SUN Aihong, SONG Yuchuan, YANG Yunfan, LEI Qi. Dual Resource-constrained Flexible Job Shop Scheduling Algorithm Considering Machining Quality of Key Jobs[J]. China Mechanical Engineering, 2022, 33(21): 2590-2600.
[1]MONDHER D, HOUSSEM E N, OLFA B D, et al. Dual-resource Constraints in Classical and Flexible Job Shop Problems:a State-of-the-art Review[J]. Procedia Computer Science, 2018, 126:1507-1515.
[2]GONG G, RAYMOND C, DENG Q, et al. A Hybrid Artificial Bee Colony Algorithm for Flexible Job Shop Scheduling with Worker Flexibility[J]. International Journal of Production Research, 2020, 58(14):167-178.
[3]DOMINIK K, DAVID M, JENNY N. A Worker Constrained Flexible Job Shop Scheduling Problem with Sequence-dependent Setup Times[J]. OR Spectrum, 2019, 41(1):179-217.
[4]GONG G, DENG Q, GONG X, et al. A New Double Flexible Job-shop Scheduling Problem Integrating Processing Time, Green Production, and Human Factor Indicators[J]. Journal of Cleaner Production, 2018, 174:560-576.
[5]WU X, PENG J, XIAO X, et al. An Effective Approach for the Dual-resource Flexible Job Shop Scheduling Problem Considering Loading and Unloading[J]. International Journal of Intelligent Manufacturing, 2021, 32:707-728.
[6]孔繁森, 高天宇, 李惠敏, 等. 考虑任务复杂性的人机联合任务分配问题研究[J]. 机械工程学报, 2021, 57(7):204-214.
KONG Fansen, GAO Tianyu, LI Huimin, et al. Research on Human-robot Joint Assignment Considering Task Complexity[J]. Journal of Mechanical Engineering, 2021, 57(7):204-214.
[7]王超, 黄波, 贾春兰, 等. 考虑加工质量和生产成本的柔性作业车间调度问题研究[J]. 机械, 2012, 39(12):10-14.
WANG Chao, HUANG Bo, JIA Chunlan,et al. Research on Flexible Job-shop Scheduling Problem Considering Production Cost and Product Quality[J]. Machinery, 2012, 39(12):10-14.
[8]朱光宇, 徐文婕. 考虑能耗与质量的机床构件生产线多目标柔性作业车间调度方法[J]. 控制与决策, 2019, 34(2):252-260.
ZHU Guangyu, XU Wenjie. Multi-objective Flexible Job Shop Scheduling Method for Machine Tool Component Production Line Considering Energy Consumption and Quality[J]. Control and Decision, 2019, 34(2):252-260.
[9]蒋增强, 左乐. 低碳策略下的多目标柔性作业车间调度[J]. 计算机集成制造系统, 2015, 21(4):1023-1031.
JIANG Zengqiang, ZUO Le. Multi-objective Flexible Job-shop Scheduling Based on Low-carbon Strategy[J]. Computer Integrated Manufacturing Systems, 2015, 21(4):1023- 1031.
[10]周亚勤, 杨长祺, 吕佑龙, 等. 双资源约束的航天结构件车间生产调度方法[J]. 机械工程学报, 2018, 54(9):55-63.
ZHOU Yaqin, YANG Changqi, LYU Youqiao, et al. Scheduling the Production of Aerospace Parts with Dual Resource Constraints[J]. Journal of Mechanical Engineering, 2018, 54(9):55-63.
[11]娄航宇, 张吉善, 赵云博. 基于扩展双资源约束型航空构件制造车间调度方法[J]. 计算机集成制造系统, 2020, 26(12):3329-3340.
LOU Hangyu, ZHANG Jishan, ZHAO Yunbo. Scheduling Method for Aerospace Components Production Shop Based on Extended Dual Resource Constraints[J]. Computer Intergrated Manufacturing Systems, 2020, 26(12):3329-3340.
[12]刘晓阳, 刘恩福, 靳江艳. 基于蚁群算法的异步并行装配序列规划方法[J]. 机械工程学报, 2019, 55(9):107-119.
LIU Xiaoyang, LIU Enfu, JIN Jiangyan. Asynchronous Parallel Assembly Sequence Planning Based on Ant Colony Algorithm[J]. Journal of Mechanical Engineering, 2019, 55(9):107-119.
[13]黄学文, 张晓彤, 艾亚晴. 基于蚁群算法的多加工路线柔性车间调度问题[J]. 计算机集成制造系统, 2018, 24(3):558-569.
HUANG Xuewen, ZHANG Xiaotong, AI Yaqing. ACO Integrated Approach for Solving Flexible Job Shop Scheduling with Multiple Process Plans[J]. Computer Intergrated Manufacturing Systems, 2018, 24(3):558-569.
[14]张洁, 秦威, 宋代立. 考虑工时不确定的混合流水车间滚动调度方法[J]. 机械工程学报, 2015, 51(11):99-108.
ZHANG Jie, QIN Wei, SONG Daili. Rescheduling Algorithm Based on Rolling Horizon Procedure for a Dynamic Hybrid Flow Shop with Uncertain Processing Time[J]. Journal of Mechanical Engineering, 2015, 51(11):99-108.
[15]MENG Leilei, ZHANG Chaoyong, ZHANG Biao, et al. Mathematical Modeling and Optimization of Energy-conscious Flexible Job Shop Scheduling Problem with Worker Flexibility[J]. IEEE Access, 2019, 7:68043-68059.
[16]李兢尧, 黄媛, 王军强. 基于压缩时窗的双资源约束作业车间调度策略[J]. 计算机集成制造系统, 2016, 22(12):2827-2835.
LI Jingyao, SUN Shudong, WANG Junqiang. Scheduling Strategy of Dual Resource Constrained Job Shop Based on Compressed Time Window[J]. Computer Intergrated Manufacturing Systems, 2016, 22(12):2827-2835.
[17]李兢尧, 孙树栋, 黄媛, 等. 基于时窗的双资源约束车间调度研究[J]. 机械工程学报, 2011, 47(16):150-159.
LI Jingyao, SUN Shudong, HUANG Yuan, et al. Research on Dual Resource Constrained Job Shop Scheduling Based on Time Window[J]. Journal of Mechanical Engineering, 2011, 47(16):150-159.
[18]BRANDIMARTE P. Routing and Scheduling in a Flexible Job Shop by Tabu Search[J]. Annals of Operations Research, 1993, 41(3):157-183.
[19]LEI D, GUO X. Variable Neighbourhood Search for Dual-resource Constrained Flexible Job Shop Scheduling[J]. International Journal of Production Research, 2014, 52(9):2519-2529.