[1]苏学贵.特厚复合顶板巷道支护结构与围岩稳定的耦合控制理论[D]. 太原:太原理工大学, 2013.
[2]濮洪九,经天亮,姜智敏,等.煤炭工业重大采掘生产领域装备技术政策研究[C]//中国煤炭经济研究(2005-2008).下册.北京,2009:955-980.
[3]王虹.中国综合机械化掘进技术发展40年[J].煤炭学报,2010,35(11):515-520.
Wang Hong.The 40 Years Developmental Review of the Fully Mechanized Mine Roadway Heading Technology in China[J]. Journal of China Coal Society,2010,35(11):515-520.
[4]陶永华.新型PID控制及其应用[M].北京:机械工业出版社,2000.
[5]王述彦,师宇,冯忠绪.基于模糊PID控制器的控制方法研究[J].机械科学与技术,2011,30(1):166-172.
Wang Shuyan,Shi Yu,Feng Zhongxu. A Method for Controlling a Loading System Based on a Fuzzy PID Controller[J]. Mechanical Science and Technology for Aerospace Engineering, 2011,30(1):166-172.
[6]徐二宝,彭天好,陈晓强,等. 基于AMESim的采煤机滚筒调高电液比例控制系统仿真分析[J].机床与液压,2013,41(11):149-151.
Xu Erbao, Peng Tianhao, Chen Xiaoqiang, et al. Simulation Analysis of Electro-hydraulic Proportional Control System of Shearer Drum Lifting Based on AMESim[J]. Machine Tool & Hydraulics, 2013,41(11):149-151.
[7]王春行.液压控制系统[M].北京:机械工业出版社,1999.
[8]肖晟,强宝民.基于对称四通阀控非对称液压缸的电液比位置控制系统建模与仿真[J].机床与液压,2009,37(6):95-101.
Xiao Sheng, Qiang Baomin. The Model and Simulation of Electro-hydraulic Proportional Positioircontrol System Based on A symmetrical Hydraulic Cylinder Controlled by Symmetrical Four-way Valve[J]. Machine Tool & Hydraulics,2009,37(6):95-101.
[9]黎啟柏.电液比例控制与数宇控制系统[M].北京:机械工业出版社,1997.
[10]孙康,吴欣,司玉校,等.基于体积增量均匀释放原则的卸荷规律研究[J].锻压技术,2014,39(6):75-80.
Sun Kang, Wu Xin, Si Yuxiao, et al. Research on Unloading Rules Based on Volume Increment Uniform Release[J].Forging & Stamping Technology,2014,39(6):75-80.
[11]付永领,祁晓野. AMESim系统建模和仿真——从入门到精通[M].北京:北京航空航天大学出版社,2006.
[12]赵文祥,严世榕. 基于AMESim的轮式装载机工作装置建模与仿真研究[J]. 机床与液压,2014,42(1):121-127.
Zhao Wenxiang, Yan Shirong. Modeling and Simulation for Wheel Loader’s Working Device Based on AMESim[J]. Machinetool & Hydraulics, 2014, 42(1):121-127.
[13]刘宝龙,廉自生.基于AMESIM的液压支架移架速度研究[J]. 科学之友,2010(4):1-3.
Liu BaoLong, Lian Zisheng. Study on the Speed of Hydraulic Support Movement Based on AMESim[J]. Friend of Science Amatcurs, 2010(4): 1-3. |