[1]罗晨,朱利民,丁汉. 夹具定位分析模型的统计特征及相对误差分析[J]. 机械工程学报,2013,49(5):110-115.
Juo Chen, Zhu Limin, Ding Han. Statistical Characteristic and Relative Error among Fixturing Analysis Models[J]. Journal of Mechanical Engineering, 2013,49(5):110-115.
[2]彭贺明, 吴玉光. 基于工序要求的夹具定位方案规划软件[J]. 计算机集成制造系统, 2013,19(7):1606-1612.
Peng Heming, Wu Yuguang. Location Planning Software of Fixture Based on Process Requirements[J]. Computer Integrated Manufacturing Systems, 2013,19(7):1606-1612.
[3]秦国华,叶海潮,崔跃,等. 面向计算机辅助夹具设计的修订式定位方案设计算法[J]. 计算机集成制造系统,2012,18(10):2145-2150.
Qin Guohua, Ye Haichao, Cui Yue, et al. Computer Aided Fixture Design Oriented Modified Design Algorithm for Fixture Locating Scheme[J]. Computer Integrated Manufacturing Systems, 2012,18(10): 2145-2150.
[4]黄健求. 机械制造技术基础[M]. 北京:机械工业出版社,2008.
[5]张芳兰, 杨明朗,刘卫东. 基于模糊TOPSIS方法的汽车形态设计方案评价[J]. 计算机集成制造系统,2014,20(2):276-283.
Zhang Fanglan, Yang Minglang, Liu Weidong. Evaluation of Automobile Form Design Based on Fuzzy TOPSIS[J]. Computer Integrated Manufacturing Systems, 2014,20(2):276-283.
[6]张莉,殷国富,赵秀粉,等. 基于AHP-FCE的远程协同分析系统动态联盟盟员智能决策技术[J]. 武汉理工大学学报(交通科学与工程版),2010,34(2):418-421.
Zhang Li, Yin Guofu, Zhao Xiufen, et al. Intelligent Decision Technology of Dynamic Alliance Leaguer for Remote Collaborative Anaysis System Based on AHP-FCE[J]. Journal of Wuhan University of Technology (Transportation Science & Engineering),2010,34(2):418-421.
[7]王新民,秦健春,张钦礼,等.基于AHP-TOPSIS评判模型的姑山驻留矿采矿方法优选[J]. 中南大学学报(自然科学版),2013,44(3):1131-1137.
Wang Xinmin, Qin Jianchun, Zhang Qinli,et al. Mining Method Optimization of Gu Mountain Stay are Based on AHPTOPSIS Evaluation Model[J]. Journal of Central South University (Science and Technology), 2013,44(3):1131-1137.
[8]李彦斌, 于心怡, 王致杰. 采用灰色关联度与TOPSIS法的光伏发电项目风险评价研究[J]. 电网技术,2013,37(6):1514-1519.
Li Yanbin, Yu Xinyi, Wang Zhijie. Risk Assessment on Photovoltaic Power Generation Project by Grey Correlation Analysis and TOPSIS Method[J]. Power System Technology, 2013,37(6):1514-1519.
|