[1]Johnson R V.Spacecraft for Multi-floor Layout Pla-nning[J]. Management Science,1982,28(2):407-417.
[2]Izadinia N,Eshghi K,Solmani M H.A Robust Mo-del for Multi-floor Layout Problem[J].Computers & Industrial Engineering,2014,78(12):127-134.
[3]Bernardi S,Anjos M F.A Two-stage Mathematical-programming Method for the Multi-floor Facility Layout Problem[J].Journal of the Operational Research Society,2013,64(3):352-364.
[4]封海波.上海都市型工业空间组织探讨[J].城市研究,2014(6):129-133.
Feng Haibo.Discussion on Urban Industrial Space Organizations of Shanghai[J].City Study, 2014(6):129-133.
[5]王磊,付建荣.美国都市工业的空间分布及其对中国城市发展的启示[J].经济地理,2014,34(8):81-88.
Wang Lei, Fu Jianrong.The Spatial Distribution of Urban Manufacturing Industries in the United
States and Its Implications for Urban Development in China[J].Economic Geography, 2014,34(8):81-88.
[6]Spath D,Lentes J.Urban Production to Advance the Competitiveness of Industrial Enterprises[C]// Challenges for Sustainable Operations.International Conference on Production Research.Iguassu Falls,2013:1-5.
[7]Meng G,Heragu S S,Zijm H.Reconfigurable Layout Problem[J].International Journal Production Research,2004,42(22):4709-472.
[8]金哲,宋执环,杨将新.可重构制造系统工艺路线与系统布局设计研究[J].计算机集成制造系统,2007,13(1):7-12.
Jin Zhe, Song Zhihuan, Yang Jiangxin. Process Route and Layout Design Method for Reconf-igurable Manufacturing Systems[J].Computer Integrated Manufacturing Systems,2007,13(1):7-12.
[9]Bozer Y A,Meller R D,Erlebacher S J.An Improvement-type Layout Algorithm for Single and Multiple-floor Facilities[J].Management Science,1994,40(7):918-932.
[10]Matsuzaki K, Irohara T, Yoshimoto K.Heuristic Algorithm to Solve the Multi-floor Layout Problem with the Consideration of Elevator Utilization[J].Computers & Industrial Engineering,1999,36(2):487-502.
[11]ahin R, Ertoral K, Türkbey O.A Simulated Annealing Heuristic for the Dynamic Layout Problem with Budget Constraint[J].Computers & Industrial Engineering,2010,59(2):308-313.
[12]Ghadikolaei Y K, Shahanaghi K, Ghadikolaei Y K, et al. Multi-floor Dynamic Facility Layout: A Simulated Annealing-based Solution[J]. International Journal of Operational Research, 2013, 16(4):375-389.
[13]Aiello G, Scalia G L, Enea M. A Non Dominated Ranking Multi Objective Genetic Algorithm and Electre Method for Unequal Area Facility Layout Problems[J].Expert Systems with Applications,2013, 40(12):4812-4819.
[14]Pourvaziri H, Naderi B, Pourvaziri H, et al. A Hybrid Multi-population Genetic Algorithm for the Dynamic Facility Layout Problem[J]. Applied Soft Computing, 2014, 24(24):457-469.
[15]Scholz D, Petrick A, Domschke W. STaTS: A Sl-icing Tree and Tabu Search Based Heuristic for the Unequal Area Facility Layout Problem[J]. European Journal of Operational Research, 2009, 197(1):166-178.
[16]刘琼,许金辉,张超勇.基于改进蛙跳算法的鲁棒性车间布局[J].计算机集成制造系统,2014, 20(8):1879-1886.
Liu Qiong,Xu Jinhui,Zhang Chaoyong.Robust Layout of Floor Shop Based on Improved Shuffled Frog Leaping Algorithm[J].Computer Integrated Manufacturing Systems,2014,20(8):1879-1886.
[17]Samarghandi H,Taabayan P, Jahantigh F F.A Par-ticle Swarm Optimization for the Single Row Facility Layout Problem[J]. Cpmputer & Industrial Engineering ,2010,58(4):529-534.
[18]武志军,宁汝新,王爱民.可重构制造系统布局规划方案的灰色模糊综合评价方法[J].中国机械工程,2007,18(19):2313-2318.
Wu Zhijun,Ning Ruxin,Wang Aimin.Grey Fuzzy Synthetically Evaluation Method for RMS Layout Planning[J].China Mechanical Engineering, 2007,18(19):2313-2318.
[19]García-Hernández L, Palomo-Romero J M, Salas-Morera L, et al. A Novel Hybrid Evolutionary Approach for Capturing Decision Maker Knowledge into the Unequal Area Facility Layout Problem[J].Expert Systems with Applications, 2015, 42(10):4697-4708.
[20]李彤, 王春峰, 王文波, 等.求解整数规划的一种仿生类全局优化算法[J].系统工程理论与实践,2005,25(1):76-85.
Li Tong, Wang Chunfeng, Wang Wenbo, et al.A Global Optimization Bionics Algorithm for Solving Integer Programming-plant Growth Simulation Algorithm[J].System Engineering Theory and Practice,2005,25(1):76-85.
[21]李彤,王众托. 模拟植物生长算法与知识创新的几点思考[J].管理科学学报,2010,13(3):87-96.
Li Tong, Wang Zhongtuo.Plant Growth Simulation Algorithm and the Thinking in Knowledge Innovation[J]. Journal of Management Sciences in China, 2010,13(3):87-96.
[22]王淳,程浩忠. 基于模拟植物生长算法的配电网重构[J].中国电机工程学报,2007,27(9):50-55.
Wang Chun,Cheng Haozhong.Reconfiguration of Distribution Network Based on Plant Growth Simulation Algorithm[J]. Proceedings of the CSEE, 2007,27(9):50-55.
[23]李彤,王众托.模拟植物生长算法在设施选址问题中的应用[J].系统工程理论与实践,2008,28(12):107-115.
Li Tong, Wang Zhongtuo.Application of Plant Growth Simulation Algorithm on Solving Facility Location Problem[J]. System Engineering Theory and Practice, 2008,28(12):107-115.
[24]李彤,王众托. 大型城市地下物流网络优化布局的模拟植物生长算法[J].系统工程理论与实践,2013,33(4):971-980.
Li Tong, Wang Zhongtuo.Optimization Layout of underground Logistics Network in Big Cities with Plant Growth Simulation Algorithm[J]. System Engineering Theory and Practice, 2013,33(4):971-980.
|