[1]刘飞, 王秋莲, 刘高君. 机械加工系统能量效率研究的内容体系及发展趋势[J]. 机械工程学报, 2013,49(19):87-94.
LIU Fei, WANG Qiulian, LIU Gaojun. Content Architecture and Future Trends of Energy Efficiency Research on Machining Systems[J]. Journal of Mechanical Engineering, 2013, 49(19):87-94.
[2]MOUZON G, YILDIRIM M B, TWOMEY J. Operational Methods for Minimization of Energy Consumption of Manufacturing Equipment[J]. International Journal of Production Research, 2007,45(18/19):4247-4271.
[3]GUTOWSKI T G, BRANHAM M S, DAHMUS J B, et al. Thermodynamic Analysis of Resources Used in Manufacturing Processes[J]. Environmental Science & Technology, 2009,43(5):1584-1590.
[4]李作成, 钱斌, 胡蓉, 等. 求解一类异构并行机调度问题的分布估计算法[J]. 计算机集成制造系统, 2013,19(9):2202-2212.
LI Zuocheng, QIAN Bin, HU Rong, et al. Estimation of Distribution Algorithm for a Kind of Heterogeneous Parallel Machine Scheduling Problem[J]. Computer Integrated Manufacturing Systems, 2013, 19(9):2202-2212.
[5]吴楚格, 王凌, 郑晓龙. 求解不相关并行机调度的一种自适应分布估计算法[J]. 控制与决策, 2016,31(12):2177-2182.
WU Chuge, WANG Ling, ZHENG Xiaolong. An Adaptive Estimation of Distribution Algorithm for Solving the Unrelated Parallel Machine Scheduling[J]. Control and Decision, 2016, 31(12): 2177-2182.
[6]肖晶, 张灿荣, 郑力. 基于数学规划的平行机批量调度固定优化算法[J]. 清华大学学报(自然科学版), 2012,52(4):436-441.
XIAO Jing, ZHANG Canrong, ZHENG Li. MIP Based Fix-and-optimize Algorithm for Parallel Machine Lot Sizing and Scheduling[J]. Journal of Tsinghua University(Sci. and Tech.), 2012,52(4): 436-441.
[7]CHE A, WU X, PENG J, et al. Energy-efficient Bi-objective Single-machine Scheduling with Power-down Mechanism[J]. Computers & Operations Research, 2017,85:172-183.
[8]LIANG P, YANG H, LIU G, et al. An Ant Optimization Model for Unrelated Parallel Machine Scheduling with Energy Consumption and Total Tardiness[J]. Mathematical Problems in Engineering, 2015,2015:1-8.
[9]DING J, SONG S, ZHANG R, et al. Parallel Machine Scheduling under Time-of-use Electricity Prices: New Models and Optimization Approaches[J]. IEEE Transactions on Automation Science and Engineering, 2016,13(2):1138-1154.
[10]CHE A, ZHANG S, WU X. Energy-conscious Unrelated Parallel Machine Scheduling under Time-of-use Electricity Tariffs[J]. Journal of Cleaner Production, 2017,156:688-697.
[11]TANG L, REN H, YANG Y. Reheat Furnace Scheduling with Energy Consideration[J]. International Journal of Production Research, 2014,53(6):1642-1660.
[12]LI Z, YANG H, ZHANG S, et al. Unrelated Parallel Machine Scheduling Problem with Energy and Tardiness Cost[J]. The International Journal of Advanced Manufacturing Technology, 2016,84(1/4):213-226.
[13]JIA Z, ZHANG Y, LEUNG J Y T, et al. Bi-criteria Ant Colony Optimization Algorithm for Minimizing Makespan and Energy Consumption on Parallel Batch Machines[J]. Applied Soft Computing, 2017,55:226-237.
[14]ZHENG X, WANG L. A Collaborative Multiobjective Fruit Fly Optimization Algorithm for the Resource Constrained Unrelated Parallel Machine Green Scheduling Problem[J]. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2018,48(5):790-800.
[15]WU X, CHE A. A Memetic Differential Evolution Algorithm for Energy-efficient Parallel Machine Scheduling[J]. Omega, 2018, 82:1-11.
[16]VALLADA E, RUIZ R. A Genetic Algorithm for the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times[J]. European Journal of Operational Research, 2011,211(3):612-622.
[17]TAVAKKOLI-MOGHADDAM R, TAHERI F, BAZZAZI M, et al. Design of a Genetic Algorithm for Bi-objective Unrelated Parallel Machines Scheduling with Sequence-dependent Setup Times and Precedence Constraints[J]. Computers & Operations Research, 2009,36(12):3224-3230.
[18]NADERI B, GOHARI S, YAZDANI M. Hybrid Flexible Flowshop Problems: Models and Solution Methods[J]. Applied Mathematical Modelling, 2014,38(24):5767-5780.
[19]GHAREHGOZLI A H, TAVAKKOLI-MOGH-ADDAM R, ZAERPOUR N. A Fuzzy-mixed-integer Goal Programming Model for a Parallel-machine Scheduling Problem with Sequence-dependent Setup Times and Release Dates[J]. 2009, 25(4):853-859.
[20]WAGNER H M. An Integer Linear-programming Model for Machine Scheduling[J]. Naval Research Logistics Quarterly, 1959,6(2):131-140.
[21]PAN C. A Study of Integer Programming Formulations for Scheduling Problems[J]. International Journal of Systems Science, 1997,28(1):33-41. |