[1]卢进南,毛君,谢苗,等.巷道超前支架全支撑态动力学模型[J].煤炭学报,2015,40(1):50-57.
LU Jinnan, MAO Jun, XIE Miao, et al.Dynamics Model of Advanced Powered Support in Heading under Full Support Situation[J].Journal of China Coal Society,2015,40(1):50-57.
[2]李石林,冯涛,朱卓慧.“煤体-支柱(架)-胶结体”联合作用下顶板超静定梁模型[J].煤炭学报,2013,38(10):1735-1741.
LI Shilin, FENG Tao, ZHU Zhuohui. Mechanical Model of Statically Indeterminate Beam of Roof under the Combined Action of Coal Body,Pillar (Support) and Cemented Fill[J].Journal of China Coal Society, 2013,38(10):1735-1741.
[3]顾大钊,颜永国,张勇,等.煤矿地下水库煤柱动力响应与稳定性分析[J].煤炭学报,2016,41(7):1589-1597
GU Dazhao, YAN Yongguo, ZHANG Yong, et al.Experimental Study and Numerical Simulation for Dynamic Response of Coal Pillars in Coal Mine Underground Reservoir[J].Journal of China Coal Society, 2016,41(7):1589-1597.
[4]栾丽君, 姚立泽, 齐建峰,等. 自移式掘进机辅助支护设备立柱力学分析[J].辽宁工程技术大学学报(自然科学版),2013,32(4):527-530.
LUAN Lijun, YAO Lize, QI Jianfeng, et al. Column Mechanics Analysis of Self-motion Assistanced Powered Support Equipment for Tunneling Machine[J]. Journal of Liaoning Technical University(Natural Science), 2013,32(4):527-530.
[5]栾丽君, 任金萍, 卢景文.巷道用自移式辅助支护设备顶梁的优化及有限元分析[J].煤矿机械,2010,31(3):93-94.
LUAN Lijun, REN Jinping, LU Jingwen. Optimization and Finite Element Analysis of Self-motion Assitanced Powered Support Equipment for Roadway[J]. Coal Mine Machinery, 2010,31(3): 93-94.
[6]谢苗,刘治翔,毛君,等.迈步式超前支护系统设计与支护特性研究[J].机械强度,2016,38(2):302-310.
XIE Miao, LIU Zhixiang, MAO Jun,et al. Design on Step-type Advanced Supporting System and Research on the Support Characteristics [J].Journal of Mechanical Strength, 2016,38(2): 302-310.
[7]毛君,郑广辉,谢苗,等.模糊PID的超前时支护装备支撑力自动控制系统[J].智能系统学报,2015,10(5):762-768.
MAO Jun, ZHENG Guanghui, XIE Miao, et al. Support Force Automatic Control System of Advanced Supporting Equipment Based on Fuzzy-PID [J]. CAAI Transactions on Intelligent Systems, 2015,10(5):56-60.
[8]谢苗,刘治翔,鲁启通,等.超前支架迈步过程稳定控制方法研究[J].中国安全科学学报,2015,25(3):54-59.
XIE Miao,LIU Zhixiang,LU Qitong,et al. Study on Method for Controlling Stability of Advanced Support in Step Process[J].China Safety Science Journal,2015,25(3):54-59.
[9]谢苗,刘治翔,池城,等.巷道超前支架的电液伺服位置压力复合控制方法[J].中国机械工程,2016,27(2):1-7.
XIE Miao,LIU Zhixiang,CHI Cheng,et al. Electro-hydraulic Servo Position and Pressure Hybrid Control Method of Forepoling System on Tunnelling[J]. China Mechanical Engineering,2016,27(2):239-245.
[10]谢苗,刘治翔,毛君.综掘巷道超前支护装备多缸同步控制方法研究[J].工程设计学报,2015,22(2):193-200.
XIE Miao,LIU Zhixiang,MAO Jun. Multi-cylinder Synchronous Control Method for Advanced Support of Roadway Support Equipment[J]. Chinese Journal of Engineering Design,2015,22(2):193-200.
[11]谢苗,白雅静,毛君,等.不同工况下超前支护装备的模态分析[J].工程设计学报,2015,22(3):236-242.
XIE Miao,BAI Yajing,MAO Jun,et al. Modal Analysis of Supporting in Advance Equipment under Different Working Conditions[J]. Chinese Journal of Engineering Design,2015,22(3):236-242.
[12]卢进南,谢苗,毛君. 一种综掘巷道临时支护力学特性及振动特性研究[J]. 机械强度,2016,38(3):435-441.
LU Jinnan, XIE Miao, MAO Jun. Study on Mechanical Characteristics and Vibration Characteristics of Temporary Support Equipment in Fully Mechanized Mining Tunnel [J].Journal of Mechanical Strength, 2016,38(3):435-441.
[13]陈喆.基于相似理论和模型试验的结构动响应分析[D].南京:南京航空航天大学,2012.
CHEN Zhe. Structural Response Analysis Based on Similarity Theory and Model Test[D].Nanjing:Nanjing University of Aeronautics and Astronautics,2012. |