[1]梅启智,廖炯生,孙惠中.系统可靠性工程基础[M].北京:科学出版社,1992:446-460.
MEI Qizhi, LIAO Jiongsheng, SUN Huizhong. System Reliability Engineering Fundamentals [M]. Beijing: Science Press, 1992:446-460.
[2]BONA G D, FORCINA A. Analytic Critical Flow Method (ACFM): a Reliability Allocation Method Based on Analytic Hierarchy Process [J]. Journal of Failure Analysis & Prevention, 2017,17(6):1149-1163.
[3]FELICE F D, BONA G D, FALCONE D, et al. New Reliability Allocation Methodology: the Integrated Factors Method [J]. International Journal of Operations & Quantitative Management, 2010, 16(1):67-85.
[4]杜丽, 黄洪钟, 宋巍. 采用多级模糊评价的柴油机可靠性分配[J]. 机械设计与研究,2009,25(1):107-110.
DU Li, HUANG Hongzhong, SONG Wei. Reliability Allocation Based on Multi-stage Fuzzy Evaluation Method[J]. Mechanical Design and Research. 2009,25(1):107-110.
[5]周新建,李志强. 基于故障维修数据的兆瓦级永磁直驱风力发电机可靠性分配[J]. 煤矿机械,2016, 37(9):84-87.
ZHOU Xinjian, LI Zhiqiang. Reliability Allocation of MW Scale Permanent Magnet Direct-drive Wind Power Generator Based on Failure Maintenance Date[J]. Coal Mining Machinery, 2016,37(9):84-87.
[6]谢静,范文正,谢镇波. 某型军用发动机使用可靠性评估[J]. 航空发动机,2012,38(6):43-47.
XIE Jing, FAN Wenzheng, XIE Zhenbo.Evaluation of the Service Ability of a Military Engine[J]. Aeroengine, 2012,38(6):43-47.
[7]SAATY T L. How to Make a Decision: the Analytic Hierarchy Process[J]. European Journal of Operational Research, 1994, 48(1):9-26.
[8]邓雪, 李家铭, 曾浩健,等. 层次分析法权重计算方法分析及其应用研究[J]. 数学的实践与认识,2012, 42(7):93-100.
DENG Xue, LI Jiaming, ZENG Haojian,et al. Analytic Hierarchy Process Weight Calculation Method Analysis and Application Research [J]. Mathematics Practice and Understanding, 2012,42(7): 93-100. |