Multi-objective Scheduling Optimization for Hybrid Flow Shops with Limited Waiting Time and High Energy Consumption
CHANG Daliang1, 2, 3, SHI Haibo1, 2, LIU Chang1, 2
China Mechanical Engineering . 2024, (07): 1269 -1278 .  DOI: 10.3969/j.issn.1004-132X.2024.07.015