| [1] |
LI Tao, DENG Linhui, MO Bin, SHI Feifan, LIU Weiwei.
Prediction of Cracks and Optimization of Processing Parameters in Laser Cladding of Ni60 Based on HGA-ACO-RFA
[J]. China Mechanical Engineering, 2025, 36(06): 1322-1328,1337.
|
| [2] |
LI Yiren1, 2, WANG Bailin1, 2, YUAN Shuaipeng1, 2, LI Tieke1, 2, WANG Yang1, 2.
An Improved Ant Colony Algorithm for Cast Plan Considering Online-width-adjustment Technology of Crystallizers
[J]. China Mechanical Engineering, 2025, 36(03): 614-622,633.
|
| [3] |
WEI Guangyan, YE Chunming.
Research on Distributed and Multi-flexible Assembly Job-shop Scheduling Problems
[J]. China Mechanical Engineering, 2023, 34(20): 2442-2455.
|
| [4] |
ZHANG Weicun, GU Hongyu.
Job-shop Scheduling Problems Considering Similar Learning Effect in One-worker and Multiple-machine Partterns
[J]. China Mechanical Engineering, 2023, 34(14): 1701-1709.
|
| [5] |
SUN Aihong, SONG Yuchuan, YANG Yunfan, LEI Qi.
Dual Resource-constrained Flexible Job Shop Scheduling Algorithm Considering Machining Quality of Key Jobs
[J]. China Mechanical Engineering, 2022, 33(21): 2590-2600.
|
| [6] |
LU Hao, CHEN Yang, WU Huaiyu, CHENG Lei, .
Path Planning of Substation Inspection Robot under Road Network and Measurement Constraints
[J]. China Mechanical Engineering, 2021, 32(16): 1972-1982.
|
| [7] |
GU Yong, YUAN Yuanyi, ZHANG Lie, DUAN Jingjing.
Multi-depot Half Open Vehicle Routing Problem with Time Windows
[J]. China Mechanical Engineering, 2020, 31(14): 1733-1740.
|
| [8] |
LI Yibing1,2;HUANG Weixing1;WU Rui1.
Research on Multi-objective Green Flexible Job-shop Scheduling Based on Improved ABC Algorithm
[J]. China Mechanical Engineering, 2020, 31(11): 1344-1350,1385.
|
| [9] |
QIAO Dongping, PEI Jie, WEN Xiaoyu, XIAO Yanqiu, JIAO Jianqiang, .
An Improved Ant Colony Algorithm for Solving Single Machine Total Weighted Delay Scheduling Problem
[J]. China Mechanical Engineering, 2018, 29(22): 2703-2710.
|
| [10] |
YANG Yu;HUANG Min;WANG Zhenyu;ZHU Qibing.
Solving Bi-objective FJSP Using Limited Stable Matching Strategy
[J]. China Mechanical Engineering, 2018, 29(14): 1743-1750.
|
| [11] |
ZHU Chuanjun, QIU Wen, ZHANG Chaoyong, JIN Liangliang.
Multi-objective Flexible Job Shop Dynamic Scheduling Strategy Aiming at Scheduling Stability and Robustness
[J]. China Mechanical Engineering, 2017, 28(02): 173-182.
|
| [12] |
Zhang Tie, Su Jiewen.
Path Sorting Optimization of Robotic End-effector by Improved ACA
[J]. China Mechanical Engineering, 2016, 27(19): 2624-2629.
|
| [13] |
Huang Fengli, Gu Jinmei, Zhang Libing, Xu Chunguang, Wang Haiyan.
Ant Colony Optimization of STEP-NC Process Route Based on Dynamic Update of Taboo Manufacturing Features
[J]. China Mechanical Engineering, 2016, 27(05): 596-602.
|
| [14] |
Wu Changyou, Dai Ning, Liu Hao, Chen Xiaosheng, Li Dawei, Shen Zhenhong, Sun Dengguang.
Fractal Tool Path Connection Technology Based on Improved Ant Colony Algorithm
[J]. China Mechanical Engineering, 2016, 27(01): 58-65.
|
| [15] |
Xie Zhijiang, Liang Huan, Song Daiping.
Forward Kinematics of 3-RPS Parallel Mechanism Based on a Continuous Ant Colony Algorithm
[J]. China Mechanical Engineering, 2015, 26(6): 799-803.
|