[1]徐滨士.再制造工程基础及其应用[M].哈尔滨:哈尔滨工业大学出版社,2005.
[2]Donna M, Thurston D L. Incorporating Component Reuse, Remanufacture, and Recycle into Product Portfolio Design[J]. IEEE Transactions on Engineering Management, 2002,49(4):479-489.
[3]Okumura Susumu, Morikuni Toshimitsu, Okino Norio. Environmental Effects of Physical Life Span of a Reusable Unit Following Functional and Physical Failures in a Remanufacturing System[J]. International Journal of Production Research, 2003,41(16):3667-3687.
[4]Amezquita T, Hammond R, Salazar M, et al. Characterizing the Remanufacturability of Engineering Systems[C]// Proceedings 1995 ASME Advances in Design Automation Conference. Boston, 1995:271-278.
[5]Sundin E, Lindahl M. Rethinking Product Design for Remanufacturing to Facilitate Integrated Product Service Offerings[C]// Proceeding of Electronics and the Environment. San Francisco, 2008:1-6.
[6]Xing K, Belusko M, Luong L, et al. An Evaluation Model of Product Upgradeability for Remanufacture[J]. The International Journal of Advanced Manufacturing Technology, 2007,35(1/2):1-14.
[7]宋守许,冯艳,柯庆镝,等.基于寿命匹配的零部件再制造优化设计方法[J].中国机械工程,2015,26(10):1323-1329.
Song Shouxu, Feng Yan, Ke Qingdi, et al. Component Optimization Design for Remanufacturing Based on Life Matching[J]. China Mechanical Engineering, 2015,26(10):1323-1329.
[8]梁志杰,蔡志海. 装甲装备发动机再制造研究现状及其应用前景[J].装甲兵工程学院学报,2007(5):9-11.
Liang Zhijie, Cai Zhihai. Researching Status and Application Prospect of Remanufacturing Technology for Armored Equipment and Engines[J]. Journal of Academy of Armored Force Engineering, 2007(5):9-11.
[9]杨明,陈铭. 再制造发动机全生命周期评估[J].机械设计,2006(3):8-10.
Yang Ming, Chen Ming. Whole Life Cycle Assessment of Remanufactured Engine[J]. Journal of Machine Design,2006(3):8-10.
[10]李红霞,梁工谦. 再制造发动机寿命周期费用分析[J].现代制造工程,2006(11):77-79.
Li Hongxia, Liang Gongqian. The Life Cycle Cost Analysis of Remanufacture Engine[J]. Modern Manufacturing Engineering, 2006(11):77-79.
[11]蒋娟萍,梁工谦,张树娟. 面向主动再制造的航空发动机涡轮叶片需求分析研究[J].航空制造技术,2014(1/2):118-122.
Jiang Juanping, Liang Gongqian, Zhang Shujuan. Research on Requirement Analysis of Aeroengine Turbine Blade for Active Remanufacturing[J]. Aeronautical Manufacturing Technology, 2014(1/2):118-122.
[12]刘光复,刘涛,柯庆镝,等. 基于博弈论及神经网络的主动再制造时间区域抉择方法研究[J].机械工程学报,2013,49(7):29-35.
Liu Guangfu, Liu Tao, Ke Qingdi, et al. Time Interval Decision-making Methods for Active Remanufacturing Product Based on Game Theory and Neural Network[J]. Journal of Mechanical Engneering, 2013,49(7):29-35.
[13]刘志超.发动机原始制造与再制造全生命周期评价方法[D].大连:大连理工大学,2013.
[14]王涛.基于全生命周期理论的发动机再制造3E评价研究[D].长沙:湖南大学,2011.
[15]Warren R.Devries. Analysis of Material Removal Process [M]. New York, Springer-verlag, 1992.
[16]Gutowski T, Dahmus J, Thiriez A. Electrical Energy Requirements for Manufacturing Processes[C]// 13th CIRP International Conference on Life Cycle Engineering. Leuven, 2006:623-628.
[17]孟祥慧,谢友柏, 戴旭东. 典型磨损情况下的内燃机性能退化预测[J].摩擦学学报,2009,29(5):469-474.
Meng Xianghui, Xie Youbai, Dai Xudong. Analysis of Internal Combustion Engine Performance Degradation at Classic Wear Situations[J]. Tribology, 2009,29(5):469-474.
[18]欧阳光耀,常汉宝. 内燃机[M].北京:国防工业出版社,2011.
[19]黎苏,李明海. 内燃机原理[M].北京:中国水利水电出版社,2010.
[20]赵韩,张彦. 汽车发动机气缸磨损量的灰色预测[J].农业机械学报,2006,37(7):178-180.
Zhao Han, Zhang Yan.Grey Forecast of Cylinder Wear in the Automobile Engine[J]. Transactions of the Chinese Society for Agricultural Machinery, 2006,37(7):178-180.
|