[1]吕盛坪,乔立红.工艺规划与车间调度及两者集成的研究现状和发展趋势[J].计算机集成制造系统,2014,20(2):290-300.
Lü Shengping,Qiao Lihong.Current Status and Developing Trend of Process Planning and Job Shop Scheduling[J].Computer Integrated Manufacturing Systems,2014,20(2):290-300.
[2]高亮,李新宇.工艺规划与车间调度集成研究现状及进展[J].中国机械工程,2011,22(8):1001-1007.
Gao Liang,Li Xinyu.Current Researches on Integrated Process Planning and Scheduling[J].China Mechanical Engineering, 2011, 22(8):1001-1007.
[3]Zhang Luping,Wong T N.An Object-coding Genetic Algorithm for Integrated Process Planning and Scheduling[J].European Journal of Operational Research,2015,244(2):434-444.
[4]Li Xinyu,Shao Xinyu,Gao Liang,et al.An Effective Hybrid Algorithm for Integrated Process Planning and Scheduling[J].Int. J. Production Economics,2010,126:289-298.
[5]Li Xinyu,Gao Liang,Shao Xinyu.An Active Learning Genetic Algorithm for Integrated Process Planning and Scheduling[J]. Expert Systems with Applications,2012,39(8):6683-6691.
[6]Leung C W,Wong T N,Mak K L,et al.Integrated Process Planning and Scheduling by an Agent-based Ant Colony Optimization[J]. Computers & Industrial Engineering,2010,59:166-180.
[7]吕盛坪,乔立红.工艺规划与调度复合式集成模型[J].计算机集成制造系统,2014,20(1):110-120.
Lü Shengping,Qiao Lihong.Hybrid Integration Model for Process Planning and Scheduling[J].Computer Integrated Manufacturing Systems, 2014,20(1):110-120.
[8]Seker A,Erol S,Botsali R.A Neuro-fuzzy Model for a New Hybrid Integrated Process Planning and Scheduling System[J].Expert Systems with Applications,2013,40(13):5341-5351.
[9]Li Xinyu,Gao Liang, Shao Xinyu.Mathematical Modeling and Evolutionary Algorithm-based Approach for Integrated Process Planning and Scheduling[J].Computers & Operations Research,2010,37(4):656-667.
[10]Phanden R K,Jain A,Verma R.An Approach for Integration of Process Planning and Scheduling[J].International Journal of Computer Integrated Manufacturing,2013,26(4):284-302.
[11]杨宏安,王周锋,吕阳阳,等.工序加工时间不确定条件下作业车间调度问题的区间数求解方法[J]. 计算机集成制造系统, 2014, 20(9):2232-2240.
Yang Hongan,Wang Zhoufeng,Lü Yangyang,et al.Interval Number Solving Method for Job-shop Scheduling Problem with Processing Time Variability[J].Computer Integrated Manufacturing Systems,2014,20(9):2232-2240.
[12]汪俊亮,张洁,秦威,等. 加工时间不确定的柔性作业车间鲁棒调度方法[J]. 中国机械工程, 2015, 26(5): 627-631.
Wang Junliang, Zhang Jie, Qin Wei, et al. Robust Scheduling on Flexible Job Shop with Uncertain Processing Time[J].China Mechanical Engineering, 2015, 26(5):627-631.
[13]李俊青,潘全科.求解模糊作业车间调度问题的混合优化算法[J].机械工程学报,2013, 49(23):142-149.
Li Junqing, Pan Quanke. Solving Fuzzy Job-shop Scheduling Problems by a Hybrid Optimization Algorithm[J].Journal of Mechanical Engineering, 2013,49(23):142-149.
[14]Palacios J J, Gonzalez M A, Vela C R, et al. Genetic Tabu Search for the Fuzzy Flexible Job Shop Problem[J].Computers & Operations Research,2015,54:74-89.
[15]杨建斌,孙树栋,牛刚刚,等.自适应遗传算法求解模糊作业车间调度问题[J].机械科学与技术,2013,32(1):16-21.
Yang Jianbin, Sun Shudong, Niu Ganggang, et al. Adaptive Genetic Algorithm for Fuzzy Job-shop Scheduling Problem[J].Mechanical Science and Technology for Aerospace Engineering,2013,32(1):16-21.
[16]Lin Jian.A Hybrid Biogeography-based Optimization for the Fuzzy Flexible Job-shop Scheduling Problem[J]. Knowledge-based Systems, 2015,78:59-74.
[17]Xu Ye,Wang Ling Wang Shengyao,et al.An Effective Teaching-learning-based Optimization Algorithm for the Flexible Job-shop Scheduling Problem with Fuzzy Processing Time[J].Neurocomputing,2015,148:260-268.
[18]吴立华,陈新度,陈庆新,等.任务工时不确定的模具车间前摄性调度研究[J].中国机械工程,2011,22(21):2560-2565.
Wu Lihua,Chen Xindu,Chen Qingxin,et al.Research on Proactive Scheduling of Mould Shop Floor with Uncertain Processing Times[J]. China Mechanical Engineering,2011,22(21):2560-2565.
[19]Liefooghe A,Basseur M,Humeau J,et al.On Optimizing a Bi-objective Flowshop Scheduling Problem in an Uncertain Environment[J]. Computers and Mathematics with Applications,2012,64:3747-3762.
[20]Balin S.Parallel Machine Scheduling with Fuzzy Processing Times Using a Robust Genetic Algorithm and Simulation[J].Information Sciences,2011,181(17):3551-3569.
[21]曾强,杨育,王勇智,等.复合工艺流程下批量生产车间调度多目标优化[J].中国机械工程,2011,22(2):190-196.
Zeng Qiang,Yang Yu,Wang Yongzhi,et al.Multi-objective Optimization Scheduling for Job Shop of Batch Production with Multiple Process Flows[J].China Mechanical Engineering,2011,22(2):190-196.
[22]董蓉,何卫平.求解FJSP的混合遗传-蚁群算法[J].计算机集成制造系统,2012,18(11):2492-2501.
Dong Rong,He Weiping.Hybrid Genetic Algorithm-ant Colony Optimization for FJSP Solution[J]. Computer Integrated Manufacturing Systems, 2012, 18(11):2492-2501. |