[1]俞富超.加工装配式生产车间作业计划与控制系统的研究[D].西安:西安电子科技大学,2005.
[2]Pan Quanke,Tasgetiren M F,Suganthan P N,et al.A Discrete Artificial Bee Colony Algorithm for the Lot-streaming Flow Shop Scheduling Problem[J].Information Sciences,2011,181(12):2455-2468.
[3]Xi Sun,Kazuko Morizawa,Hiroyuki Nagasawa.Powerful Heuristics to Minimize Makespan in Fixed,3-Machine, Assembly-type Flow Shop Scheduling[J].European Journal of Operational Research,2003,146(3):498-516.
[4]Tariq Aldowaisan, Ali Allahverdi. New Heuristics for No-wait Flow Shops to Minimize Makespan[J]. Computers and Operations Research,2003,30(8):1219-1231.
[5]Cummings D H,Egbelu M P J.Minimizing Production Flow Time in a Process and Assembly Job Shop[J].International Journal of Production Research,2010,36(8):2315-2332.
[6]Masao Y. Hybrid Flow-shop Scheduling with Assembly Operations[J].International Journal of Production Economics, 2001, 73(2):103-116.
[7]汪志刚,张华.绿色再制造管理层次网络分析模型及应用[J].系统工程与电子技术,2008,30(12):2417-2420.
Wang Zhigang,Zhang Hua.Hierarchical Network Model for Green Remanufacturing Management and Case Study[J]. Systems Engineering and Electronics,2008,30(12):2417-2420.
[8]Fang Kan,Uhan N,Zhao Fu,et al.A New Shop Scheduling Apporach in Support of Sustainable Manufacturing[J].The International Journal of Advanced Manufacturing Technology,2011,12:305-310.
[9]Gong G,Lu N,Lu J,et al.A Single Machine Scheduling Strategy for Energy Saving in Injection Molding Process[C]//Annual Technical Conference. Boston,2012:2209-2213.
[10]王坚,张悦.企业节能生产调度优化一阶混杂Petri网方法[J].计算机集成制造系统,2012,18(5):2011-2020.
Wang Jian,Zhang Yue.Enterprises Energy-saving Production Dispatching Optimization Based on First-order Hybrid Petri Net[J]. Conputer Integrated Manufacturing Systems,2012,18(5):2011-2020.
[11]王伟. 面向能耗优化的车间调度方法研究及其应用环境开发[D]. 哈尔滨: 哈尔滨工业大学,2009.
[12]He Yan,Liu Bo,Zhang Xiaodong,et al. A Modeling Method of Task-oriented Energy Consumption for Machining Manufacturing System[J].Journal of Cleaner Production,2012,23(1):167-174.
[13]Peder L,James L,Daniel L,et al.Comparison and Analysis of Eight Scheduling Heuristics for the Optimization of Energy Consumption and Makespan in Large-scale Distributed Systems[J].The Journal of Supercomputing, 2012, 59(1): 323-360.
[14]Dai Min,Tang Dunbing,Giret A,et al.Energy-efficitent Scheduling for a Flexible Flow Shop Using an Improved Genetic-simulated Anneling Algorithm[J].Robotics and Computer-Integrated Manufacturing,2013,29(5):418-429.
[15]Fang K T,Lin B M T.Parallel-machine Scheduling to Minimize Tardiness Penalty and Power Cost[J].Computers & Industrial Engineering,2013,64(1):224-234.
[16]Mate H,Ferenc F.The Role of Energy Consumption in Bath Process Scheduling[C]//21st European Symposium on Computer Aided Process Engineering.Berlin:Computer Aided Chemical Engineering Press,2011:1979-1983.
[17]刘波,王凌,金以慧.差分进化算法研究进展[J].控制与决策,2007,22(7):721-729.
Liu Bo,Wang Ling,Jin Yihui.Advances in Differential Evolution[J],2007,22(7):721-729.
[18]王海燕,赵燕伟,王万良,等.两级差分进化算法求解多资源作业车间批量调度问题[J].控制与决策,2010,25(11):1635-1644.
Wang Haiyan,Zhao Yanwei,Wang Wanliang,et al.New Parallel Algorithm Based on DE for Batch Splitting Job Shop Scheduling under Multiple-resource Constraints[J].Control and Decision,2010,25(11):1635-1644.
[19]Kacem I,Hammadi S,Borne P.Approach by Localization and Multiobjective Evolutionary Optimization for Flexible Job-Shop Scheduling Problems[J].IEEE Transactions on Systems,Man and Cybemetics,Part C,2002,32(1):408-419.
[20]Zhang Haipeng,Gen M.Multistage-based Genetic Algorithm for Flexible Job-Shop Scheduling Problem[J].Journal of Complexity Internaltional,2005,11:223-232.
[21]张超勇,饶云清,李培根,等.柔性作业车间调度问题的两级遗传算法[J].机械工程学报,2007,43(4):119-124.
Zhang Chaoyong,Rao Yunqing,Li Peigen,et al.Bilevel Genetic Algorithm for the Flexible Job-Shop Scheduling Problem[J]. Chinese Journal of Mechanical Engineering,2007,43(4):119-124.
[22]王万良,王磊,王海燕,等.基于混合差分进化算法的作业车间动态调度[J].计算机集成制造系统,2012,18(3):531-539.
Wang Wanliang,Wang Lei,Wang Haiyan,et al.Dynamic Job Shop Scheduling Based on Hybrid Differential Evolution Algorithm[J]. Computer Integrated Manufacturing Systems,2012,18(3):531-539.
[23]Wang Wanliang,Wang Haiyan,Zhao Yanwei,et al.Parallel Machine Scheduling with Splitting Jobs by a Hybrid Differential Evolution Algorithm[J].Conputers & Operations Research,2013,40(5):1196-1206.
[24]王海燕,赵燕伟,张立萍,等.基于混合DE的混排Flow-shop分批优化调度[J].计算机集成制造系统,2013,19(7):1613-1625.
Wang Haiyan,Zhao Yanwei,Zhang Liping,et al.Hybrid Differential Evolution Algorithm for Lot Streaming in Flow-shop with Intermingling[J].Computer Integrated Manufacturing Systems,2013,19(7):1613-1625.
[25]Zhao Yanwei,Wang Haiyan,Wang Wanliang,et al.New Hybrid Parallel Algorithm for Variable-sized Batch Splitting Scheduling with Alternative Machines in Job Shops[J].Chinese Journal of Mechanical Engineering,2010,23(4):484-495.
[26]Zhao Yanwei,Wang Haiyan,Xu Xinli,et al.A New Hybrid Parallel Algorithm for Consisitent-sized Bath Splitting Job Shop Scheduling on Alternative Machines with Forbidden Intervals[J].The International Journal of Advanced Manufacturing Technology,2010,48(9):1091-1105.
[27]武志峰,黄厚宽.自适应调整控制参数的差分演化算法[J].计算机工程与设计,2012,33(3):1175-1180.
Wu Zhifeng,Huang Houkuan.Self-adapting Control Parameters in Differential Evolution[J].Computer Engineering and Design, 2012,33(3):1175-1180.
[28]赵国凯.基于装配约束的机械产品生产调度算法研究[D].大连:大连理工大学,2009. |