[1]Tanaka S, Araki M. A Branch and bound Algo rithm with Lagrangian Relaxation to Minimize Total Tardiness on Identical Parallel Machines[J]. International Journal of Production Economics, 2008, 113(1) : 446-458.
[2]王玉善 [1],叶东海 [2].多Agent系统中合同网协议的一种改进方案[J].上海师范大学学报:自然科学版,2005,34(4):22-27.
[3]宋海刚[1],陈学广[1].FIPA合同网协议的一种改进方案[J].华中科技大学学报:自然科学版,2004,32(7):31-33.
[4]Aknine S, Pinson S, Shakun M F. An Extended Multi--agent Negotiation Protocol [J]. Autonomous Agents and Multi-- agent Systems, 2004, 8 (1):1387-2532.
[5]Vojdani N. Distributed Manufacturing Control Using Fuzzy Contract Net[C]//Proceedings of IEEE Interna- tional Conference on Fuzzy Systems, New Orleans, 1996:1655-1659.
[6]Hsieh F S. Developing Cooperation Mechanism for Multi--agent Systems with Petri Nets[J]. Engineering Applications of Artificial Intelligence, 2009, 22(4/5) :616-627.
[7]潘全科[1],左凤朝[1],朱剑英[2].面向绿色制造模式调度的Petri网模型及优化算法[J].机械工程学报,2006,42(9):48-53.
[8]Paulo L, Francisco R. ADACOR..A Holonic Architecture for Agile and Adaptive Manufacturing Control[J]. Computers in Industry, 2006, 57(2):121- 130.
[9]Gao Q L, Luo X, Yang S Z. Stigmergic Cooperation Mechanism for Shop Floor Control System[J]. International Journal of Advanced Manufacturing Technology, 2005, 25(7/8): 743-753.
[10]Xiang W, LeeH P. Ant Colony Intelligence in Multi --agent Dynamic Manufacturing Scheduling[J]. Engineering Applications of Artificial Intelligence, 2008, 21(1) :73-85.
[11]Camazine S, Deneubourg J L, Franks N R, et al. Self--organization in Biological systems[M]. Princeton: Princeton University press, 2001.
[12]郜庆路,罗欣,杨叔子.分布式制造系统的控制协调及其方法分析[J].信息与控制,2003,32(4):295-299.
[13]王灵霞[1],张远平[1],吴佩莉[1].蚁群算法求解分布式系统任务分配问题[J].计算机工程与设计,2008,29(6):1472-1474.
[14]李言[1],刘永[1],李淑娟[1],杨明顺[1].面向多订单的JSP建模及其蚁群算法实现[J].中国机械工程,2009(18):2198-2202. |