[1]于晓义,孙树栋,王彦革.面向随机加工时间的车间作业调度[J].中国机械工程,2008,19(19):2319-2324.
Yu Xiaoyi, Sun Shudong, Wang Yange. Researche on Stochastic Processing Time Oriented Job-shop Scheduling[J]. China Mechanical Engineering, 2008, 19(19): 2319-2324
[2]Honkomp S J, Mockus L, Reklaitis G V. Robust Scheduling with Processing Time Uncertainty[J]. Computers & Chemical Engineering, 1997, 21(10): S1055-S1060.
[3]Bonfill A, Espua A, Puigjaner L. Proactive Approach to Address the Uncertainty in Short-term Scheduling[J]. Computers & Chemical Engineering, 2008, 32(8): 1689-1706.
[4]徐震浩, 顾幸生. 不确定条件下具有零等待的流水车间免疫调度算法[J]. 计算机集成制造系统, 2004, 10(10):1247-1251.
Xu Zhenghao, Gu Xingsheng. Immune Scheduling Algorithm for Flow Shop under Uncertainty with Zero Wait[J]. Computer Intergrated Manufacturing Systems, 2004,10(10):1247-1252.
[5]He C, Qiu D, Guo H. Solving Fuzzy Job Shop Scheduling Problem Based on Interval Number Theory[J]. Lecture Notes in Electrical Engineering, 2013, 211:393-401.
[6]Lei D. Population-based Neighborhood Search for Job Shop Scheduling with Interval Processing Time[J]. Computers & Industrial Engineering, 2011, 61(4): 1200-1208.
[7]Lei D. Interval Job Shop Scheduling Problems[J]. International Journal of Advanced Manufacturing Technology, 2012, 60(1/4):291-302.
[8]Janak S L, Lin X, Floudas C A. A New Robust Optimization Approach for Scheduling under Uncertainty : II. Uncertainty with Known Probability Distribution[J]. Computers & Chemical Engineering, 2007, 31(3):171-195.
[9]唐秋华, 何明, 何晓霞,等. 随机工时下柔性加工车间的鲁棒优化调度方法[J]. 计算机集成制造系统, 2015, 21(4):1002-1012.
Tang Qiuhua, He Ming, He Xiaoxia, et al. Robust Optimization Scheduling of Flexible Job Shops under Stochastic Processing Times[J]. Computer Integrated Manufacturing Systems,2015,21(4):1002-1012.
[10]Lin X, Janak S L, Floudas C A. A New Robust Optimization Approach for Scheduling under Uncertainty: I. Bounded Uncertainty[J]. Computers & Chemical Engineering, 2004, 28(6/7):1069-1085.
[11]Xue F, Sandeson A C, Graves R J. Pareto-based Multi-objective Differential Evolution[C]//Proceedings of the 2003 Congress on Evolutionary Computation. Washington D C, 2003:862-869.
[12]汪双喜, 张超勇, 刘琼,等. 不同再调度周期下的柔性作业车间动态调度[J]. 计算机集成制造系统, 2014, 20(10): 2470-2478.
Wang Shuangxi, Zhang Chaoyong, Liu Qiong, et al. Flexible Job Shop Dynamic Scheduling under Different Reschedule Periods[J].Computer Integrated Manufacturing Systems,2015,21(4):1002-1012.
[13]张利平.作业车间预反应式动态调度理论与方法研究:[D]. 武汉:华中科技大学,2013.
[14]王凌.智能优化算法及其应用[M].北京:清华大学出版社,2001.
[15]Xia W J, Wu Z M. An Effective Hybrid Optimization Approach for Multi-objective Flexible Job Shop Scheduling Problems[J]. Computers & Industrial Engineering, 2005,48(2): 409-425.
[16]Murata T, Ishibuchi H, Gen M. Multi-objective Fuzzy Scheduling with the OWA Operator for Handling Different Scheduling Criteria and Different Job Importance[C]//IEEE International Fuzzy Systems Conference Proceedings. Seoul, 1999:773-778.
[17]Li J Q, Pan Q K, Gao K Z. Pareto-based Discrete Artificial Bee Colony Algorithm for Multi-objective Flexible Job-shop Scheduling Problems[J]. International Journal of Advanced Manufacturing Technology,2011,55: 1159-1169.
[18]Moslehi G, Mahnam M. A Pareto Approach to Multi-objective Flexible Job-shop Scheduling Problem Using Particle Swarm Optimization and Local Search[J]. International Journal of Production Economics, 2011,129(1): 14-22.
[19]Sakawa M, Kubota R. Fuzzy Programming for Multi-objective Job Shop Scheduling with Fuzzy Processing Time and Fuzzy due Date Through Genetic Algorithm[J].European Journal of Operational Research, 2000,120(2):393-407.
[20]刘炜琪,刘琼,张超勇,等. 基于混合粒子群算法求解多目标混流装配线排序[J].计算机集成制造系统, 2011, 17(12): 2590-2598.
Liu Weiqi, Liu Qiong, Zhang Chaoyong, et al. Hybrid Particle Swarm Optimization for Multy-objective Sequencing Problem in Mixed Model Assembly Lines[J]. Computer Integrated Manufacturing Systems, 2011, 17(12): 2590-2598.
|