[1]Joshi S.Product Environmental Life-cycle Assess-ment Using Input-output Techniques[J].Journalof Industrial Ecology,2000,3(2/3):95-120.
[2]Zhang H C,Li H.An Energy Factor Based System-atic Approach to Energy-saving Product Design[J].Annals of the CIRP,2010,59(1):183-186.
[3]Moore K E,Gungor A,Gupta S M.Petri Net Ap-proach to Disassembly Process Planning for Prod-ucts with Complex AND/OR Precedence Relation-ships[J].European Journal of Operational Re-search,2001,135:428-449.
[4]Gu P,Sosale S.Product Modularization for Life Cy-cle Engineering[J].Robotics and Computer-inte-grated Manufactrring,1999,15(5):387-401.
[5]Kuo T C,Wu H H,Shieh J I.Integration of Envi-ronmental Considerations in Quality Function De-ployment by Using Fuzzy Logic[J].Expert Systemswith Application,2009,36:7148-7156.
[6]Stiassniea E,Shpitalni M.Incorporating LifecycleConsiderations in Axiomatic Design[J].Annals ofthe CIRP,2007,56(1):1-4.
[7]李方义,刘钢.模糊AHP方法在产品绿色模块化设计中的应用[J].中国机械工程,2000,11(9):997-1000.
[8]黄海鸿[1],刘志峰[1],刘光复[1],王淑旺[1].产品环境价值分析方法与应用[J].计算机辅助设计与图形学学报,2006,18(6):767-773.
[9]周康渠 [1],韩晓刚 [2],朱晓红 [3],刘飞 [3].基于客户满意的产品定制模型研究[J].计算机集成制造系统,2004,10(11):1338-1342.
[10]陈守煜著.工程模糊集理论与应用[M],1998:221.
[11]Brown D.Defining Configuring[J].Artificial Intel-ligent for Engineering Design,Analysis and Manu-facturing,1998,12(4):301-306.
[12]Hegge H M H,Wortmann J C.Generic Bill-of-material:a New Product Model[J].International Journal of Production Economics,1991,23(1/3):117-128.
[13]Keijiro Masui.Applying Quality Function Deploy-ment to Environmentally Conscious Design[J].In-ternational Journal of Quality&Reliability Man-agement,2003,20(1):90-106.
[14]The Fraser Institute.IPCC Fourth Assessment Report[EB/OL].(2007-02-15).http://www.ipcc.ch/ipccreports/ar4-wg1.htm.
[15]Bosch M E,Hellweg S,Huijbregts M A J,et al.Applying Cumulative Exergy Demand(CExD)In-dicators to Ecoinvent Database[J].LCA Methodol-ogy,2007,12(3):181-190. |