[1]Anderson D M.Agile Product Development for Mass Customization:How to Develop and Deliver Products for Mass Customization,Niche Markets,JIT,Build-to-order and Flexible Manufacturing[M].New York:McGraw Hill,1997:10-20.
[2]Chin K S,Wong T N.Developing a Knowledge-based Injection Module Cost Estimation System by Decision Tables[J].International Journal of Ad-vanced Manufacturing Technology,1996,11(5):353-364.
[3]Veeramani D.Intelligent Cost Estimation of Die Castings through Application of Group Technology[J].Manufacturing Research and Technology,2007,24(8):283-298.
[4]Roy R,Souchoroukov P,Griggs T.Function-based Cost Estimating[J].International Journal of Pro-duction Research,2008,46(10):2621-2650.
[5]苏少辉[1],纪杨建[1],祁国宁[1],郑克勤[2].大批量定制环境下面向订单设计产品的制造成本估算方法研究[J].计算机集成制造系统,2007,13(11):2236-2242.
[6]应保胜[1],易建钢[1],张华[1].基于因特网的桥式起重机快速报价系统[J].计算机集成制造系统,2004,10(7):867-870.
[7]唐敏[1],刘红平[1].大规模定制环境下基于GBOM的精确报价实现[J].重庆大学学报:自然科学版,2006,29(6):158-162.
[8]肖刚[1],张立彬[1],高飞[1].基于实例库自主聚类的自适应产品快速报价策略研究[J].中国机械工程,2010(1):80-84.
[9]An Sung-Hoon,Kim Gwang-Hee,Kang Kyung-In.A Case-based Reasoning Cost Estimating Model Using Experience by Analytic Hierarchy Process[J].Building and Environment,2007,42(7):2573-2579.
[10]王新 [1],谭建荣 [2],张树有 [2].大批量定制下产品报价快速响应技术研究[J].计算机辅助设计与图形学学报,2005,17(8):1717-1724.
[11]李果[1],单汨源[2],陈芝[2].基于事例推理和小波网络的大规模定制产品快速成本估算方法研究[J].中国机械工程,2007,18(9):1080-1084.
[12]姜少飞[1],鲁聪达[1],卢纯福[1],潘双夏[2].基于成本聚类的产品设计早期阶段成本估算模型[J].机械工程学报,2007,43(6):205-209.
[13]赵延明[1],刘德顺[1],徐小艳[1],张俊[1].面向零件公差设计的产品质量损失成本模型[J].中国机械工程,2011,22(11):1347-1351.
[14]黎锁平[1],刘坤会[1].平滑系数自适应的二次指数平滑模型及其应用[J].系统工程理论与实践,2004,24(2):95-99. |