[1]Rostami J, Ozdemir L, Nilsen B. Comparison between CSM and NTH Hard Rock TBM Performance Prediction Models[C]//Proceedings of Annual Technical Meeting of the Institute of Shaft Drilling Technology. Las Vegas, 1996: 1-10.
[2]Wang Lihui, Kang Yilan, Cai Zongxi, et al. The Energy Method to Predict Disc Cutter Wear Extent for Hard Rock TBMs[J]. Tunnelling and Underground Space Technology, 2012, 28: 183-191.
[3]张明富, 袁大军, 黄清飞, 等. 砂卵石地层盾构刀具动态磨损分析[J]. 岩石力学与工程学报, 2008, 27(2): 397-402.
Zhang Mingfu, Yuan Dajun, Huang Qingfei, et al. Analysis of Dynamic Abrasion of Shield Cutters in Sandy Cobble Stratum[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(2): 397-402.
[4]李笑, 苏小江. 基于Elman神经网络的盾构滚刀磨损预测方法研究[J]. 辽宁工程技术大学学报(自然科学版), 2010, 29(6): 1121-1124.
Li Xiao, Su Xiaojiang. A New Method for Forecasting Shield’s Disc-cutters Wearing Based on Elman Neural Network[J]. Journal of Liaoning Technical University(Natural Science), 2010, 29(6): 1121-1124.
[5]Yagiz S. AModel for the Prediction of Tunnel Boring Machine Performance[C]//10th Congress of the International Association for Engineering Geology and the Environment. Nottingham, 2006: 793-809.
[6]Cho Jung-Woo, Jeon Seokown, Yu Sang-Hwa, et al. Optimum Spacing of TBM Disc Cutters:A Numerical Simulation Using the Three-dimensional Dynamic Fracturing Method[J]. Tunnelling and Underground Space Technology, 2010, 25(3): 230-244.
[7]Acaroglu O, Ozdemir L, Asbury B. A Fuzzy Logic Model to Predict Specific Energy Requirement for TBM Performance Prediction[J]. Tunnelling and Underground Space Technology, 2008, 23(5): 600-608.
[8]Gertsch R, Gertsch L, Rostami J. Disc Cutting Tests in Colorado Red Granite: Implications for TBM Performance Prediction[J]. International Journal of Rock Mechanics & Mining Sciences, 2007, 44(2): 238-246.
[9]Gong Q M, Zhao J. Development of a Rock Mass Characteristics Model for TBM Penetration Rate Prediction[J]. International Journal of Rock Mechanics & Mining Sciences, 2009, 46(1): 8-18.
[10]刘明月. 秦岭隧道全断面掘进机掘进状况识别分析研究[D]. 成都:西南交通大学,2002. |