M, GUPTA S M. A Balancing Method and Genetic Algorithm for Disassembly Line Balancing[J]. European Journal of Operational Research, 2007, 179(3):692-708.
[3]HEZER S, KARA Y. A Network-based Shortest Route Model for Parallel Disassembly Line Balancing Problem[J]. International Journal of Production Research, 2015, 53(6):1849-1865.
[4]KOC A, SABUNCUOGLU I, EREL E. Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an AND/OR Graph[J]. IIE Transactions, 2009, 41(10):866-881.
[5]RIGGS R J, BATTAIA O, HU S J. Disassembly Line Balancing under High Variety of End of Life States Using a Joint Precedence Graph Approach[J]. Journal of Manufacturing Systems, 2015, 37:638-648.
[6]ZHANG Z, WANG K, ZHU L, et al. A Pareto Improved Artificial Fish Swarm Algorithm for Solving a Multi-objective Fuzzy Disassembly Line Balancing Problem[J]. Expert Systems with Applications, 2017, 86:165-176.
[7]REN Y, YU D, ZHANG C, et al. An Improved Gravitational Search Algorithm for Profit-oriented Partial Disassembly Line Balancing Problem[J]. International Journal of Production Research, 2017, 55(24):7302-7316.
[8]OZCEYLAN E, KALAYCI C B, GUNGOR A, et al. Disassembly Line Balancing Problem:a Review of the State of the Art and Future Directions[J]. International Journal of Production Research, 2018(1):1-23.
[9]AVIKAL S, MISHRA P K, JAIN R. A Fuzzy AHP and PROMETHEE Method-based Heuristic for Disassembly Line Balancing Problems[J]. International Journal of Production Research, 2014, 52(5):1306-1317.
[10]ALTEKIN F T, KANDILLER L, OZDEMIREL N E. Profit-oriented Disassembly Line Balancing[J]. International Journal of Production Research, 2008, 46(10):2675-2693.
[11]BENTAHA M L, BATTAIA O, DOLGUI A. An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing Times[J]. International Journal of Production Research, 2015, 53(6):1807-1818.
[12]李六柯,张则强,胡扬,等. 基于多目标算法与动态仿真的带调整时间的拆卸线平衡优化方法[J]. 中国机械工程, 2017, 28(17):2115-2124.
LI Liuke, ZHANG Zeqiang, HU Yang, et al. Optimization of Disassembly Line Balancing Problems with Setup Times Based on Multi-objective Algorithm and Dynamic Simulation[J]. China Mechanical Engineering, 2017, 28(17):2115-2124.
[13]丁力平,谭建荣,冯毅雄,等. 基于Pareto蚁群算法的拆卸线平衡多目标优化[J]. 计算机集成制造系统, 2009, 15(7):1406-1413.
DING Liping, TAN Jianrong, FENG Yixiong, et al. Multi-objective Optimization for Disassembly Line Balancing Based on Pareto Ant Colony Algorithm[J]. Computer Integrated Manufacturing Systems, 2009, 15(7):1406-1413.
[14]LIU J, WANG S. Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment[J]. Sustainability, 2017, 9(3):1-15.
[15]汪开普,张则强,毛丽丽,等. 多目标拆卸线平衡问题的Pareto人工鱼群算法[J]. 中国机械工程, 2017, 28(2):183-190.
WANG Kaipu, ZHANG Zeqiang, MAO Lili, et al. Pareto Artificial Fish Swarm Algorithm for Multi-objective Disassembly Line Balance Problems[J]. China Mechanical Engineering, 2017, 28 (2):183-190.
[16]李六柯,张则强,朱立夏,等.多目标不完全拆卸线平衡问题的建模与优化[J]. 机械工程学报, 2018, 54(3):125-136.
LI Liuke, ZHANG Zeqiang, ZHU Lixia, et al. Modeling and Optimizing for Multi-objective Partial Disassembly Line Balancing Problem [J]. Journal of Mechanical Engineering, 2018, 54(3):125-136.
[17]METE S, CIL Z A, OZCEYLAN E, et al. Resource Constrained Disassembly Line Balancing Problem[J]. IFAC Papers Online, 2016, 49(12):921-925.
[18]崔文华,刘晓冰,王伟,等. 混合蛙跳算法研究综述[J]. 控制与决策, 2012, 27(4):481-486.
CUI Wenhua, LIU Xiaobin, WANG Wei, et al. Survey on Shuffled Frog Leaping Algorithm[J]. Control and Decision, 2012, 27(4):481-486.
[19]王松,孙振忠,郭建文,等. 基于混合蛙跳算法的复杂产品装配序列规划[J]. 计算机集成制造系统, 2014(12):2991-2999.
WANG Song, SUN Zhenzhong, GUO Jianwen, et al. Assembly Sequence Planning Based on Shuffled Frog Leaping Algorithm[J]. Computer Integrated Manufacturing Systems, 2014(12):2991-2999.
[20]DEB K, PRATAP A, AGARWAL S, et al. A Fast and Elitist Multi-objective Genetic Algorithm:NSGA-Ⅱ[J]. IEEE Transactions on Evolutionary Computation, 2002, 6(2):182-197.
[21]KALAYCI C B, GUPTA S M. A Particle Swarm Optimization Algorithm for Solving Disassembly Line Balancing Problem[C]∥Proceedings for the Northeast Region Decision Sciences Institute. Newport, 2012:2142-2148. |