[1]司光,魏伶华,黄伟和,等.影响钻井成本的主要因素与控制措施[J].天然气工业,2009,29(9):106-109.
SI Guang, WEI Linghua, HUANG Weihe, et al.Main Factors and Control Measures Affecting Drilling Costs[J].Natural Gas Industry, 2009,29(9):106-109.
[2]孙龙德,邹才能,朱如凯,等.中国深层油气形成、分布与潜力分析[J].石油勘探与开发,2013(6):641-649.
SUN Longde ,ZOU Caineng, ZHU Rukai, et al.Formation Distribution and Potential of Deep Hydrocarbon Resources in China[J].Petroleum Exploration and Development, 2013(6): 641-649.
[3]PESSIER R,DAMSCHEN M .Hybrid Bits Offer Distinct Advantages in Selected Roller-cone and PDC Bit Applications[J].SPE Drilling & Completion, 2011, 26(1):96-103.
[4]THOMSON I J, KRASUK R M,SILVA N,et al.Hybrid Drill Bit Improves Drilling Performance in Heterogeneous Formations in Brazil[J].Society of Petroleum Engineers, 2011: SPE-143686-MS.
[5]DI PASQUALE M, CALVARESI E, PECANTET S.A Breakthrough Performance for an Inland Application with a Hybrid Bit Technology[J].Society of Petroleum Engineers 2013: SPE-163436-MS.
[6]韩烈祥.国产PDC+牙轮复合钻头问世[J].钻采工艺,2013,36(5):36.
HAN Liexiang.Domestic PDC+Tooth Cone Composite Drills Come Out[J].Drilling & Production Technology, 2013,36(5):36.
[7]彭烨.双级PDC钻头的理论及试验研究[D].北京:中国石油大学,2008.
PENG Ye.The Theory and Testing Study of Two-stage PDC Bit[D].Beijing: China University of Petroleum, 2008.
[8]杨英祥.一种双心钻头:中国,CN201520066069.4 [P].2015-01-29.
YANG Yingxiang.Double Heart Drill: China, CN201520066069.4 [P].2015-01-29.
[9]黄文岩.一种钻扩联合钻头:中国,CN201520608185.4[P].2015-08-13.
HUANG Wenyan.Drilling and Expanding CombinedDrill:China,CN201520608185.4[P].2015-08-13.
[10]王清峰,朱才朝,宋朝省,等.牙轮钻头单牙轮的破岩仿真研究[J].振动与冲击,2010,29(10):108-112.
WANG Qingfeng, ZHU Caizhao, SONG Chaosheng, et al.Study on Rock Breaking Simulation of Roller Drill Bit Cone[J].Journal of Vibration And Shock,2010,29(10):108-112.
[11]费康,张建伟.ABAQUS在岩土工程中的应用[M].北京:中国水利水电出版社,2010:67-77.
FEI Kang, ZHANG Jianwei.Application of ABAQUS in Geotechnical Engineering[M].BeiJing: China Water Conservancy and Hydropower Press,2010:67-77.
[12]蔡美峰.岩石力学与工程[M].北京:科学出版社,2002:45-57.
CAI Meifeng.Rock Mechanics and Engineering[M].Beijing: Science Press,2002:45-57.
[13]ABAQUS, Inc.ABAQUS/Standard User's Manual Version6.5[M].Paris:ABAQUS Inc., 2005.
[14]蔡四维,蔡敏.混凝土的损伤断裂[M].北京:人民交通出版社,1999:35-41.
CAI Siwei, CAI Min.Concrete Damage Fracture[M].Beijing: China Communications Press, 1999:35-41.
[15]祝效华,汤历平,童华.高频扭转冲击钻进的减振与提速机理研究[J].振动与冲击,2012,31(20):75-78.
ZHU Xiaohua, TANG Liping, TONG Hua.Rock Breaking Mechanism of a High Frequency Torsional Impact Drilling[J].Journal of Vibration and Shock, 2012,31(20): 75-78.
[16]屠厚泽,高森.岩石破碎学[M].北京:地质出版社,1990:24-29.
TU Houze, GAO Sen.Theory of Rock Fragmentation[M].Beijing:Geological Publishing House, 1990:24-29.
[17]祝效华,汤历平,孟苹苹,等.PDC钻头粘滑振动理分析[J].石油矿场机械,2012,41(4):13-16.
ZHU Xiaohua, TANG Liping, MENG Pingping, et al.Stick-Slip Vibration Mechanism Analysis of PDC Bit[J].Oil Field Equipment,2012, 41(4): 13-16.
[18]KYLLINGSTAD A, HALSEY G W.A Study of Slip/Stick Motion of the Bit., SPE 16659[R].Dallas, TX:SPE, 1987. |