[1]王焱金,张建广,马昭.综掘装备技术研究现状及发展趋势[J].煤炭科学技术,2015,43(11):87-90.
WANG Yanjin,ZHANG Jianguang,MA Zhao.Research Status and Development Tendency of Mine Fully-mechanized Heading Equipment Technology[J].Coal Science and Technology,2015,43(11):87-90.
[2]惠兴田,刘甲翔,苏小卫.煤巷施工工艺与综掘结构优化方案[J].煤炭技术,2018(2):15-18.
HUI Xingtian,LIU Jiaxiang,SU Xiaowei.Coal Road Construction Technology and Comprehensive Structure Optimization Scheme[J].Coal Technology,2018(2):15-18.
[3]曹飞飞.岩巷快速掘进优化设计及应用[D].邯郸:河北工程大学,2014.
CAO Feifei.Optimization Design and Application of Rapid Excavation in Rock Roadway[D].Handan:Hebei University of Engineering,2014.
[4]周廷美,蓝悦明.机械零件与系统优化设计建模及应用[M].北京:化学工业出版社,2005:12-28.
ZHOU Yanmei,LAN Yueming.Modeling and Application of Mechanical Parts and System Optimization Design[M].Beijing:Chemical Industry Press,2005:12-28.
[5]肖晓伟,肖迪,林锦国,等.多目标优化问题的研究概述[J].计算机应用研究,2011,28(3):805-808.
XIAO Xiaowei,XIAO Di,LIN Jinguo,et al.Overview of Research on Multi-objective Optimization Problems[J].Application Research of Computers,2011,28(3):805-808.
[6]彭先勇,陆中良,李受人,等.ANSYS Workbench的液压油缸多目标优化设计[J].湖北工业大学学报,2011,26(4):79-81.
PENG Xianyong,LU Zhongliang,LI Shouren,et al.Multi-objective Optimization Design of Hydraulic Cylinder of ANSYS Workbench[J].Journal of Hubei University of Technology,2011,26(4):79-81.
[7]林崇德.层状岩石顶板破坏机理数值模拟过程分析[J].岩石力学与工程学报,1999,18(4):392-396.
LIN Chongde.Numerical Simulation Process Analysis of Failure Mechanism of Layered Rock Roof[J].Chinese Journal of Rock Mechanics and Engineering,1999,18(4):392-396.
[8]卢进南.综掘巷道迈步式超前支护系统力学特性研究[D].阜新:辽宁工程技术大学,2014.
LU Jinnan.Research on Mechanical Properties of Stepping-type Advanced Supporting System on Fully Mechanized Tunnelling[D].Fuxin:Liaoning Technology University,2014.
[9]谢苗,刘治翔,卢进南,等.超前支架相似实验样机研制及其与顶板耦合力学实验[J].煤炭学报,2017,42(5):1319-1324.
XIE Miao,LIU Zhixiang,LU Jinnan,et al.Development of Similar Experimental Prototype of the Advanced Support and the Experimental Study on Its Coupling Mechanics with Roof[J].Journal of China Coal Society,2017,42(5):1319-1324. |